Show Job Controls
Bid Cobra

TRAVIS FM 734 (3417-03-027)

Items: 61

County: TRAVIS
Length: N/A
Highway: FM 734
District: AUSTIN
Control Number: 3417-03-027
DBE Goal: N/A
Project: C 3417-3-27
Guaranty: N/A
Time: 372 WORKING DAYS
Engineer's Estimate: $6,609,086.09
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,609,086.09
$4,925,236.00
Over/Under Est: -25.48% -$1,683,850.09
$5,983,308.55
Over/Under Est: -9.47% -$625,777.54
Amt Left: 21.48% $1,058,072.55
Over/Under Est: 3.65% $240,918.61
Amt Left: 39.08% $1,924,768.70
Delta: -14.49% -$866,696.15
Subcontractor Percentage Amount
FIBERTEL, LLC 19.39% $1,005,850.99
LAWLEY CONTRACTING, LLC 7.37% $382,316.75
APTUS GROUP USA, LLC 3.57% $185,192.78
ROADWAY SPECIALTIES, INC. 1.64% $85,074.55
TEXAS TRAFFIC AND BARRICADE, LLC 1.16% $60,174.69
TRP CONSTRUCTION GROUP, LLC 0.46% $23,862.38
BREDA COMPANY, INC. 0.15% $7,781.21
CALAME CONTRACTING, LLC 0.10% $5,187.47
Total: 33.84% $1,755,440.82

Bid Items & Bid Tabulations

61 Total 0 of 61
TRAVIS  |  FM 734  |  AUSTIN  |  3417-03-027  |  05/05/2023  |  $6,609,086.09  |  C 3417-3-27  |  INSTL ADVANCED TRAF MGT SYSTEM  |  372 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, INC.
SICE, INC.
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
FURNISHING AND PLACING TOPSOIL (4")
SY 7,716.000 $1.550 $4.750 $9.988 $7.000
BLOCK SODDING
SY 1,404.000 $3.630 $12.000 $24.970 $11.000
BROADCAST SEED (PERM) (URBAN) (CLAY)
SY 6,312.000 $0.310 $0.450 $3.559 $4.000
BROADCAST SEED (TEMP)(WARM OR COOL)
SY 6,312.000 $0.190 $0.400 $0.750 $2.000
VEGETATIVE WATERING
MG 237.200 $6.140 $34.000 $367.584 $65.000
DRILL SHAFT (48 IN)
LF 300.000 $471.380 $500.000 $787.796 $600.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 87.000 $695.600 $610.000 $949.324 $800.000
RIPRAP (CONC)(4 IN)
CY 18.750 $430.530 $860.000 $1,221.280 $1,200.000
MOBILIZATION
LS 1.000 $620,666.180 $492,523.600 $553,955.569 $680,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $26,352.190 $19,400.000 $10,456.183 $24,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 36,413.000 $6.230 $3.550 $3.871 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 36,413.000 $2.320 $1.200 $1.124 $1.000
REMOVE AND RELAY PAVERS
SY 42.000 $181.030 $260.000 $465.067 $200.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,843.000 $27.320 $29.000 $30.464 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,092.190 $2,320.000 $2,444.562 $2,600.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,322.810 $2,000.000 $2,072.510 $1,900.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,611.780 $3,510.000 $3,690.565 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $254.310 $420.000 $436.975 $531.000
CONDT (PVC) (SCH 40) (2")
LF 2,638.000 $27.730 $9.750 $14.819 $30.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,085.000 $20.030 $25.000 $31.314 $35.000
CONDT (PVC) (SCH 40) (3")
LF 32,577.000 $16.940 $14.000 $20.802 $25.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 9,350.000 $46.220 $22.000 $29.913 $43.000
ELEC CONDR (NO.14) INSULATED
LF 44,931.000 $1.140 $1.000 $0.502 $1.500
ELEC CONDR (NO.8) BARE
LF 700.000 $1.370 $1.200 $1.428 $1.950
ELEC CONDR (NO.8) INSULATED
LF 1,419.000 $1.650 $1.200 $1.291 $2.000
ELEC CONDR (NO.6) BARE
LF 222.000 $1.640 $1.550 $1.870 $2.200
ELEC CONDR (NO.6) INSULATED
LF 444.000 $2.020 $1.550 $1.519 $84.000
ELEC CONDR (NO.4) BARE
LF 1,242.000 $2.630 $1.950 $1.855 $2.900
ELEC CONDR (NO.4) INSULATED
LF 3,502.000 $2.920 $2.400 $2.159 $3.300
ELEC CONDR (NO.2) BARE
LF 1,224.000 $3.920 $3.450 $2.464 $4.850
ELEC CONDR (NO.2) INSULATED
LF 2,448.000 $4.450 $3.100 $3.313 $4.600
ELEC CONDR (NO.1/0) BARE
LF 848.000 $5.620 $4.450 $4.212 $5.900
ELEC CONDR (NO.1/0) INSULATED
LF 1,696.000 $6.170 $5.000 $4.565 $6.000
GROUND BOX TY D (162922)W/APRON
EA 17.000 $2,328.070 $1,500.000 $1,801.140 $2,800.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 17.000 $5,822.200 $6,000.000 $6,923.301 $4,800.000
INS OH SN SUP(35 FT CANT)
EA 3.000 $51,307.080 $50,500.000 $61,418.631 $43,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 65.000 $52.890 $38.000 $39.952 $40.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $4,500.000 $7,590.469 $1,900.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 116,325.000 $1.860 $2.210 $1.634 $2.000
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 1,428.000 $3.260 $4.300 $5.668 $3.000
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 52,478.000 $5.550 $4.300 $3.224 $5.000
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 42.000 $2,200.000 $750.000 $530.613 $2,900.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 8.000 $3,080.100 $840.000 $749.100 $3,800.000
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 2.000 $4,289.690 $1,900.000 $4,335.327 $11,000.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 5.000 $2,699.470 $1,200.000 $967.588 $2,000.000
FIBER OPTIC FUSION SPLICE
EA 372.000 $69.280 $30.000 $33.992 $115.000
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 4.000 $16,852.340 $15,800.000 $15,634.368 $12,000.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 15.000 $9,500.530 $7,900.000 $8,794.960 $7,000.000
ITS MULTI-DUCT CND (PVC-40)
LF 32,760.000 $29.190 $21.000 $27.372 $34.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 9,024.000 $72.990 $32.000 $38.442 $42.000
CONDUIT (PREPARE)
LF 1,263.000 $1.620 $4.700 $2.618 $4.000
GROUND BOX (PREPARE)
EA 4.000 $471.040 $350.000 $1,061.225 $854.000
INSTALL DMS (POLE MTD CABINET)
EA 3.000 $15,562.200 $8,000.000 $14,305.934 $15,000.000
ITS POLE (60 FT)(90 MPH)
EA 15.000 $29,918.140 $25,500.000 $27,801.511 $22,000.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 3.000 $5,770.000 $4,300.000 $4,262.820 $13,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 13.000 $10,711.120 $4,300.000 $4,312.760 $15,000.000
ETHERNET SWITCH (INSTALL ONLY)
EA 20.000 $82.010 $310.000 $141.519 $1,000.000
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
EA 15.000 $100.000 $280.000 $141.519 $1,000.000
TMA (STATIONARY)
DAY 260.000 $160.000 $210.000 $424.932 $283.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 58.000 $5,877.190 $5,700.000 $8,070.410 $7,200.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 10.000 $1,300.000 $830.000 $2,871.555 $1,500.000
Totals: $6,609,086.086 $4,925,236.000 $5,983,308.727 $6,850,004.700