Bid Cobra

TRAVIS SL 275 (0016-01-133)

Items: 127

County: TRAVIS
Length: N/A
Highway: SL 275
District: AUSTIN
Control Number: 0016-01-133
DBE Goal: N/A
Project: STP 2022(640)HES
Guaranty: N/A
Time: 118 WORKING DAYS
Engineer's Estimate: $969,752.83
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: INSTALL TRAFFIC SIGNAL
Mail/Deliver Bids To: N/A
TOMMY ABREGO
MARK BAUMANN
SHANE SWIMM
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$969,752.83
$1,318,917.45
Over/Under Est: 36.01% $349,164.62
$1,583,008.87
Over/Under Est: 63.24% $613,256.04
Amt Left: 20.02% $264,091.42
Over/Under Est: 116.65% $1,131,174.07
Amt Left: 59.29% $782,009.45
Delta: -32.72% -$517,918.03

Bid Items & Bid Tabulations

127 Total 0 of 127
TRAVIS  |  SL 275  |  AUSTIN  |  0016-01-133  |  06/30/2022  |  $969,752.83  |  STP 2022(640)HES  |  INSTL TRAF SIGNAL  |  118 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONE STAR SITEWORK, LLC
DAN WILLIAMS COMPANY
AARON CONCRETE CONTRACTORS, L.P.
PREPARING ROW
STA 10.500 $5,837.000 $490.000 $13,500.000 $5,000.000
REMOVING CONC (SIDEWALKS)
SY 221.000 $12.030 $16.000 $18.000 $75.000
REMOVING CONC (DRIVEWAYS)
SY 76.000 $16.720 $22.000 $17.000 $110.000
REMOVING CONC (CURB AND GUTTER)
LF 210.000 $5.830 $7.600 $8.000 $22.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 562.000 $10.280 $7.100 $6.000 $18.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 52.000 $15.410 $13.100 $15.000 $80.000
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 261.000 $2.280 $30.400 $15.500 $110.000
EXCAVATION (ROADWAY)
CY 1,040.000 $8.160 $26.000 $45.000 $70.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 174.000 $8.790 $47.000 $45.000 $85.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,979.000 $1.010 $9.900 $3.500 $15.000
BLOCK SODDING
SY 1,979.000 $3.220 $9.400 $7.500 $10.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 340.000 $47.540 $120.000 $70.000 $175.000
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
SY 261.000 $12.000 $47.000 $16.000 $115.000
PRIME COAT (MULTI OPTION)
GAL 216.000 $3.910 $1.100 $18.000 $20.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 32.000 $198.710 $930.000 $1,000.000 $105.000
DRILL SHAFT (TRF SIG POLE) (42 IN)
LF 16.000 $355.000 $880.000 $1,000.000 $780.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 83.000 $412.750 $1,130.000 $1,250.000 $810.000
RIPRAP CONC (8 IN)
CY 38.000 $535.960 $647.000 $700.000 $915.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 1.000 $5,446.870 $4,800.000 $7,000.000 $11,000.000
REMOV STR (INLET)
EA 1.000 $570.230 $1,700.000 $750.000 $5,000.000
REMOV STR (PIPE)
LF 10.000 $18.100 $20.000 $55.000 $500.000
MOBILIZATION
LS 1.000 $79,018.170 $36,000.000 $155,000.000 $180,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,987.770 $1,950.000 $23,000.000 $6,000.000
CONSTRUCTION PERIMETER FENCE
LF 1,782.000 $5.470 $3.100 $2.500 $3.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,709.000 $2.510 $4.700 $3.750 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,709.000 $0.600 $1.250 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 70.000 $3.790 $5.000 $4.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 70.000 $0.970 $1.250 $1.000 $1.500
CONC CURB (TY I)
LF 407.000 $42.680 $20.500 $80.000 $58.000
CONC CURB & GUTTER (TY II)
LF 1,534.000 $21.650 $34.000 $29.000 $57.000
DRIVEWAYS (CONC)
SY 45.000 $75.950 $118.000 $115.000 $240.000
DRIVEWAYS (ACP)
SY 113.000 $38.540 $115.000 $105.000 $205.000
CONC SIDEWALKS (5")
SY 1,183.000 $61.720 $105.000 $70.000 $165.000
CURB RAMPS (TY 2)
EA 4.000 $2,065.690 $2,550.000 $3,000.000 $3,300.000
CURB RAMPS (TY 6)
EA 2.000 $2,134.560 $3,300.000 $3,500.000 $3,350.000
CURB RAMPS (TY 7)
EA 15.000 $1,975.990 $2,450.000 $3,000.000 $3,200.000
CONC DIRECTIONAL ISLAND
SY 8.000 $90.920 $187.000 $175.000 $350.000
CONDT (PVC) (SCH 80) (2")
LF 45.000 $20.000 $74.000 $62.000 $98.000
CONDT (PVC) (SCH 80) (3")
LF 540.000 $18.210 $49.000 $41.000 $104.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 1,260.000 $30.880 $86.000 $72.000 $123.000
CONDT (PVC) (SCH 80) (4")
LF 145.000 $24.360 $96.000 $80.000 $110.000
ELEC CONDR (NO.6) BARE
LF 2,110.000 $1.640 $3.600 $3.000 $2.600
ELEC CONDR (NO.6) INSULATED
LF 100.000 $2.350 $3.600 $3.000 $3.900
TRAY CABLE (3 CONDR) (10 AWG)
LF 635.000 $2.300 $5.000 $4.200 $11.000
GROUND BOX TY D (162922)W/APRON
EA 18.000 $1,087.070 $2,180.000 $1,820.000 $5,200.000
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 2.000 $5,279.710 $8,000.000 $8,000.000 $7,700.000
ALUMINUM SIGNS (TY A)
SF 20.750 $28.550 $50.000 $40.000 $48.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $510.630 $1,141.000 $915.000 $1,080.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $460.190 $1,040.000 $835.000 $990.000
REMOVE SM RD SN SUP&AM
EA 5.000 $91.060 $187.000 $150.000 $180.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $23.320 $31.000 $25.000 $30.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 10.000 $90.160 $106.000 $85.000 $100.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 358.000 $0.710 $4.800 $4.850 $5.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 361.000 $0.740 $4.800 $4.850 $5.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 80.000 $0.850 $7.200 $10.000 $7.800
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 30.000 $3.010 $10.800 $13.000 $11.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 287.000 $6.380 $21.600 $13.000 $24.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 5.000 $127.070 $300.000 $160.000 $325.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $188.700 $330.000 $190.000 $360.000
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 1.000 $167.780 $360.000 $205.000 $390.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 836.000 $0.130 $0.900 $0.750 $1.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,586.000 $0.110 $0.900 $0.750 $1.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 320.000 $2.970 $5.400 $4.000 $6.000
REFL PAV MRK TY II (W) (ARROW)
EA 2.000 $325.000 $210.000 $60.000 $230.000
REFL PAV MRK TY II (W) (WORD)
EA 1.000 $72.100 $210.000 $65.000 $230.000
REFL PAV MRK TY II (W) (BIKE ARROW)
EA 7.000 $46.530 $120.000 $40.000 $130.000
REFL PAV MRK TY II (W) (BIKE SYMBOL)
EA 9.000 $71.680 $120.000 $50.000 $130.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 2,440.000 $0.120 $0.900 $0.750 $1.000
PAVEMENT SEALER 4"
LF 632.000 $0.130 $0.900 $0.750 $1.000
PAVEMENT SEALER 8"
LF 80.000 $0.300 $1.800 $1.500 $2.000
PAVEMENT SEALER 12"
LF 30.000 $0.710 $2.700 $3.000 $3.000
PAVEMENT SEALER 24"
LF 287.000 $1.960 $5.400 $4.000 $6.000
PAVEMENT SEALER (ARROW)
EA 5.000 $30.030 $210.000 $60.000 $230.000
PAVEMENT SEALER (DBL ARROW)
EA 1.000 $54.760 $240.000 $65.000 $260.000
PAVEMENT SEALER (BIKE SYMBOL)
EA 1.000 $23.380 $120.000 $50.000 $130.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 98.000 $0.540 $3.600 $6.100 $4.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 534.000 $0.270 $3.600 $6.100 $4.000
REFL PAV MRKR TY II-A-A
EA 60.000 $3.230 $18.000 $7.000 $20.000
REFL PAV MRKR TY II-C-R
EA 5.000 $3.470 $18.000 $27.000 $20.000
ELIM EXT PAV MRK & MRKS (4")
LF 985.000 $0.350 $1.800 $2.700 $2.000
ELIM EXT PAV MRK & MRKS (8")
LF 120.000 $0.790 $3.600 $5.500 $4.000
ELIM EXT PAV MRK & MRKS (12")
LF 3.000 $1.470 $5.400 $25.500 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 147.000 $3.420 $11.000 $8.000 $12.000
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
EA 5.000 $80.950 $120.000 $100.000 $130.000
PAV SURF PREP FOR MRK (4")
LF 632.000 $0.040 $0.600 $0.010 $0.700
PAV SURF PREP FOR MRK (8")
LF 80.000 $0.130 $1.200 $0.020 $0.020
PAV SURF PREP FOR MRK (12")
LF 30.000 $0.270 $1.800 $0.050 $2.000
PAV SURF PREP FOR MRK (24")
LF 287.000 $0.750 $3.600 $0.100 $4.000
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $16.670 $60.000 $5.000 $66.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $25.130 $72.000 $5.000 $78.000
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 1.000 $11.740 $36.000 $5.000 $40.000
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $25,891.150 $14,600.000 $20,000.000 $8,600.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $252.970 $430.000 $360.000 $390.000
VEH SIG SEC (12")LED(GRN ARW)
EA 8.000 $255.630 $430.000 $360.000 $390.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $250.910 $430.000 $360.000 $390.000
VEH SIG SEC (12")LED(YEL ARW)
EA 15.000 $248.150 $430.000 $360.000 $390.000
VEH SIG SEC (12")LED(RED)
EA 13.000 $246.830 $430.000 $360.000 $390.000
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $239.770 $430.000 $360.000 $390.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $605.130 $1,150.000 $960.000 $780.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 7.000 $128.490 $240.000 $200.000 $210.000
BACKPLATE W/REFL BRDR(5 SEC)
EA 1.000 $136.590 $260.000 $220.000 $220.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 11.000 $112.740 $200.000 $170.000 $200.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,585.000 $1.710 $2.900 $2.450 $2.600
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 883.000 $2.090 $3.400 $2.800 $3.900
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 422.000 $2.500 $3.900 $3.250 $5.200
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 850.000 $5.770 $8.700 $7.250 $9.100
INS TRF SIG PL AM (MAST)(INSTALL ONLY)
EA 6.000 $2,247.480 $2,280.000 $1,900.000 $3,100.000
PED POLE ASSEMBLY
EA 7.000 $2,081.580 $1,200.000 $1,000.000 $5,700.000
PEDESTRIAN PUSH BUTTON POLE
EA 1.000 $1,689.410 $870.000 $730.000 $5,700.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $825.430 $1,200.000 $1,000.000 $1,100.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,033.400 $4,200.000 $3,500.000 $4,200.000
REMOVAL OF SIGNAL HEAD ASSM
EA 4.000 $122.620 $420.000 $350.000 $260.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 2.000 $182.540 $64.000 $54.000 $33.000
TREE PROTECTION
EA 11.000 $338.640 $375.000 $300.000 $355.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 358.000 $94.970 $233.000 $230.000 $300.000
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
TON 119.000 $120.000 $273.000 $260.000 $495.000
BONDING COURSE
GAL 130.000 $2.840 $5.500 $5.250 $27.000
TY I DETECT WARNING TACTILE (12" X 7')
EA 17.000 $300.000 $300.000 $550.000 $780.000
ITS COM CBL (ETHERNET)
LF 185.000 $2.230 $2.800 $2.300 $6.500
CONDUIT (PREPARE)
LF 25.000 $1.770 $14.000 $12.000 $46.000
GROUND BOX (PREPARE)
EA 1.000 $298.010 $200.000 $170.000 $620.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 2.000 $6,791.110 $10,300.000 $10,000.000 $11,700.000
TMA (STATIONARY)
DAY 50.000 $151.920 $300.000 $250.000 $890.000
TMA (MOBILE OPERATION)
DAY 5.000 $233.770 $5,000.000 $585.000 $1,500.000
RVDS(PRESENCE AND ADVANCE DET)
EA 7.000 $7,109.770 $9,000.000 $7,500.000 $8,600.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 20.000 $2,457.840 $700.000 $450.000 $2,400.000
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
EA 10.000 $4,586.920 $1,250.000 $835.000 $3,000.000
Totals: $969,752.832 $1,318,917.450 $1,583,008.870 $2,100,926.900