Bid Cobra

TRAVIS IH0035 (6387-69-001)

Items: 30

County: TRAVIS
Length: N/A
Highway: IH0035
District: AUSTIN
Control Number: 6387-69-001
DBE Goal: 0.0%
Project: RMC - 638769001
Guaranty: N/A
Time: 85 W
Engineer's Estimate: $648,320.40
Date: 12/06/2023 (2 years ago)
Contract Number: N/A
Type: TRAFFIC SIGNAL MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$648,320.40
$591,420.00
Over/Under Est: -8.78% -$56,900.40
Over/Under Est: 16.37% $106,114.60
Amt Left: 27.56% $163,015.00

Bid Items & Bid Tabulations

30 Total 0 of 30
TRAVIS  |  IH0035  |  AUSTIN  |  6387-69-001  |  12/06/2023  |  $648,320.40  |  RMC - 638769001  |  TRAF SIGNAL MAINT  |  85 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELECNOR BELCO ELECTRIC, INC.
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SPOT SODDING
SY 10.000 $15.000 $30.000 $150.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 10.000 $3.000 $50.000 $75.000
FLOWABLE BACKFILL
CY 10.000 $1,000.000 $800.000 $750.000
MOBILIZATION
LS 1.000 $63,000.000 $45,000.000 $71,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,000.000 $4,000.000 $2,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $6.230 $8.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $2.320 $4.000 $4.000
CONDT (PVC) (SCH 40) (2")
LF 235.000 $16.380 $45.000 $25.000
CONDT (PVC) (SCH 40) (3")
LF 240.000 $20.750 $50.000 $30.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 335.000 $30.000 $55.000 $100.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 360.000 $35.000 $60.000 $115.000
ELEC CONDR (NO.14) INSULATED
LF 200.000 $1.000 $4.000 $3.000
ELEC CONDR (NO.6) BARE
LF 635.000 $1.800 $8.000 $3.000
ELEC CONDR (NO.6) INSULATED
LF 1,270.000 $1.930 $8.000 $3.500
GROUND BOX TY A (122311)W/APRON
EA 9.000 $1,200.000 $1,800.000 $1,400.000
FIBER OPTIC PIGTAIL (12 FIBER)
LF 100.000 $3.000 $10.000 $35.000
FIBER OPTIC CABLE ROAD MARKER
EA 5.000 $220.000 $1,500.000 $300.000
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 13.000 $1,900.000 $7,000.000 $11,250.000
FIBER OPTIC FUSION SPLICE
EA 3,000.000 $32.000 $30.000 $23.000
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 5.000 $18,800.000 $16,000.000 $14,000.000
CONDUIT (PREPARE)
LF 610.000 $4.700 $3.000 $1.000
GROUND BOX (PREPARE)
EA 8.000 $350.000 $250.000 $350.000
ITS SYSTEM INTEGRATION
LS 1.000 $50,000.000 $30,000.000 $7,500.000
TMA (STATIONARY)
DAY 25.000 $500.000 $200.000 $350.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 5.000 $9,126.000 $9,300.000 $8,500.000
REMOVE HUB BUILDING
EA 5.000 $20,800.000 $3,000.000 $20,000.000
ETHERNET SWITCH (INSTALL ONLY)
EA 5.000 $2,300.000 $4,750.000 $250.000
ETHERNET SURGE PROTECTORS
EA 48.000 $90.000 $150.000 $1,000.000
RELOCATE EXISTING ITS EQUIPMENT
EA 5.000 $5,500.000 $1,500.000 $4,500.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $757.500 $850.000 $2,500.000
Totals: $648,320.400 $591,420.000 $754,435.000