Show Job Controls
Bid Cobra

TRAVIS IH0035 (6346-84-001)

Items: 97

County: TRAVIS
Length: N/A
Highway: IH0035
District: AUSTIN
Control Number: 6346-84-001
DBE Goal: N/A
Project: RMC - 634684001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $645,307.42
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: ILLUMINATION MAINTENANCE REMOVAL DISTRICTWIDE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$645,307.42
Over/Under Est: 2.05% $13,212.58
Over/Under Est: 52.09% $336,120.28
Amt Left: 49.04% $322,907.70

Bid Items & Bid Tabulations

97 Total 0 of 97
TRAVIS  |  IH0035  |  AUSTIN  |  6346-84-001  |  12/03/2019  |  $645,307.42  |  RMC - 634684001  |  ILLUM MAINT RMVL DISTRICTWIDE  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
AMERICAN LIGHTING AND SIGNALIZATION, LLC
REMOVING CONC (RIPRAP)
CY 10.000 $128.540 $300.000 $88.360
REMOVING CONC (FOUNDATIONS)
CY 10.000 $418.800 $400.000 $1,096.000
REMOVING CONC (SIDEWALKS
CY 10.000 $200.000 $300.000 $93.710
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 200.000 $100.000 $150.000 $259.290
RIPRAP (CONC) (CL B) (4")
CY 16.000 $659.220 $600.000 $651.140
MOBILIZATION (CALLOUT 1)
EA 84.000 $1,000.000 $1,100.000 $3,138.360
MOBILIZATION (CALLOUT 2)
EA 16.000 $1,400.000 $1,200.000 $3,320.470
TEMP SEDMT CONT FENCE (INSTALL)
LF 40.000 $4.370 $2.000 $9.570
TEMP SEDMT CONT FENCE (REMOVE)
LF 40.000 $1.170 $1.000 $6.320
REMOVE RD IL ASM (BRIDGE MOUNT)
EA 4.000 $220.600 $350.000 $558.960
REMOVE RD IL ASM (SHOE-BASE)
EA 4.000 $350.000 $350.000 $824.480
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $300.000 $450.000 $868.480
REMOVE RD IL ASM (U/P)
EA 4.000 $75.000 $250.000 $164.490
IN RD IL AM (TY SP) 48S-10-10 (400W) S
EA 4.000 $4,000.000 $3,800.000 $2,950.860
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,600.000 $1,100.000 $859.790
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,050.000 $1,100.000 $916.290
IN RD IL (TY SA) 40S-8 (250W EQ) LED
EA 4.000 $3,500.000 $2,000.000 $2,023.690
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 10.000 $4,000.000 $2,700.000 $2,447.470
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 10.000 $1,000.000 $3,500.000 $3,040.070
CONDT (PVC) (SCH 40) (2")
LF 2,400.000 $9.620 $8.000 $13.150
CONDT (PVC) (SCH 40) (2") (BORE)
LF 200.000 $30.000 $60.000 $42.460
CONDT (RM) (1 1/2")
LF 200.000 $12.110 $17.000 $14.820
CONDT (RM) (2")
LF 100.000 $21.410 $19.000 $28.470
ELEC CONDR (NO.10) BARE
LF 2,400.000 $2.000 $1.000 $0.830
ELEC CONDR (NO.10) INSULATED
LF 400.000 $1.180 $1.000 $2.570
ELEC CONDR (NO.8) BARE
LF 400.000 $1.580 $1.000 $1.200
ELEC CONDR (NO.8) INSULATED
LF 4,800.000 $1.850 $2.000 $2.080
ELEC CONDR (NO.6) BARE
LF 200.000 $1.000 $3.000 $2.050
ELEC CONDR (NO.6) INSULATED
LF 400.000 $2.000 $4.000 $2.590
ELEC CONDR (NO.4) BARE
LF 400.000 $2.000 $3.000 $2.620
ELEC CONDR (NO.4) INSULATED
LF 400.000 $2.680 $4.000 $2.680
ELEC CONDR (NO.2) BARE
LF 400.000 $3.560 $3.000 $2.800
ELEC CONDR (NO.2) INSULATED
LF 400.000 $3.650 $4.000 $2.800
GROUND BOX TY A (122311)W/APRON
EA 20.000 $700.000 $800.000 $1,108.130
REMOVE GROUND BOX
EA 4.000 $280.490 $175.000 $484.610
REMOVE ELECTRICAL SERVICES
EA 4.000 $500.000 $400.000 $703.880
ELC SRV TY A 120/240 100(NS)SS(E)GC(O)
EA 4.000 $5,381.930 $4,000.000 $6,071.920
ELC SRV TY A 120/240 100(NS)SS(E)SP(O)
EA 4.000 $6,500.000 $4,500.000 $4,306.290
ELC SRV TY A 240/480 100(NS)SS(E)GC(O)
EA 4.000 $6,197.680 $5,000.000 $6,241.420
ELC SRV TY A 240/480 100(NS)SS(E)PS(U)
EA 8.000 $4,958.890 $4,500.000 $4,660.450
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
EA 4.000 $5,000.000 $5,000.000 $4,529.470
INSTALL ELECTRICAL SPLICE
EA 100.000 $75.860 $100.000 $99.100
REPAIR UNDERGROUND CONDUIT
EA 4.000 $25.080 $400.000 $1,760.210
REPAIR UNDERGROUND DUCT CABLE
EA 4.000 $25.080 $500.000 $1,690.150
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 4.000 $800.000 $500.000 $1,725.440
REMOVE UNDERPASS LUMINAIRE (HPS)
EA 4.000 $294.660 $200.000 $89.860
REMOVE INDUCTION FLUORESCENT FIXTURE
EA 4.000 $300.000 $100.000 $99.760
REMOVE LUMINAIRE FIXTURE (LED)
EA 10.000 $100.300 $100.000 $229.980
REPLACE LUMINAIRE POLE
EA 6.000 $1,517.100 $2,000.000 $1,941.110
MAINTAIN ROADWAY ILLUMINATION
EA 10.000 $1,000.000 $200.000 $506.200
MAINTAIN HIGH MAST ILLUMINATION
EA 10.000 $1,000.000 $400.000 $1,158.150
MAINTAIN OVERHEAD SIGN LIGHTING
EA 10.000 $300.000 $300.000 $134.790
MAINTAIN UNDERPASS FIXTURE
EA 10.000 $250.000 $250.000 $92.150
MAINTAIN INDUCTION FLUORESCENT FIXTURE
EA 10.000 $250.000 $250.000 $57.120
REPLACE TIMBER SERVICE POLE
EA 4.000 $666.590 $500.000 $442.600
REPLACE STEEL SERVICE POLE
EA 4.000 $3,461.300 $600.000 $1,263.320
REPLACE CONCRETE SERVICE POLE
EA 4.000 $200.600 $800.000 $1,398.860
INSTALL FOUNDATION
EA 2.000 $1,204.120 $900.000 $2,356.900
REPLACE TRANSFORMER BASE
EA 20.000 $300.000 $300.000 $350.640
REPLACE TRANSFORMER BASE COVER
EA 4.000 $17.670 $50.000 $21.090
REPLACE HAND HOLE COVER
EA 20.000 $50.000 $40.000 $27.420
INSTALL GROUND ROD
EA 40.000 $50.000 $40.000 $74.740
REPLACE BALLAST
EA 4.000 $180.980 $50.000 $89.860
REPLACE BALLAST (HIGH MAST LIGHTING)
EA 4.000 $150.000 $150.000 $89.860
INSTALL FUSED DISCONNECT
EA 4.000 $100.300 $100.000 $267.380
REPLACE FUSED DISCONNECT
EA 4.000 $150.000 $150.000 $295.980
REPLACE LAMP (POLE MOUNT FIXTURE)
EA 20.000 $155.690 $150.000 $119.390
REPLACE LAMP (UNDERPASS FIXTURE)
EA 20.000 $50.000 $40.000 $44.930
REPLACE LAMP (WALL PACK FIXTURE)
EA 20.000 $50.000 $40.000 $37.320
REPLACE LAMP (HIGH MAST LIGHTING)
EA 20.000 $100.000 $50.000 $64.730
REPLACE WALL PACK LUMINAIRE
EA 10.000 $100.000 $40.000 $79.960
REPLACE FUSE
EA 50.000 $70.800 $50.000 $77.030
REPLACE FUSE HOLDER
EA 100.000 $54.360 $60.000 $45.610
REPLACE BREAKAWAY FUSE HOLDER
EA 30.000 $129.700 $150.000 $83.990
REPLACE STARTING AID
EA 20.000 $100.000 $75.000 $12.530
REPLACE PHOTOCELL AND BRACKET
EA 20.000 $210.750 $75.000 $37.320
REPLACE HAND-OFF-AUTO SWITCH
EA 4.000 $100.000 $100.000 $42.180
REPLACE CONTACTOR
EA 4.000 $250.000 $150.000 $154.420
REPLACE METER BASE
EA 4.000 $500.000 $400.000 $159.920
REPLACE BREAKER PANEL
EA 4.000 $500.000 $400.000 $434.660
INSTALL CIRCUIT BREAKER
EA 10.000 $300.000 $100.000 $49.330
REPLACE CIRCUIT BREAKER
EA 4.000 $500.000 $100.000 $49.330
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 10.000 $321.480 $500.000 $308.840
TROUBLESHOOT FOR REPAIRS
HR 40.000 $149.970 $125.000 $154.420
REPLACE LUMINAIRES
EA 100.000 $150.000 $165.000 $235.250
REPLACE PHOTOCELL
EA 20.000 $100.000 $100.000 $18.660
TMA (STATIONARY)
DAY 50.000 $204.010 $150.000 $376.030
1 LN CLOSURE 2 LN RD NO SHOULDERS
HR 40.000 $165.830 $250.000 $330.000
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
HR 40.000 $81.890 $100.000 $330.000
1 LN CLOSURE 4 LN RD
HR 40.000 $125.000 $150.000 $330.000
2 LN CLOSURE 4 LN RD
HR 40.000 $133.820 $200.000 $330.000
FREEWAY 1 LANE CLOSURE
HR 40.000 $152.940 $300.000 $330.000
FREEWAY 2 LANE CLOSURE
HR 40.000 $163.890 $400.000 $330.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 40.000 $112.690 $150.000 $220.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 40.000 $125.000 $250.000 $330.000
WORK AREA ON SHOULDER
HR 40.000 $92.220 $300.000 $253.080
PILOT VEHICLE AND OPERATOR
HR 5.000 $50.000 $200.000 $550.000
Totals: $645,307.420 $658,520.000 $981,427.700