TRAVIS IH0035 (6324-19-001)

Items: 32

County: TRAVIS
Length: N/A
Highway: IH0035
District: AUSTIN
Control Number: 6324-19-001
DBE Goal: N/A
Project: RMC - 632419001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,180,500.00
Date: 11/02/2017 (8 years ago)
Contract Number: N/A
Type: CONCRETE REPAIRS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,180,500.00
$1,343,150.00
Over/Under Est: 13.78% $162,650.00
Over/Under Est: 48.98% $578,200.00
Amt Left: 30.94% $415,550.00

Bid Items & Bid Tabulations

32 Total 0 of 32
TRAVIS  |  IH0035  |  AUSTIN  |  6324-19-001  |  11/02/2017  |  $1,180,500.00  |  RMC - 632419001  |  CONC REPAIRS  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
O. TREVINO CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 1,000.000 $30.000 $50.000 $35.000
FULL - DEPTH REPAIR CRCP (10")
SY 100.000 $300.000 $300.000 $750.000
FULL - DEPTH REPAIR CRCP (11")
SY 100.000 $300.000 $365.000 $775.000
FULL - DEPTH REPAIR CRCP (13")
SY 100.000 $300.000 $370.000 $835.000
FULL - DEPTH REPAIR CRCP (14")
SY 100.000 $300.000 $385.000 $860.000
HALF - DEPTH REPAIR CRCP (10")
SY 100.000 $300.000 $150.000 $575.000
HALF - DEPTH REPAIR CRCP (11")
SY 100.000 $300.000 $180.000 $625.000
HALF - DEPTH REPAIR CRCP (13")
SY 100.000 $300.000 $185.000 $700.000
HALF - DEPTH REPAIR CRCP (14")
SY 100.000 $300.000 $195.000 $800.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 200.000 $100.000 $300.000 $75.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 200.000 $150.000 $500.000 $200.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 500.000 $250.000 $175.000 $175.000
RIPRAP (CONC)(5 IN)
CY 150.000 $360.000 $700.000 $850.000
MOBILIZATION (CALLOUT 1)
EA 80.000 $3,000.000 $1,300.000 $500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.500 $15.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.500 $5.000 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 10,000.000 $1.100 $0.500 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 30,000.000 $1.000 $0.500 $2.500
CRACK CLEANING AND SEALING (CRCP)
LF 10,000.000 $3.000 $9.000 $4.300
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 1,250.000 $68.000 $75.000 $80.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 400.000 $250.000 $250.000 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $30,000.000 $25,000.000
TMA (STATIONARY)
DAY 300.000 $100.000 $350.000 $176.500
1 LN CLOSURE 2 LN RD NO SHOULDERS
HR 10.000 $150.000 $200.000 $600.000
1 LN CLOSURE 2 LN RD PAVED SHOULDERS
HR 10.000 $150.000 $190.000 $600.000
1 LN CLOSURE 4 LN RD
HR 50.000 $200.000 $175.000 $450.000
2 LN CLOSURE 4 LN RD
HR 50.000 $200.000 $195.000 $500.000
FREEWAY 1 LANE CLOSURE
HR 200.000 $220.000 $200.000 $500.000
FREEWAY 2 LANE CLOSURE
HR 200.000 $220.000 $215.000 $550.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 50.000 $100.000 $250.000 $575.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 100.000 $200.000 $160.000 $500.000
WORK AREA ON SHOULDER
HR 10.000 $150.000 $100.000 $400.000
Totals: $1,180,500.000 $1,343,150.000 $1,758,700.000