TRAVIS VARIOUS (0914-00-515)

Items: 29

County: TRAVIS
Length: 0.0000 MILES
Highway: VARIOUS
District: AUSTIN
Control Number: 0914-00-515
DBE Goal: 0.0%
Project: F 2025(757)
Guaranty: $20,000.00
Time: 89 WORKING DAYS
Engineer's Estimate: $995,885.85
Date: 06/04/2025 (1 year ago)
Contract Number: 6253028
Type: INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM
Project ID: A00197321
Contract Type: Federal
Project Description: ITS UPGRADES AND REPAIRS ALONG US 290 FROM IH 35 TO LP 1
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRENDA GUERRA
MAHENDRAN THIVAKARAN
YETNAYET BOGALE
KEVIN PLUMLEE
DOUGLAS L TURNER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$995,885.85
$619,888.00
Over/Under Est: -37.76% -$375,997.85
$843,827.57
Over/Under Est: -15.27% -$152,058.28
Amt Left: 36.13% $223,939.57
Over/Under Est: -13.9% -$138,455.35
Amt Left: 38.32% $237,542.50
Delta: -1.61% -$13,602.93
Over/Under Est: 4.21% $41,881.55
Amt Left: 67.41% $417,879.40
Delta: -21.03% -$180,336.90
Over/Under Est: 5.59% $55,714.15
Amt Left: 69.64% $431,712.00
Delta: -1.33% -$13,832.60
Over/Under Est: 24.43% $243,314.15
Amt Left: 99.91% $619,312.00
Delta: -17.84% -$187,600.00
$1,331,873.33
Over/Under Est: 33.74% $335,987.48
Amt Left: 114.86% $711,985.33
Delta: -7.48% -$92,673.33
Subcontractor Percentage Amount
DALLAS LITE AND BARRICADE, INC. 3.47% $24,988.55
Total: 3.47% $24,988.55

Bid Items & Bid Tabulations

29 Total 0 of 29
TRAVIS  |  VARIOUS  |  AUSTIN  |  0914-00-515  |  06/04/2025  |  $995,885.85  |  F 2025(757)  |  INSTL ADVANCED TRAF MGT SYSTEM  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELECNOR BELCO ELECTRIC, INC.
SICE, INC.
LIGHT IT UP ELECTRIC
LUMIN8 TRANSPORTATION TECHNOLOGIES, LLC
FLORIDA TRAFFIC CONTROL DEVICES, INC.
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
THE LEVY COMPANY, LLC
MOBILIZATION
LS 1.000 $50,000.000 $23,438.000 $82,860.626 $72,000.000 $5,944.000 $105,000.000 $90,000.000 $133,187.330
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $3,500.000 $11,219.481 $13,000.000 $3,943.000 $7,100.000 $15,000.000 $16,300.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $149.570 $195.000 $1,554.108 $200.000 $907.000 $170.000 $800.000 $140.000
TMA (STATIONARY)
DAY 5.000 $280.000 $300.000 $1,918.861 $500.000 $1,152.000 $170.000 $500.000 $280.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $8.000 $11.000 $7.023 $7.000 $41.000 $29.600 $11.000 $5.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $3.000 $5.000 $2.159 $2.000 $18.000 $7.400 $5.000 $2.200
CONDT (PVC) (SCH 80) (2")
LF 200.000 $25.000 $28.000 $52.336 $35.000 $30.000 $18.900 $45.000 $41.000
CONDT (PVC) (SCH 80) (3")
LF 600.000 $29.000 $34.000 $56.531 $38.000 $32.000 $25.400 $55.000 $64.000
ELEC CONDR (NO.6) BARE
LF 865.000 $2.800 $3.000 $1.817 $3.000 $3.600 $2.100 $4.000 $2.600
ELEC CONDR (NO.6) INSULATED
LF 1,730.000 $3.100 $3.000 $1.377 $3.350 $4.000 $2.650 $5.000 $2.850
GROUND BOX TY D (162922)
EA 1.000 $1,500.000 $1,500.000 $3,680.931 $1,350.000 $1,342.000 $809.500 $4,000.000 $2,300.000
REMOVAL OF CABLES
LF 2,820.000 $1.900 $1.000 $0.790 $2.500 $2.000 $1.200 $2.000 $0.650
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 6.000 $750.000 $1,000.000 $10,086.788 $1,500.000 $2,828.000 $1,163.000 $2,000.000 $1,100.000
REPLACE UNDERGROUND CONDUIT
LF 1,500.000 $27.000 $6.800 $27.704 $35.000 $51.000 $18.800 $100.000 $36.000
SYSTEM INTEGRATION
LS 1.000 $50,000.000 $10,000.000 $50,799.864 $33,000.000 $30,790.000 $19,500.000 $15,000.000 $14,000.000
GROUND BOX (PREPARE)
EA 3.000 $750.000 $230.000 $612.706 $500.000 $2,910.000 $1,650.000 $1,500.000 $510.000
GROUND BOX (ADJUST)
EA 1.000 $750.000 $455.000 $3,797.883 $2,000.000 $5,760.000 $500.000 $1,000.000 $2,800.000
COVER (REPLACE)
EA 31.000 $700.000 $350.000 $257.896 $800.000 $6,681.000 $410.000 $6,500.000 $12,100.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 12.000 $7,500.000 $9,800.000 $7,878.308 $8,500.000 $12,905.000 $9,410.000 $8,000.000 $10,500.000
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 7,670.000 $4.300 $2.500 $3.996 $2.000 $2.620 $6.750 $5.000 $3.550
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 17.000 $1,397.000 $1,400.000 $1,032.289 $2,000.000 $1,664.000 $2,460.000 $2,500.000 $1,400.000
FIBER OPTIC PATCH PANEL (36 POSITIONS)
EA 5.000 $2,873.000 $3,300.000 $3,000.485 $2,700.000 $3,707.000 $7,830.000 $3,500.000 $5,200.000
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 13.000 $7,000.000 $8,100.000 $7,362.857 $3,500.000 $11,655.000 $24,010.000 $8,000.000 $12,000.000
WIRELESS WWD SYSTEM
EA 1.000 $30,000.000 $60,000.000 $74,070.431 $50,000.000 $80,445.000 $65,815.000 $84,000.000 $61,600.000
WWD LED SIGN
EA 2.000 $10,000.000 $11,000.000 $3,707.047 $9,900.000 $10,294.000 $11,985.000 $6,000.000 $15,600.000
PREVENTIVE MAINTENANCE
EA 5.000 $2,000.000 $2,500.000 $1,184.023 $1,500.000 $3,853.000 $2,910.000 $9,000.000 $6,500.000
ETHERNET SWITCH (INSTALL ONLY)
EA 24.000 $1,000.000 $1,300.000 $180.264 $400.000 $770.000 $1,040.000 $1,000.000 $430.000
REMOVE AND REPLACE DMS
EA 6.000 $70,000.000 $14,000.000 $15,817.465 $38,000.000 $13,244.000 $17,310.000 $21,000.000 $14,000.000
REMOVE EXISTING LANE CONTROL SYSTEM
EA 2.000 $2,900.000 $1,500.000 $7,258.953 $4,200.000 $6,180.000 $2,600.000 $7,000.000 $3,700.000
Totals: $995,885.850 $619,888.000 $843,827.539 $857,430.500 $1,037,767.400 $1,051,600.000 $1,239,200.000 $1,331,873.330
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $4,000.00