Show Job Controls
Bid Cobra

TOM GREEN SH0208 (6316-77-001)

Items: 44

County: TOM GREEN
Length: N/A
Highway: SH0208
District: SAN ANGELO
Control Number: 6316-77-001
DBE Goal: N/A
Project: RMC - 631677001
Guaranty: N/A
Time: 180 W
Engineer's Estimate: $286,159.51
Date: 07/13/2017 (8 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$286,159.51
$319,359.00
Over/Under Est: 11.6% $33,199.49
$347,629.00
Over/Under Est: 21.48% $61,469.49
Amt Left: 8.85% $28,270.00

Bid Items & Bid Tabulations

44 Total 0 of 44
TOM GREEN  |  SH0208  |  SAN ANGELO  |  6316-77-001  |  07/13/2017  |  $286,159.51  |  RMC - 631677001  |  METAL BEAM GUARD FENCE REPAIR  |  180 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
HJC FARMS, INC.
REMOVING CONC (RIPRAP)
SY 468.000 $13.110 $3.000 $10.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $380.660 $550.000 $750.000
MTL W-BEAM GD FEN (STEEL POST)
LF 875.000 $23.810 $30.000 $25.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,014.640 $900.000 $900.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $2.350 $3.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $155.190 $200.000 $100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $1,580.000 $500.000 $2,500.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 4.000 $2,222.420 $4,000.000 $3,750.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $15.150 $20.000 $25.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 30.000 $24.350 $2.000 $15.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 200.000 $25.110 $2.500 $30.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 200.000 $21.460 $13.000 $15.000
REM / REPL TIMBER POST W / O CONC FND
EA 10.000 $19.800 $50.000 $30.000
REM / REPL STEEL POST W / O CONC FND
EA 100.000 $79.210 $50.000 $150.000
REM / REPL TIMBER POST W / CONC FND
EA 10.000 $68.940 $50.000 $1.000
REM / REPL STEEL POST W / CONC FND
EA 100.000 $102.780 $150.000 $75.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $143.800 $200.000 $25.000
REALIGN POSTS
EA 100.000 $15.800 $20.000 $15.000
REMOVE & REPLACE BLOCKOUT
EA 150.000 $8.080 $8.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 750.000 $19.020 $25.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 20.000 $52.410 $50.000 $200.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $16.690 $2.000 $1.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $49.320 $2.500 $1.000
REPLACE HINGED TOP SGT STEEL POST
EA 5.000 $61.850 $100.000 $200.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $2,813.000 $3,000.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 8.000 $609.070 $600.000 $800.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $101.870 $100.000 $300.000
REPLACE SGT CABLE ASSEMBLY
EA 4.000 $63.230 $100.000 $20.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $65.210 $100.000 $20.000
REPLACE SGT STRUT
EA 4.000 $50.030 $100.000 $1.000
REPLACE SGT OBJECT MARKER
EA 4.000 $21.290 $100.000 $20.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 1,600.000 $14.430 $12.000 $5.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $53.330 $50.000 $30.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 5.000 $84.110 $200.000 $100.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 400.000 $7.620 $5.000 $5.000
REPAIR (TRACC)
LF 15.000 $70.080 $200.000 $250.000
REPAIR (WIDE TRACC)
LF 15.000 $51.830 $200.000 $500.000
REPAIR (QUAD) (N) (BAY)
EA 4.000 $997.330 $1,350.000 $250.000
REPAIR (QUAD) (W) (BAY)
EA 4.000 $1,028.000 $1,350.000 $250.000
REPAIR (GREAT SYS) (BAY)
EA 6.000 $1,216.670 $800.000 $500.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 20.000 $59.400 $80.000 $25.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 20.000 $46.840 $80.000 $25.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 35.000 $178.570 $150.000 $25.000
REP METAL POST W/ BASE PLATE (T6 RAIL)
EA 20.000 $180.490 $150.000 $25.000
Totals: $286,159.510 $319,359.000 $347,629.000