Show Job Controls
Bid Cobra

TRAVIS FM 3177 (3277-01-025)

Items: 122

County: TRAVIS
Length: N/A
Highway: FM 3177
District: AUSTIN
Control Number: 3277-01-025
DBE Goal: N/A
Project: STP 2023(990)HES
Guaranty: N/A
Time: 104 WORKING DAYS
Engineer's Estimate: $2,190,703.77
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,190,703.77
$2,361,951.00
Over/Under Est: 7.82% $171,247.23
$2,480,387.52
Over/Under Est: 13.22% $289,683.75
Amt Left: 5.01% $118,436.52
Over/Under Est: 22.74% $498,159.51
Amt Left: 13.84% $326,912.28
Delta: -8.40% -$208,475.76
Over/Under Est: 29.97% $656,657.48
Amt Left: 20.55% $485,410.25
Delta: -5.89% -$158,497.97
Subcontractor Percentage Amount
G. CARTER CONSTRUCTION COMPANY, INC. 14.02% $341,469.31
ENVIRONMENTAL SAFETY SERVICES, INC. 6.08% $148,083.69
SIX SITE SERVICES, LLC 1.92% $46,763.27
AARON CONCRETE CONTRACTORS, LLC 0.27% $6,576.09
FLASHER EQUIPMENT COMPANY 0.00% $0.00
D. I. J. CONSTRUCTION, INC. 0.00% $0.00
LONE STAR PAVING COMPANY 0.00% $0.00
Total: 22.29% $542,892.36

Bid Items & Bid Tabulations

122 Total 0 of 122
TRAVIS  |  FM 3177  |  AUSTIN  |  3277-01-025  |  06/27/2023  |  $2,190,703.77  |  STP 2023(990)HES  |  WIDEN ROAD - ADD LANES  |  104 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR SITEWORK, LLC
DAN WILLIAMS COMPANY
CAPITAL EXCAVATION COMPANY
AARON CONCRETE CONTRACTORS, LLC
PREPARING ROW
STA 40.000 $2,250.000 $350.000 $1,700.000 $490.000 $2,600.000
REMOVING CONC (RIPRAP)
SY 282.000 $12.500 $7.500 $20.000 $21.000 $40.000
REMOVING CONC (DRIVEWAYS)
SY 1,409.000 $18.520 $8.600 $17.000 $17.000 $34.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 336.000 $20.000 $8.000 $16.000 $29.900 $40.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 3,321.000 $15.000 $12.700 $8.000 $16.050 $10.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 3,550.000 $20.000 $17.500 $20.000 $24.200 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,435.000 $15.000 $29.500 $30.000 $67.700 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 13,680.000 $1.300 $4.000 $1.750 $3.150 $2.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 13,680.000 $0.300 $0.900 $0.350 $0.450 $0.500
VEGETATIVE WATERING
MG 231.000 $16.000 $95.000 $10.000 $43.850 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 5,472.000 $1.400 $2.300 $1.500 $1.900 $2.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 8,208.000 $2.500 $13.500 $5.750 $7.250 $7.500
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 2,194.000 $62.000 $70.000 $85.000 $85.000 $120.000
PRIME COAT (MULTI OPTION)
GAL 1,596.000 $4.100 $4.100 $3.750 $5.650 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,978.000 $35.000 $52.500 $51.000 $83.750 $75.000
PLANE ASPH CONC PAV (1")
SY 19,771.000 $1.600 $2.000 $2.100 $2.240 $2.400
FLOWABLE BACKFILL (OPTION 1)
CY 60.000 $180.000 $110.000 $250.000 $250.000 $243.000
DRILL SHAFT (36 IN)
LF 39.600 $300.000 $472.000 $600.000 $430.000 $490.000
DRILL SHAFT (48 IN)
LF 22.000 $350.000 $587.000 $700.000 $510.000 $590.000
CL C CONC (FOOTING)
CY 6.000 $900.000 $675.000 $1,500.000 $950.000 $2,900.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $550.000 $785.000 $850.000 $1,040.000 $1,100.000
RAIL (HANDRAIL)(TY A)
LF 93.000 $160.000 $112.000 $110.000 $115.000 $116.000
RC PIPE (CL III)(24 IN)
LF 535.000 $95.000 $145.000 $125.000 $128.000 $170.000
SET (TY I) (24 IN) (6: 1) (C)
EA 18.000 $2,200.000 $3,600.000 $2,000.000 $3,000.000 $3,300.000
REMOV STR (SET)
EA 16.000 $350.000 $250.000 $300.000 $890.000 $885.000
REMOV STR (PIPE)
LF 461.000 $20.000 $15.000 $20.000 $28.950 $77.000
REMOV STR (SLOTTED DRAIN INLET)
LF 60.000 $15.000 $20.000 $30.000 $39.250 $74.000
MOBILIZATION
LS 1.000 $173,095.700 $97,050.000 $245,000.000 $240,000.000 $280,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,600.000 $1,840.000 $17,000.000 $3,890.000 $7,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $35.000 $72.000 $35.000 $98.400 $46.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 30.000 $41.000 $100.000 $113.000 $98.400 $150.000
ROCK FILTER DAMS (REMOVE)
CY 30.000 $20.000 $60.000 $28.000 $57.900 $37.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,605.000 $3.500 $4.200 $4.000 $4.050 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,605.000 $0.680 $0.600 $1.000 $0.600 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 20.000 $5.000 $12.000 $5.000 $11.600 $6.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $1.550 $9.000 $2.000 $8.700 $2.500
CONC CURB (TY F2)
LF 50.000 $160.000 $350.000 $185.000 $370.000 $485.000
DRIVEWAYS (CONC)
SY 955.000 $100.000 $112.000 $105.000 $167.000 $130.000
DRIVEWAYS (ACP)
SY 918.000 $55.000 $100.000 $70.000 $109.000 $78.000
CONC SIDEWALKS (5")
SY 189.000 $70.000 $99.000 $92.000 $107.000 $138.000
CURB RAMPS (TY 2)
EA 1.000 $2,000.000 $2,450.000 $1,750.000 $2,510.000 $2,630.000
CURB RAMPS (TY 7)
EA 5.000 $1,750.000 $2,175.000 $1,650.000 $3,000.000 $2,460.000
MTL W-BEAM GD FEN (TIM POST)
LF 725.000 $25.000 $29.000 $33.000 $24.300 $31.000
REMOVE METAL BEAM GUARD FENCE
LF 935.000 $3.450 $8.600 $5.000 $2.250 $9.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $335.000 $622.000 $125.000 $280.000 $640.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $210.000 $347.000 $250.000 $280.000 $360.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $3,900.000 $4,000.000 $3,330.000 $4,000.000
CONDT (PVC) (SCH 40) (2")
LF 85.000 $40.000 $23.000 $16.000 $22.800 $26.000
CONDT (PVC) (SCH 40) (3")
LF 158.000 $18.000 $27.500 $35.000 $28.500 $33.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 982.000 $43.000 $55.100 $28.000 $51.300 $59.000
ELEC CONDR (NO.8) BARE
LF 1,034.500 $1.600 $1.700 $1.800 $1.500 $1.700
ELEC CONDR (NO.8) INSULATED
LF 1,506.000 $2.500 $1.900 $1.800 $1.600 $1.800
ELEC CONDR (NO.6) BARE
LF 195.500 $2.500 $2.200 $2.150 $2.300 $2.600
ELEC CONDR (NO.6) INSULATED
LF 391.000 $2.140 $2.400 $2.150 $3.400 $4.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $2,000.000 $2,100.000 $2,500.000 $1,820.000 $2,100.000
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 1.000 $7,700.000 $7,910.000 $11,500.000 $7,100.000 $8,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $650.000 $657.000 $800.000 $620.000 $775.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $800.000 $1,020.000 $1,000.000 $970.000 $942.000
REMOVE SM RD SN SUP&AM
EA 19.000 $100.000 $150.000 $100.000 $141.000 $136.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 400.000 $3.250 $3.300 $2.000 $3.100 $2.400
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 600.000 $3.470 $3.300 $2.000 $3.100 $2.400
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,900.000 $0.700 $1.200 $3.000 $1.100 $3.600
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 7,400.000 $1.040 $1.200 $0.500 $1.100 $0.600
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,400.000 $0.700 $1.200 $0.660 $1.100 $0.800
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 400.000 $1.090 $1.000 $2.500 $2.250 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 600.000 $1.090 $1.000 $2.500 $2.250 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 820.000 $1.000 $1.800 $2.050 $1.750 $2.500
REFL PAV MRK TY II (W) 6" (BRK)
LF 1,980.000 $0.250 $0.800 $0.350 $0.750 $0.400
REFL PAV MRK TY II (W) 6" (SLD)
LF 7,840.000 $0.210 $0.800 $0.330 $0.750 $0.400
REFL PAV MRK TY II (W) 8" (SLD)
LF 820.000 $0.500 $0.900 $0.850 $0.850 $1.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 260.000 $3.000 $4.700 $9.000 $4.450 $11.000
REFL PAV MRK TY II (W) (ARROW)
EA 4.000 $55.000 $78.000 $160.000 $73.400 $190.000
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $70.000 $100.000 $190.000 $96.000 $225.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 1,730.000 $0.200 $0.800 $0.350 $0.750 $0.400
REFL PAV MRK TY II (Y) 6" (SLD)
LF 6,790.000 $0.230 $0.800 $0.330 $0.750 $0.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,980.000 $0.600 $1.000 $0.880 $0.900 $1.050
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 7,840.000 $1.000 $1.000 $0.760 $0.900 $0.900
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,730.000 $0.650 $1.000 $0.880 $0.900 $1.050
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 6,790.000 $0.750 $1.000 $0.760 $0.900 $0.900
REFL PAV MRKR TY I-C
EA 138.000 $4.200 $7.100 $9.150 $6.700 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,500.000 $0.550 $0.900 $0.900 $0.850 $1.100
ELIM EXT PAV MRK & MRKS (6")
LF 150.000 $0.550 $1.000 $1.200 $0.950 $1.500
ELIM EXT PAV MRK & MRKS (12")
LF 100.000 $1.500 $1.800 $2.350 $1.700 $2.800
ELIM EXT PAV MRK & MRKS (24")
LF 120.000 $3.600 $2.900 $4.750 $2.750 $5.650
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $60.000 $60.000 $90.000 $56.500 $107.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $90.000 $78.000 $105.000 $73.400 $125.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $15,000.000 $19,520.000 $20,000.000 $5,100.000 $5,900.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $10,000.000 $4,310.000 $9,000.000 $3,420.000 $3,900.000
TEMP TRAF SIGNALS
EA 1.000 $30,000.000 $43,530.000 $20,000.000 $5,700.000 $6,530.000
VEH SIG SEC (12")LED(GRN)
EA 8.000 $320.000 $374.000 $370.000 $460.000 $520.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $370.000 $374.000 $370.000 $460.000 $520.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $390.000 $374.000 $370.000 $510.000 $590.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $373.000 $374.000 $370.000 $460.000 $520.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $360.000 $374.000 $370.000 $460.000 $520.000
VEH SIG SEC (12")LED(RED ARW)
EA 2.000 $340.000 $374.000 $370.000 $460.000 $520.000
PED SIG SEC (LED)(COUNTDOWN)
EA 6.000 $800.000 $1,138.000 $910.000 $800.000 $915.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 2.000 $160.000 $200.000 $190.000 $200.000 $230.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 8.000 $150.000 $190.000 $165.000 $171.000 $195.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,706.500 $3.250 $2.200 $2.200 $1.150 $1.300
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 549.000 $3.600 $2.400 $2.600 $2.300 $2.600
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 862.500 $2.730 $1.900 $2.000 $1.150 $1.300
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $10,000.000 $9,073.000 $11,000.000 $6,300.000 $7,200.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $600.000 $575.000 $350.000 $570.000 $650.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $17,000.000 $10,960.000 $19,000.000 $19,400.000 $22,200.000
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 2.000 $18,000.000 $18,250.000 $20,000.000 $21,100.000 $24,100.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $40,000.000 $42,550.000 $42,000.000 $41,100.000 $47,000.000
PED POLE ASSEMBLY
EA 1.000 $2,750.000 $2,730.000 $5,000.000 $3,990.000 $4,600.000
PED DETECT PUSH BUTTON (APS)
EA 6.000 $1,600.000 $1,250.000 $940.000 $630.000 $725.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,000.000 $3,390.000 $3,500.000 $2,850.000 $3,265.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 1,757.000 $121.000 $108.000 $120.000 $132.000 $105.000
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 108.000 $135.000 $159.000 $160.000 $221.000 $145.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 880.000 $140.000 $150.000 $160.000 $153.000 $145.000
TOM-C PG76-22 SAC-B
TON 1,063.000 $145.000 $170.000 $180.000 $187.000 $165.000
BONDING COURSE
GAL 584.000 $4.000 $4.200 $3.850 $9.500 $9.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $6,762.540 $22,680.000 $15,000.000 $11,300.000 $10,000.000
ITS COM CBL (ETHERNET)
LF 75.000 $9.000 $4.600 $1.650 $3.400 $4.000
TMA (STATIONARY)
DAY 2.000 $175.580 $1,000.000 $400.000 $183.000 $530.000
TMA (MOBILE OPERATION)
HR 75.000 $60.000 $350.000 $65.000 $11.350 $100.000
RVDS(ADVANCE DETECTION ONLY)
EA 2.000 $11,500.000 $7,000.000 $7,600.000 $6,500.000 $7,500.000
RVDS(PRESENCE AND ADVANCE DET)
EA 4.000 $17,000.000 $7,180.000 $8,000.000 $6,500.000 $7,500.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 30.000 $1,500.000 $750.000 $400.000 $720.000 $800.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 5.000 $1,700.000 $1,500.000 $500.000 $1,440.000 $1,800.000
Totals: $2,190,703.770 $2,361,951.000 $2,480,387.525 $2,688,863.290 $2,847,361.250