Show Job Controls
Bid Cobra

TRAVIS SL 1 (3136-01-200)

Items: 44

County: TRAVIS
Length: N/A
Highway: SL 1
District: AUSTIN
Control Number: 3136-01-200
DBE Goal: N/A
Project: F 2024(152)
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $3,915,005.30
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: DRAINAGE IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$3,915,005.30
$4,337,214.75
Over/Under Est: 10.78% $422,209.45
Over/Under Est: 25.02% $979,357.10
Amt Left: 12.85% $557,147.65
Over/Under Est: 63.67% $2,492,737.50
Amt Left: 47.74% $2,070,528.05
Delta: -30.92% -$1,513,380.40
$6,740,623.00
Over/Under Est: 72.17% $2,825,617.70
Amt Left: 55.41% $2,403,408.25
Delta: -5.19% -$332,880.20
Over/Under Est: 81% $3,171,116.50
Amt Left: 63.38% $2,748,907.05
Delta: -5.13% -$345,498.80
Subcontractor Percentage Amount
VORTEX LINING SYSTEMS, LLC 31.79% $1,378,800.57
ENVIRONMENTAL SAFETY SERVICES, INC. 0.94% $40,769.82
AUSTIN WOOD RECYCLING 0.65% $28,191.90
TEXAS TRAFFIC AND BARRICADE, LLC 0.18% $7,806.99
MG DRILLING, LLC 0.09% $3,903.49
M.G. DRILLING 0.09% $3,903.49
STRIPE IT UP, LLC 0.08% $3,469.77
ENVIRONMENTAL SUPPORT SERVICES, INC. 0.00% $0.00
Total: 33.82% $1,466,846.03

Bid Items & Bid Tabulations

44 Total 0 of 44
TRAVIS  |  SL 1  |  AUSTIN  |  3136-01-200  |  10/05/2023  |  $3,915,005.30  |  F 2024(152)  |  DRAINAGE IMPRVS  |  96 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN UNDERGROUND INCORPORATED
AARON CONCRETE CONTRACTORS, LLC
CAPITAL EXCAVATION COMPANY
FNH CONSTRUCTION, LLC
JORDAN FOSTER CONSTRUCTION, LLC
PREPARING ROW
STA 4.000 $4,000.000 $50,000.000 $12,000.000 $19,000.000 $95,000.000 $145,000.000
EXCAVATION (ROADWAY)
CY 100.000 $60.000 $150.000 $120.000 $108.000 $25.000 $65.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 100.000 $60.000 $77.000 $65.000 $121.000 $80.000 $180.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,400.000 $2.000 $13.000 $8.000 $9.750 $8.000 $20.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 2,400.000 $1.000 $0.400 $0.350 $0.400 $1.000 $3.000
VEGETATIVE WATERING
MG 37.000 $20.000 $42.000 $35.000 $76.200 $50.000 $85.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,400.000 $3.000 $2.000 $1.500 $1.950 $10.500 $2.350
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
SY 133.000 $100.000 $220.000 $480.000 $370.000 $200.000 $390.000
FLOWABLE BACKFILL
CY 736.000 $250.000 $225.000 $615.000 $320.000 $350.000 $265.000
TRENCH EXCAVATION PROTECTION
LF 296.000 $25.000 $8.500 $22.000 $35.050 $10.000 $13.000
PNEUMATICALLY PLACED CON-66"PIPE LINER
SF 2,868.000 $144.700 $120.000 $125.000 $165.000 $0.000 $160.000
PNEUMATICALLY PLACED CON-96"PIPE LINER
SF 15,155.000 $139.230 $141.000 $125.000 $165.000 $0.000 $185.000
RIPRAP CONC (8 IN)
CY 14.000 $325.000 $1,300.000 $1,400.000 $1,370.000 $1,000.000 $1,200.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 20.000 $350.000 $390.000 $1,000.000 $550.000 $300.000 $800.000
RC PIPE (CL III)(24 IN)
LF 158.500 $125.000 $140.000 $124.000 $162.000 $150.000 $300.000
RC PIPE (CL III)(30 IN)
LF 20.000 $160.000 $280.000 $218.000 $350.000 $180.000 $400.000
RC PIPE (CL III)(36 IN)
LF 83.000 $200.000 $260.000 $185.000 $270.000 $250.000 $350.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 2.000 $5,000.000 $6,300.000 $4,500.000 $6,500.000 $16,500.000 $12,000.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 3.000 $6,500.000 $8,800.000 $5,400.000 $8,100.000 $18,500.000 $14,000.000
JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV)
LF 104.500 $1,100.000 $1,200.000 $995.000 $3,010.000 $3,000.000 $2,600.000
JACK BOR OR TUN PIPE(96")TUNNEL LINING
LF 80.000 $3,505.680 $4,400.000 $5,500.000 $16,000.000 $0.000 $16,050.000
CLEAN EXIST CULVERTS
CY 30.000 $200.000 $390.000 $20,000.000 $650.000 $1,500.000 $1,200.000
MOBILIZATION
LS 1.000 $345,746.800 $380,000.000 $465,000.000 $540,000.000 $750,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $25,000.000 $5,500.000 $50,000.000 $8,500.000 $23,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 30.000 $70.000 $140.000 $102.000 $134.000 $30.000 $125.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $15.000 $35.000 $32.000 $66.800 $15.000 $62.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $25.000 $68.000 $50.000 $23.400 $50.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $12.000 $20.000 $18.000 $16.700 $20.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,189.000 $6.000 $6.000 $4.500 $4.700 $4.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,189.000 $2.000 $0.750 $0.600 $0.650 $2.000 $0.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 40.000 $8.000 $7.000 $5.000 $8.700 $18.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 40.000 $3.000 $2.500 $2.500 $1.350 $9.000 $1.300
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 1,750.000 $75.000 $31.000 $52.000 $99.900 $100.000 $34.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,750.000 $20.000 $24.000 $26.000 $24.200 $30.000 $32.000
CONC CURB & GUTTER (TY II)
LF 100.000 $40.000 $32.000 $65.000 $58.100 $55.000 $50.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $1,200.000 $1,600.000 $12,400.000 $3,000.000 $1,400.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $11,000.000 $15,000.000 $710.000 $30,000.000 $15,000.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 119.000 $7.000 $50.000 $34.000 $20.850 $6.000 $42.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 100.000 $4.000 $11.000 $8.000 $13.050 $6.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $15,000.000 $3,600.000 $26,100.000 $16,500.000 $18,000.000
TMA (STATIONARY)
DAY 20.000 $500.000 $290.000 $250.000 $560.000 $250.000 $650.000
CASING (STEEL)(18")(BORE)
LF 32.000 $500.000 $940.000 $670.000 $1,960.000 $500.000 $800.000
1
JACK BOR OR TUN PIPE(48")TUNNEL LINING
LF 166.000 $2,500.000 $0.000 $0.000 $0.000 $5,000.000 $0.000
1
JACK BOR OR TUN PIPE(78")TUNNEL LINING
LF 683.000 $3,500.000 $0.000 $0.000 $0.000 $5,000.000 $0.000
Totals: $6,720,489.950 $4,337,214.750 $4,894,362.400 $6,407,742.800 $6,740,623.000 $7,086,121.800