TOM GREEN SH0208 (6474-38-001)

Items: 44

County: TOM GREEN
Length: 0.0100 MILES
Highway: SH0208
District: SAN ANGELO
Control Number: 6474-38-001
DBE Goal: N/A
Project: RMC - A00212376
Guaranty: $20,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $980,215.31
Date: 03/11/2025 (1 year ago)
Contract Number: 3250701
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212376
Project Description: MBGF AND CABLE BARRIER REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4502 KNICKERBOCKER RD, SAN ANGELO, TX 76904
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$980,215.31
$505,853.00
Over/Under Est: -48.39% -$474,362.31
Over/Under Est: -44.77% -$438,859.31
Amt Left: 7.02% $35,503.00
Over/Under Est: -37.67% -$369,208.31
Amt Left: 20.79% $105,154.00
Delta: -12.87% -$69,651.00
$870,843.00
Over/Under Est: -11.16% -$109,372.31
Amt Left: 72.15% $364,990.00
Delta: -42.53% -$259,836.00
Over/Under Est: -6.34% -$62,193.31
Amt Left: 81.48% $412,169.00
Delta: -5.42% -$47,179.00

Bid Items & Bid Tabulations

44 Total 0 of 44
TOM GREEN  |  SH0208  |  SAN ANGELO  |  6474-38-001  |  03/11/2025  |  $980,215.31  |  RMC - A00212376  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
BK FIELD OPERATIONS LLC
ROSS SA ENTERPRISE LLC
HJC FARMS, INC.
B & MS CONSTRUCTION, INC.
REMOV CONC (RIPRAP)
SY 45.000 $52.410 $20.000 $15.000 $5.000 $100.000 $80.000
RIPRAP (CONC)(4 IN)
CY 3.000 $920.000 $200.000 $500.000 $400.000 $750.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $752.080 $500.000 $400.000 $300.000 $250.000 $700.000
MOBILIZATION (CALLOUT)
EA 12.000 $1,300.000 $1.000 $1.000 $300.000 $100.000 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $158.000 $150.000 $100.000 $50.000 $50.000 $275.000
TMA (STATIONARY)
DAY 80.000 $280.000 $100.000 $1.000 $1,450.000 $200.000 $300.000
MTL W-BEAM GD FEN (STEEL POST)
LF 40.000 $36.000 $32.000 $35.000 $33.000 $40.000 $42.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,508.000 $1,200.000 $1,200.000 $1,000.000 $500.000 $1,600.000
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $100.000 $100.000 $500.000 $500.000 $1,000.000 $1,650.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,600.000 $22.220 $30.000 $26.000 $30.000 $40.000 $36.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 10.000 $32.670 $20.000 $200.000 $35.000 $1.000 $38.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $44.500 $20.000 $20.000 $35.000 $500.000 $48.000
REPLACE TIMBER POST W/O CONC FND
EA 30.000 $30.610 $20.000 $30.000 $50.000 $25.000 $55.000
REPLACE STEEL POST W/O CONC FND
EA 200.000 $64.670 $30.000 $65.000 $1.000 $225.000 $175.000
REPLACE TIMBER POST W/ CONC FND
EA 6.000 $25.500 $100.000 $30.000 $50.000 $25.000 $200.000
REPLACE STEEL POST W/ CONC FND
EA 60.000 $71.000 $50.000 $100.000 $100.000 $225.000 $125.000
REALIGN POSTS
EA 90.000 $33.720 $1.000 $50.000 $30.000 $10.000 $40.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $1.000 $1.000 $40.000 $100.000 $1.000 $125.000
REM OBSOLETE GET & REPL W/ SGT
EA 36.000 $3,750.000 $5,400.000 $4,000.000 $4,000.000 $7,500.000 $3,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,080.000 $1,000.000 $1,500.000 $1,100.000 $1,500.000 $1,600.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $30.860 $50.000 $30.000 $35.000 $30.000 $55.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 8.000 $155.000 $50.000 $400.000 $200.000 $5.000 $60.000
REPLACE BLOCKOUT
EA 300.000 $37.560 $10.000 $10.000 $20.000 $10.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $176.140 $200.000 $200.000 $300.000 $5.000 $250.000
RESET SGT IMPACT HEAD
EA 4.000 $140.300 $100.000 $250.000 $100.000 $125.000 $750.000
REPLACE SGT OBJECT MARKER
EA 4.000 $44.140 $30.000 $20.000 $1.000 $1.000 $75.000
REPLACE SGT CABLE ANCHOR
EA 2.000 $36.600 $80.000 $150.000 $1.000 $1.000 $78.000
REPLACE SGT CABLE ASSEMBLY
EA 2.000 $36.600 $80.000 $150.000 $1.000 $1.000 $76.000
REPLACE SGT STRUT
EA 2.000 $66.600 $80.000 $150.000 $1.000 $1.000 $76.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $850.000 $1,200.000 $1,200.000 $1,000.000 $1.000 $600.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 300.000 $443.000 $160.000 $210.000 $200.000 $400.000 $280.000
REPLACE POSTS (TL-4)(TRINITY)
EA 300.000 $365.000 $230.000 $200.000 $200.000 $200.000 $245.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 6.000 $100.220 $100.000 $100.000 $100.000 $500.000 $97.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 2.000 $1,003.330 $1.000 $1.000 $1.000 $250.000 $980.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 14.000 $2,455.560 $1,200.000 $1,800.000 $1,000.000 $2,000.000 $1,800.000
REPLACE CABLE (TL-3)
LF 2.000 $0.750 $1.000 $2.000 $5.000 $1.000 $344.000
REPLACE CABLE (TL-4)
LF 30.000 $3.710 $1.000 $50.000 $10.000 $1.000 $33.000
CHECK / RE-TENSION CABLE (TL-3)
EA 240.000 $898.250 $10.000 $1.000 $1.000 $225.000 $250.000
REPLACE POST HARDWARE (TL-4)
EA 100.000 $1,000.000 $20.000 $150.000 $50.000 $10.000 $125.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 2.000 $100.000 $50.000 $50.000 $100.000 $30.000 $76.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 6.000 $11.000 $5.000 $50.000 $100.000 $10.000 $45.000
REPLACE (NARROW QUAD)
EA 2.000 $25,500.000 $1.000 $26,000.000 $10,000.000 $25,000.000 $24,500.000
REPLACE (WIDE TRACC)
EA 3.000 $100.000 $1.000 $1.000 $5,000.000 $5.000 $24,000.000
REPAIR (T101)
LF 50.000 $40.000 $20.000 $50.000 $50.000 $5.000 $1,350.000
Totals: $980,215.310 $505,853.000 $541,356.000 $611,007.000 $870,843.000 $918,022.000