Show Job Controls
Bid Cobra

TRAVIS US0183 (6353-05-001)

Items: 24

County: TRAVIS
Length: N/A
Highway: US0183
District: AUSTIN
Control Number: 6353-05-001
DBE Goal: N/A
Project: BPM - 635305001
Guaranty: N/A
Time: 32 W
Engineer's Estimate: $124,080.38
Date: 09/15/2020 (5 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$124,080.38
$127,634.50
Over/Under Est: 2.86% $3,554.12
Over/Under Est: 6.55% $8,122.22
Amt Left: 3.58% $4,568.10
Over/Under Est: 8.25% $10,232.52
Amt Left: 5.23% $6,678.40
Delta: -1.60% -$2,110.30
$148,656.33
Over/Under Est: 19.81% $24,575.95
Amt Left: 16.47% $21,021.83
Delta: -10.68% -$14,343.43
Over/Under Est: 29.37% $36,448.22
Amt Left: 25.77% $32,894.10
Delta: -7.99% -$11,872.27
Over/Under Est: 32.85% $40,763.12
Amt Left: 29.15% $37,209.00
Delta: -2.69% -$4,314.90
Over/Under Est: 79.52% $98,672.62
Amt Left: 74.52% $95,118.50
Delta: -35.13% -$57,909.50

Bid Items & Bid Tabulations

24 Total 0 of 24
TRAVIS  |  US0183  |  AUSTIN  |  6353-05-001  |  09/15/2020  |  $124,080.38  |  BPM - 635305001  |  BRIDGE PREVENT MAINT  |  32 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
BECK-REIT & SONS, LTD.
TALBRAN ENTERPRISES LLC
TEXAS ROAD CONSTRUCTION, LLC
RESTEK, INC.
SJ&J CONSTRUCTION, LLC
CANNON ASPHALT GROUP LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 2.500 $2,000.000 $2,000.000 $1,000.000 $2,000.000 $1,500.000 $1,500.000 $4,500.000 $5,500.000
FURNISHING AND PLACING TOPSOIL (4")
SY 760.000 $1.000 $5.000 $4.000 $4.000 $6.000 $6.000 $5.000 $10.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 760.000 $0.700 $0.550 $2.000 $10.000 $0.950 $1.000 $5.000 $5.000
VEGETATIVE WATERING
MG 113.060 $13.000 $10.000 $10.000 $15.000 $63.500 $10.000 $25.000 $50.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 60.000 $2.000 $5.000 $3.000 $5.000 $3.600 $3.500 $30.000 $10.000
FLOWABLE BACKFILL
CY 1.000 $200.000 $1,500.000 $1,500.000 $220.000 $2,000.000 $220.000 $750.000 $1,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.000 $175.000 $300.000 $280.000 $100.000 $375.000 $145.000 $225.000 $1,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 85.000 $140.000 $177.000 $190.000 $170.000 $150.000 $180.000 $155.000 $185.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 205.000 $150.000 $188.000 $220.000 $200.000 $185.000 $220.000 $190.000 $185.000
GABION MATTRESSES (GALV)(6 IN)
SY 15.000 $85.000 $100.000 $180.000 $200.000 $175.000 $140.000 $350.000 $200.000
MOBILIZATION
LS 1.000 $9,003.000 $12,000.000 $21,000.000 $20,000.000 $22,000.000 $30,000.000 $9,500.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $8,000.000 $1,000.000 $1,000.000 $5,000.000 $2,500.000 $5,000.000 $3,500.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 95.000 $27.000 $35.000 $35.000 $35.000 $30.000 $24.000 $35.000 $30.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 65.000 $55.000 $44.440 $55.000 $70.000 $58.000 $28.000 $65.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $9.000 $10.000 $10.000 $15.000 $13.330 $14.000 $4.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 334.000 $23.000 $25.550 $30.000 $10.000 $17.330 $18.000 $20.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 334.000 $8.000 $10.000 $10.000 $5.000 $12.000 $9.000 $8.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 460.000 $2.500 $3.330 $2.000 $3.000 $4.000 $3.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 460.000 $0.710 $1.330 $1.000 $1.000 $1.500 $1.000 $1.000 $2.000
REALIGN POSTS
EA 20.000 $20.000 $122.000 $200.000 $50.000 $75.000 $10.000 $100.000 $500.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 3.000 $40.000 $200.000 $300.000 $1,000.000 $250.000 $150.000 $250.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 110.000 $70.000 $105.000 $1.000 $5.000 $90.000 $150.000 $70.000 $150.000
TMA (STATIONARY)
DAY 32.000 $195.000 $125.000 $1.000 $1.000 $200.000 $150.000 $350.000 $350.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 30.000 $115.000 $66.000 $110.000 $10.000 $135.000 $60.000 $650.000 $250.000
Totals: $124,080.380 $127,634.500 $132,202.600 $134,312.900 $148,656.330 $160,528.600 $164,843.500 $222,753.000