Show Job Controls
Bid Cobra

TRAVIS IH0035 (6391-94-001)

Items: 47

County: TRAVIS
Length: N/A
Highway: IH0035
District: AUSTIN
Control Number: 6391-94-001
DBE Goal: N/A
Project: BPM - 639194001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,440,875.00
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPAIR
Mail/Deliver Bids To: N/A
KATHLEEN NEWTON
KEVIN MOYER
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,440,875.00
1
$1,558,775.00
Over/Under Est: 8.18% $117,900.00
$1,593,890.00
Over/Under Est: 10.62% $153,015.00
Amt Left: 2.25% $35,115.00
Over/Under Est: 32.93% $474,480.00
Amt Left: 22.88% $356,580.00
Delta: -20.17% -$321,465.00

Bid Items & Bid Tabulations

47 Total 0 of 47
TRAVIS  |  IH0035  |  AUSTIN  |  6391-94-001  |  03/03/2022  |  $1,440,875.00  |  BPM - 639194001  |  BRIDGE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RESTEK, INC.
DIGG COMMERCIAL, LLC
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 235.000 $400.000 $50.000 $50.000 $128.000
REMOVING CONC (PILE ENCASEMENT)
CY 20.000 $150.000 $250.000 $700.000 $660.000
FLOWABLE BACKFILL
CY 185.000 $350.000 $300.000 $190.000 $565.000
CL C CONC(PILE ENCASEMENT)
LF 110.000 $1,000.000 $500.000 $300.000 $525.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 125.000 $125.000 $150.000 $250.000 $315.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 75.000 $165.000 $225.000 $250.000 $400.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 410.000 $150.000 $150.000 $225.000 $250.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 455.000 $145.000 $150.000 $250.000 $250.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 10.000 $2,000.000 $2,000.000 $2,000.000 $5,000.000
RIPRAP (CONC)(5 IN)
CY 135.000 $400.000 $850.000 $800.000 $1,100.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 80.000 $225.000 $225.000 $250.000 $330.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 250.000 $250.000 $275.000 $180.000 $240.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 250.000 $250.000 $300.000 $185.000 $240.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 250.000 $250.000 $325.000 $190.000 $265.000
GABION MATTRESSES (GALV)(12 IN)
SY 100.000 $100.000 $131.250 $165.000 $140.000
GABIONS (3' X 3')(GALV)
CY 400.000 $200.000 $312.500 $210.000 $290.000
RAISING EXIST STRUCT
LS 1.000 $15,000.000 $50,000.000 $145,000.000 $62,000.000
MOBILIZATION (CALLOUT)
EA 20.000 $7,500.000 $2,500.000 $1.000 $2,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $3.000 $5.000 $4.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.250 $2.500 $1.000 $3.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 100.000 $100.000 $85.000 $100.000 $100.000
TREE REMOVAL (4" - 12" DIA)
EA 50.000 $600.000 $100.000 $200.000 $100.000
TREE REMOVAL (12" - 18" DIA)
EA 30.000 $800.000 $125.000 $400.000 $120.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 10.000 $250.000 $200.000 $1,000.000 $1,400.000
CONCRETE RAIL REPAIR (MISC)
LF 10.000 $35.000 $250.000 $1,000.000 $1,900.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 10.000 $120.000 $250.000 $1,000.000 $2,500.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 75.000 $60.000 $50.000 $75.000 $95.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 130.000 $75.000 $100.000 $130.000 $130.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 75.000 $40.000 $75.000 $105.000 $100.000
CARBON FIBER REINF POLYMER PROTECTION
SF 200.000 $86.000 $75.000 $160.000 $300.000
CONCRETE BEAM REPAIR
EA 10.000 $5,000.000 $5,500.000 $5,000.000 $8,000.000
CONCRETE BEAM REPAIR (CFRP)
EA 15.000 $8,000.000 $6,500.000 $3,000.000 $11,000.000
CONCRETE BEAM REP(STRAND SPLICE & CFRP)
EA 5.000 $5,300.000 $15,000.000 $10,000.000 $19,000.000
CONCRETE BEAM REP (STRAND SPLICE)
EA 5.000 $5,300.000 $10,000.000 $7,000.000 $9,000.000
DEWATERING BAGS
EA 20.000 $1,500.000 $200.000 $100.000 $4,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $200.000 $225.000 $1.000 $130.000
TMA (STATIONARY)
DAY 50.000 $325.000 $500.000 $8,000.000 $600.000
LANE CLOSURE (SETUP AND REMOV)(TY 1)
EA 15.000 $500.000 $2,300.000 $1.000 $390.000
LANE CLOSURE (SETUP AND REMOV)(TY 2)
EA 20.000 $500.000 $2,300.000 $1.000 $390.000
LANE CLOSURE (SETUP AND REMOV)(TY 3)
EA 10.000 $500.000 $1,785.000 $1.000 $600.000
LANE CLOSURE (SETUP AND REMOV)(TY 4)
EA 15.000 $500.000 $2,300.000 $1.000 $700.000
LANE CLOSURE (SETUP AND REMOV)(TY 5)
EA 10.000 $500.000 $1,785.000 $1.000 $700.000
LANE CLOSURE (SETUP AND REMOV)(TY 6)
EA 10.000 $500.000 $2,350.000 $1.000 $1,000.000
LANE CLOSURE (SETUP AND REMOV)(TY 9)
EA 10.000 $500.000 $575.000 $1.000 $325.000
LANE CLOSURE (SETUP AND REMOV)(TY 12)
EA 10.000 $500.000 $1,150.000 $1.000 $450.000
LANE CLOSURE (SETUP AND REMOV)(TY 16)
EA 10.000 $500.000 $1,785.000 $1.000 $400.000
LANE CLOSURE (SETUP AND REMOV)(TY 17)
EA 10.000 $815.000 $2,035.000 $1.000 $300.000
Totals: $1,440,875.000 $1,558,775.000 $1,593,890.000 $1,915,355.000