PREPARING ROW
|
AC
|
0.250
|
$5,975.000
|
$14,089.440
|
$7,500,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
55.000
|
$24.000
|
$56.200
|
$17.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
342.000
|
$20.000
|
$25.740
|
$17.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,127.000
|
$10.000
|
$8.220
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8.5")
|
SY
|
89,813.000
|
$9.500
|
$4.380
|
$3.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10.5")
|
SY
|
84,721.000
|
$11.000
|
$4.840
|
$3.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (3"-5")
|
SY
|
2,983.000
|
$8.000
|
$5.400
|
$3.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
74,552.000
|
$9.500
|
$9.820
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
10,440.000
|
$9.500
|
$4.460
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
273,654.000
|
$1.000
|
$0.270
|
$1.500
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
|
SY
|
273,654.000
|
$0.400
|
$0.300
|
$0.290
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
136,827.000
|
$0.300
|
$0.280
|
$0.290
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
136,827.000
|
$0.300
|
$0.280
|
$0.290
|
|
|
PROOF ROLLING
|
HR
|
96.000
|
$135.000
|
$75.300
|
$140.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
232,531.000
|
$8.400
|
$8.810
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
69,759.000
|
$4.550
|
$3.640
|
$4.500
|
|
|
PRIME COAT (RC-250)
|
GAL
|
34,702.000
|
$4.500
|
$4.820
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
22,810.000
|
$3.250
|
$2.250
|
$4.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
1,246.000
|
$5.500
|
$13.370
|
$5.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
69,767.000
|
$3.500
|
$4.040
|
$4.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,114.000
|
$136.000
|
$112.760
|
$120.000
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
1,052.000
|
$206.000
|
$149.420
|
$120.000
|
|
|
CURB (TYPE II)
|
LF
|
245.000
|
$6.000
|
$18.440
|
$25.000
|
|
|
CONC PVMT (CONT REINF-CRCP) (HES) (9")
|
SY
|
8,032.000
|
$51.000
|
$115.890
|
$85.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
386.000
|
$14.000
|
$5.730
|
$21.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
21.000
|
$80.000
|
$101.240
|
$110.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60.000
|
$3.000
|
$1.390
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
279.000
|
$22.000
|
$12.340
|
$65.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
169.000
|
$500.000
|
$459.160
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
66.000
|
$500.000
|
$918.650
|
$700.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
29.000
|
$450.000
|
$762.500
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
255.000
|
$480.000
|
$986.960
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$570.000
|
$1,470.370
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
689.000
|
$121.000
|
$50.580
|
$120.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
2,791.000
|
$154.000
|
$117.040
|
$240.000
|
|
|
RC PIPE (ARCH)(CL V)(DES 1)
|
LF
|
2,328.000
|
$160.000
|
$146.200
|
$250.000
|
|
|
INLET (COMPL)(PAZD)(SL)(3FTX3FT)
|
EA
|
1.000
|
$4,625.000
|
$4,621.050
|
$4,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
8.000
|
$5,000.000
|
$5,196.220
|
$3,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$6,400.000
|
$6,387.390
|
$4,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
26.000
|
$7,750.000
|
$4,373.660
|
$7,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$10,476.410
|
$11,000.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
191.000
|
$2,300.000
|
$1,465.370
|
$1,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,660.000
|
$1,282.370
|
$750.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$300.000
|
$422.640
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
212.000
|
$20.000
|
$13.020
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,669,512.740
|
$1,470,642.970
|
$2,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$8,500.000
|
$6,078.330
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
497.000
|
$28.000
|
$32.680
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,875.000
|
$53.000
|
$100.300
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,372.000
|
$26.000
|
$22.220
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
260.000
|
$35.000
|
$16.200
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
260.000
|
$13.000
|
$6.240
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,828.000
|
$2.500
|
$2.130
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,828.000
|
$0.620
|
$0.590
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,735.000
|
$5.000
|
$5.690
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,735.000
|
$0.850
|
$1.760
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,838.000
|
$80.000
|
$15.090
|
$41.000
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,700.000
|
$145.000
|
$1.230
|
$55.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,020.000
|
$23.000
|
$5.030
|
$5.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,700.000
|
$18.000
|
$4.200
|
$11.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
830.000
|
$35.000
|
$18.440
|
$25.000
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
48.000
|
$16.000
|
$18.440
|
$35.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,793.000
|
$33.000
|
$78.480
|
$56.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
566.000
|
$100.000
|
$85.400
|
$55.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,527.000
|
$35.000
|
$37.040
|
$30.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
5,250.000
|
$30.000
|
$27.210
|
$4.000
|
|
|
TURNOUTS (ACP)
|
SY
|
699.000
|
$42.000
|
$276.100
|
$50.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
342.000
|
$80.000
|
$102.140
|
$65.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
22,920.000
|
$0.200
|
$0.390
|
$0.120
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
21,329.000
|
$0.200
|
$0.390
|
$0.160
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
16.000
|
$1,075.000
|
$1,964.070
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
24.000
|
$650.000
|
$785.630
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
24.000
|
$10,667.000
|
$256.470
|
$8,100.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
58.000
|
$250.000
|
$230.530
|
$250.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
6.000
|
$385.000
|
$384.220
|
$400.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
13.000
|
$9.000
|
$30.740
|
$50.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
54.000
|
$1.450
|
$3.590
|
$15.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
58.000
|
$600.000
|
$701.840
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
24.000
|
$600.000
|
$801.230
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
|
EA
|
4.000
|
$1,001.000
|
$743.850
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$685.000
|
$860.660
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$830.000
|
$977.460
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,025.000
|
$1,077.870
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$870.000
|
$1,049.180
|
$990.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$960.000
|
$1,103.490
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$1,335.000
|
$1,564.550
|
$1,900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
83.000
|
$99.000
|
$138.820
|
$80.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
342.000
|
$0.410
|
$0.200
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
177,063.000
|
$0.230
|
$0.130
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,936.000
|
$0.850
|
$0.360
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
252.000
|
$2.600
|
$2.050
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
6.000
|
$20.620
|
$10.250
|
$44.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
8,626.000
|
$0.230
|
$0.200
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
181,990.000
|
$0.260
|
$0.130
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
34.000
|
$1.700
|
$2.720
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
23,569.000
|
$0.500
|
$0.260
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
|
EA
|
41.000
|
$58.000
|
$10.250
|
$44.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
14,374.000
|
$0.500
|
$0.260
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
102.000
|
$1.450
|
$24.430
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,921.000
|
$0.900
|
$3.880
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,936.000
|
$0.750
|
$1.230
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
252.000
|
$6.400
|
$8.150
|
$6.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
6.000
|
$10.500
|
$51.230
|
$44.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
34.000
|
$8.000
|
$8.150
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
342.000
|
$0.320
|
$0.560
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
71,350.000
|
$0.260
|
$0.370
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
8,801.000
|
$0.580
|
$0.370
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
53,562.000
|
$0.350
|
$0.370
|
$0.360
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
15.000
|
$230.000
|
$256.150
|
$211.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$284.000
|
$307.380
|
$221.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
178.000
|
$3.400
|
$4.200
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,256.000
|
$2.750
|
$4.200
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
80.000
|
$3.300
|
$4.200
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
307,100.000
|
$0.750
|
$0.050
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
26.000
|
$20.000
|
$10.250
|
$33.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
8.000
|
$5.060
|
$20.490
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
6.000
|
$5.060
|
$20.490
|
$50.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
5.000
|
$5,000.000
|
$5,122.950
|
$2,500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$8,000.000
|
$1,123.230
|
$3,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
12.000
|
$1,150.000
|
$1,785.850
|
$2,000.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
32,714.000
|
$95.000
|
$95.520
|
$100.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
21,809.000
|
$95.000
|
$104.650
|
$110.000
|
|
|
TACK COAT
|
GAL
|
19,827.000
|
$2.000
|
$2.460
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,522.000
|
$88.000
|
$56.620
|
$80.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
320.000
|
$3.100
|
$20.490
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
122.000
|
$150.000
|
$210.220
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
55.000
|
$265.000
|
$384.720
|
$250.000
|
|
Totals: |
$18,364,640.120
|
$16,563,814.490
|
$20,938,317.530
|