TRAVIS IH0035 (6310-22-001)

Items: 73

County: TRAVIS
Length: N/A
Highway: IH0035
District: AUSTIN
Control Number: 6310-22-001
DBE Goal: N/A
Project: RMC - 631022001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $5,885,260.00
Date: 12/01/2016 (9 years ago)
Contract Number: N/A
Type: REPAIR, REPLACE AND UPGRADE MBGF
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$5,885,260.00
$5,739,451.50
Over/Under Est: -2.48% -$145,808.50
$6,041,570.00
Over/Under Est: 2.66% $156,310.00
Amt Left: 5.26% $302,118.50
$7,419,393.00
Over/Under Est: 26.07% $1,534,133.00
Amt Left: 29.27% $1,679,941.50
Delta: -22.81% -$1,377,823.00

Bid Items & Bid Tabulations

73 Total 0 of 73
TRAVIS  |  IH0035  |  AUSTIN  |  6310-22-001  |  12/01/2016  |  $5,885,260.00  |  RMC - 631022001  |  REPAIR, REPLACE AND UPGRADE MBGF  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
K-BAR SERVICES, INC.
ISI CONTRACTING, INC.
ICA MAINTENANCE, INC.
REMOVING CONC (RIPRAP)
SY 10.000 $21.000 $80.000 $35.000 $50.000
RIPRAP (CONC)(5 IN)
CY 15.000 $500.000 $650.000 $750.000 $575.000
RETROFIT RAIL (TY T221)
LF 100.000 $220.000 $105.000 $200.000 $222.000
MOBILIZATION (CALLOUT)
EA 2,000.000 $200.000 $0.500 $90.000 $207.000
MTL W-BEAM GD FEN (TIM POST)
LF 3,000.000 $19.000 $28.000 $25.000 $24.000
MTL W-BEAM GD FEN (STEEL POST)
LF 3,000.000 $25.000 $20.000 $26.000 $31.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 133.000 $1,100.000 $1,100.000 $1,400.000 $1,350.000
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $3.000 $3.000 $2.000 $9.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,250.000 $3,000.000 $2,800.000 $3,970.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $10,000.000 $20,000.000 $25,000.000 $20,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,800.000 $1,500.000 $2,400.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $800.000 $1,500.000 $750.000 $2,500.000
CHAIN LINK FENCE (INSTALL) (6')
LF 2,000.000 $30.000 $15.000 $20.000 $17.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 80.000 $20.000 $26.500 $14.000 $19.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 50.000 $5.000 $26.500 $20.000 $22.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 300.000 $5.000 $26.500 $20.000 $22.000
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
EA 50.000 $15.000 $26.500 $18.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 50.000 $1.000 $28.000 $20.000 $8.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 50.000 $1.000 $27.500 $4.000 $8.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 50.000 $1.000 $25.000 $4.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 375.000 $1.000 $26.500 $20.000 $24.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 60,000.000 $15.000 $20.150 $17.500 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 1,000.000 $30.000 $35.000 $35.000 $29.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 150.000 $20.000 $75.000 $35.000 $26.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 2,400.000 $100.000 $40.000 $40.000 $16.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 6,000.000 $10.000 $15.000 $48.000 $63.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 3,500.000 $10.000 $15.000 $60.000 $70.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $100.000 $180.000 $150.000 $150.000
REALIGN POSTS
EA 900.000 $15.000 $30.000 $6.000 $24.000
REMOVE & REPLACE BLOCKOUT
EA 4,500.000 $5.000 $3.000 $8.000 $20.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 10.000 $5.000 $55.000 $10.000 $10.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 3.000 $5.000 $100.000 $50.000 $56.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $10.000 $100.000 $150.000 $100.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $60.000 $150.000 $110.000 $110.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 35.000 $2,700.000 $3,000.000 $3,800.000 $3,275.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 1,200.000 $2,000.000 $1,950.000 $1,875.000 $2,050.000
REMOVE AND REPLACE (TRACC)
EA 1.000 $12,000.000 $25,000.000 $18,000.000 $20,200.000
REMOVE AND REPLACE (WIDE TRACC)
EA 1.000 $15,000.000 $26,500.000 $28,000.000 $24,600.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 1.000 $15,000.000 $26,500.000 $23,000.000 $30,000.000
REMOVE AND REPLACE (WIDE REACT 350)
EA 1.000 $20,000.000 $26,500.000 $35,000.000 $29,500.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 1.000 $320.000 $1,695.000 $3,000.000 $4,250.000
REPAIR (TRACC)
EA 7.000 $2,000.000 $3,800.000 $3,000.000 $4,700.000
REPAIR (WIDE TRACC)
EA 1.000 $2,000.000 $7,500.000 $5,000.000 $3,125.000
REPAIR (NARROW REACT 350)
LF 70.000 $500.000 $350.000 $300.000 $250.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $17,000.000 $26,560.000 $18,000.000 $22,000.000
REPAIR (NARROW QUAD)
EA 140.000 $1,500.000 $1,500.000 $1,200.000 $2,100.000
REMOVE AND REPLACE (WIDE QUAD)
EA 2.000 $20,000.000 $26,380.000 $25,000.000 $31,000.000
REPAIR (WIDE QUAD)
EA 180.000 $2,000.000 $1,700.000 $1,400.000 $5,100.000
REPAIR (REACT 350) (W)
EA 1.000 $5,000.000 $7,500.000 $4,000.000 $23,125.000
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
EA 10.000 $500.000 $1,000.000 $1,100.000 $1,000.000
REPAIR (HEX - FOAM SANDWICH SYS)
EA 10.000 $600.000 $800.000 $700.000 $1,250.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $20,000.000 $25,650.000 $22,000.000 $500.000
REPAIR (SMTC) (N)
EA 1.000 $3,000.000 $4,050.000 $5,000.000 $500.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $20,000.000 $25,650.000 $30,000.000 $500.000
REPAIR (SMTC) (W)
EA 1.000 $1,000.000 $4,050.000 $5,000.000 $500.000
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
EA 5.000 $400.000 $840.000 $400.000 $500.000
REPAIR (BEAT - SSCC)
EA 2.000 $2,000.000 $1,900.000 $2,000.000 $2,500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 10.000 $100.000 $185.000 $200.000 $125.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 200.000 $20.000 $65.000 $100.000 $40.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 130.000 $300.000 $240.000 $150.000 $156.000
TMA (STATIONARY)
DAY 130.000 $250.000 $975.000 $350.000 $1,000.000
1 LN CLOSURE - 2 LN RD, NO SHOULDER
EA 12.000 $500.000 $1,000.000 $1,600.000 $1,875.000
1 LN CLOSURE - 2 LN RD, PAVED SHOULDER
EA 12.000 $300.000 $1,000.000 $1,600.000 $1,875.000
1 LN CLOSURE - 4 LN RD
EA 60.000 $1,200.000 $1,050.000 $1,300.000 $1,250.000
FREEWAY 1 LANE CLOSURE
EA 25.000 $1,000.000 $1,100.000 $2,000.000 $1,875.000
EXIT OR ENTRANCE RAMP CLOSURE
EA 25.000 $200.000 $1,000.000 $1,700.000 $2,125.000
ONE LANE FRONTAGE ROAD CLOSURE
EA 25.000 $800.000 $1,050.000 $1,300.000 $2,125.000
1 LN CLOSURE - 2 LN RD, NO SHOULDER
HR 72.000 $260.000 $98.000 $150.000 $235.000
1 LN CLOSURE - 2 LN RD, PAVED SHOULDER
HR 72.000 $210.000 $99.000 $150.000 $235.000
1 LN CLOSURE - 4 LN RD
HR 360.000 $210.000 $102.000 $150.000 $156.000
FREEWAY 1 LANE CLOSURE
HR 150.000 $290.000 $110.000 $225.000 $235.000
EXIT OR ENTRANCE RAMP CLOSURE
HR 150.000 $230.000 $67.000 $195.000 $266.000
ONE LANE FRONTAGE ROAD CLOSURE
HR 150.000 $240.000 $87.000 $125.000 $266.000
Totals: $5,885,260.000 $5,739,451.500 $6,041,570.000 $7,419,393.000