TOM GREEN SH0208 (6392-07-001)

Items: 56

County: TOM GREEN
Length: N/A
Highway: SH0208
District: SAN ANGELO
Control Number: 6392-07-001
DBE Goal: N/A
Project: RMC - 639207001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,134,237.03
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,134,237.03
$942,182.13
Over/Under Est: -16.93% -$192,054.90
$1,311,265.00
Over/Under Est: 15.61% $177,027.97
Amt Left: 39.17% $369,082.87
$1,600,324.00
Over/Under Est: 41.09% $466,086.97
Amt Left: 69.85% $658,141.87
Delta: -22.04% -$289,059.00

Bid Items & Bid Tabulations

56 Total 0 of 56
TOM GREEN  |  SH0208  |  SAN ANGELO  |  6392-07-001  |  04/06/2022  |  $1,134,237.03  |  RMC - 639207001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
HJC FARMS, INC.
DIGG COMMERCIAL, LLC
REMOVING CONC (RIPRAP)
SY 100.000 $3.180 $1.000 $15.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $483.000 $400.000 $400.000 $1,000.000
MOBILIZATION (CALLOUT)
EA 12.000 $100.000 $1.000 $5,000.000 $1,000.000
MTL W-BEAM GD FEN (STEEL POST)
LF 600.000 $20.000 $30.000 $30.000 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,458.000 $1,200.000 $900.000 $3,000.000
MTL BM GD FEN TRANS (31"-28")
EA 56.000 $283.000 $100.000 $500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,613.000 $1.310 $0.010 $1.000 $3.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $343.000 $1.000 $500.000 $1,000.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 4.000 $3,000.000 $2,000.000 $3,500.000 $4,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 6,518.000 $22.000 $28.000 $26.500 $40.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $5.000 $20.000 $50.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $5.000 $20.000 $55.000 $52.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 239.000 $23.000 $20.000 $45.000 $40.000
REM / REPL TIMBER POST W / O CONC FND
EA 31.000 $45.000 $30.000 $45.000 $100.000
REM / REPL STEEL POST W / O CONC FND
EA 392.000 $90.000 $60.000 $95.000 $150.000
REM / REPL TIMBER POST W / CONC FND
EA 10.000 $90.000 $30.000 $55.000 $200.000
REM / REPL STEEL POST W / CONC FND
EA 35.000 $90.000 $50.000 $100.000 $250.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $200.000 $100.000 $250.000 $400.000
REALIGN POSTS
EA 152.000 $25.000 $10.000 $15.000 $100.000
REMOVE & REPLACE BLOCKOUT
EA 494.000 $45.000 $10.000 $10.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 100.000 $30.000 $30.000 $40.000 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 20.000 $58.000 $40.000 $250.000 $200.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $2.000 $1.000 $1.000 $250.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $1.000 $1.000 $1.000 $400.000
REPLACE HINGED TOP SGT STEEL POST
EA 10.000 $212.000 $60.000 $80.000 $500.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 107.000 $5,088.000 $4,200.000 $3,950.000 $3,600.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $1,000.000 $750.000 $1,000.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $318.000 $1.000 $500.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 4.000 $92.000 $50.000 $75.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $80.000 $50.000 $60.000 $200.000
REPLACE SGT STRUT
EA 4.000 $55.000 $50.000 $70.000 $200.000
REPLACE SGT OBJECT MARKER
EA 4.000 $30.000 $30.000 $30.000 $50.000
REMOVE AND REPLACE LONG SPAN CRT POST
EA 20.000 $53.000 $50.000 $70.000 $300.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 150.000 $42.000 $25.000 $32.000 $90.000
REPLACE POSTS (TL-4)
EA 629.000 $142.000 $150.000 $360.000 $400.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 15.000 $106.000 $100.000 $50.000 $400.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 15.000 $530.000 $1,000.000 $1,000.000 $3,600.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 15.000 $530.000 $1,000.000 $1,000.000 $3,600.000
REPLACE CABLE (TL-3)
LF 800.000 $2.120 $0.010 $1.000 $3.000
REPLACE CABLE (TL-4)
LF 500.000 $5.000 $0.010 $1.000 $3.000
CHECK / RE-TENSION CABLE
EA 405.000 $100.000 $1.000 $100.000 $60.000
REPLACE POST HARDWARE (TL-4)
EA 1,081.000 $53.000 $40.000 $50.000 $35.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 1,435.000 $14.000 $10.000 $20.000 $16.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $62.000 $30.000 $50.000 $250.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 7.000 $50.000 $20.000 $75.000 $300.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 2,650.000 $3.000 $3.000 $2.000 $9.000
REPAIR (TRACC)
LF 15.000 $106.000 $100.000 $1,000.000 $200.000
REPAIR (WIDE TRACC)
LF 15.000 $150.000 $100.000 $1,000.000 $300.000
REPAIR (QUAD) (N) (BAY)
EA 4.000 $800.000 $250.000 $1,000.000 $1,500.000
REPAIR (QUAD) (W) (BAY)
EA 4.000 $827.000 $250.000 $1,000.000 $500.000
REPAIR (GREAT SYS) (BAY)
EA 6.000 $265.000 $100.000 $1,000.000 $3,000.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 20.000 $85.000 $50.000 $75.000 $200.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 20.000 $85.000 $50.000 $75.000 $230.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 35.000 $53.000 $50.000 $250.000 $250.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 20.000 $53.000 $50.000 $250.000 $260.000
TMA (STATIONARY)
DAY 120.000 $175.000 $1.000 $250.000 $350.000
Totals: $1,134,237.030 $942,182.130 $1,311,265.000 $1,600,324.000