TOM GREEN FM 2105 (2410-01-011)

Items: 127

County: TOM GREEN
Length: N/A
Highway: FM 2105
District: SAN ANGELO
Control Number: 2410-01-011
DBE Goal: N/A
Project: STP 2020(653)
Guaranty: N/A
Time: 401 WORKING DAYS
Engineer's Estimate: $18,364,640.12
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$18,364,640.12
$16,563,814.49
Over/Under Est: -9.81% -$1,800,825.63
Over/Under Est: 14.01% $2,573,677.41
Amt Left: 26.41% $4,374,503.04

Bid Items & Bid Tabulations

127 Total 0 of 127
TOM GREEN  |  FM 2105  |  SAN ANGELO  |  2410-01-011  |  03/05/2020  |  $18,364,640.12  |  STP 2020(653)  |  REHAB OF EXIST ROADWAY  |  401 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
AC 0.250 $5,975.000 $14,089.440 $7,500,000.000
REMOVING CONC (RIPRAP)
SY 55.000 $24.000 $56.200 $17.000
REMOVING CONC (DRIVEWAYS)
SY 342.000 $20.000 $25.740 $17.000
REMOVING CONC (CURB)
LF 1,127.000 $10.000 $8.220 $12.000
REMOVING STAB BASE AND ASPH PAV(8.5")
SY 89,813.000 $9.500 $4.380 $3.000
REMOVING STAB BASE AND ASPH PAV (10.5")
SY 84,721.000 $11.000 $4.840 $3.000
REMOVING STAB BASE AND ASPH PAV (3"-5")
SY 2,983.000 $8.000 $5.400 $3.000
EXCAVATION (ROADWAY)
CY 74,552.000 $9.500 $9.820 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 10,440.000 $9.500 $4.460 $15.000
FURNISHING AND PLACING TOPSOIL (4")
SY 273,654.000 $1.000 $0.270 $1.500
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 273,654.000 $0.400 $0.300 $0.290
CELL FBR MLCH SEED(TEMP)(WARM)
SY 136,827.000 $0.300 $0.280 $0.290
CELL FBR MLCH SEED(TEMP)(COOL)
SY 136,827.000 $0.300 $0.280 $0.290
PROOF ROLLING
HR 96.000 $135.000 $75.300 $140.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 232,531.000 $8.400 $8.810 $12.000
PRIME COAT (MC-30)
GAL 69,759.000 $4.550 $3.640 $4.500
PRIME COAT (RC-250)
GAL 34,702.000 $4.500 $4.820 $5.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 22,810.000 $3.250 $2.250 $4.000
FOG SEAL (CSS-1H)
GAL 1,246.000 $5.500 $13.370 $5.000
ASPH (AC-20-5TR)
GAL 69,767.000 $3.500 $4.040 $4.000
AGGR(TY-PB GR-4 SAC-B)
CY 2,114.000 $136.000 $112.760 $120.000
AGGR(TY-PB GR-5 SAC-B)
CY 1,052.000 $206.000 $149.420 $120.000
CURB (TYPE II)
LF 245.000 $6.000 $18.440 $25.000
CONC PVMT (CONT REINF-CRCP) (HES) (9")
SY 8,032.000 $51.000 $115.890 $85.000
STRUCT EXCAV (PIPE)
CY 386.000 $14.000 $5.730 $21.000
CUT & RESTORE ASPH PAVING
SY 21.000 $80.000 $101.240 $110.000
TRENCH EXCAVATION PROTECTION
LF 60.000 $3.000 $1.390 $1.000
TEMPORARY SPL SHORING
SF 279.000 $22.000 $12.340 $65.000
RIPRAP (CONC)(5 IN)
CY 169.000 $500.000 $459.160 $500.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 66.000 $500.000 $918.650 $700.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 29.000 $450.000 $762.500 $700.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 255.000 $480.000 $986.960 $750.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 12.000 $570.000 $1,470.370 $1,200.000
RC PIPE (CL III)(18 IN)
LF 689.000 $121.000 $50.580 $120.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 2,791.000 $154.000 $117.040 $240.000
RC PIPE (ARCH)(CL V)(DES 1)
LF 2,328.000 $160.000 $146.200 $250.000
INLET (COMPL)(PAZD)(SL)(3FTX3FT)
EA 1.000 $4,625.000 $4,621.050 $4,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 8.000 $5,000.000 $5,196.220 $3,500.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,400.000 $6,387.390 $4,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
EA 26.000 $7,750.000 $4,373.660 $7,500.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $6,500.000 $10,476.410 $11,000.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 191.000 $2,300.000 $1,465.370 $1,500.000
CLEAN EXIST CULVERTS
EA 11.000 $2,660.000 $1,282.370 $750.000
REMOV STR (SET)
EA 8.000 $300.000 $422.640 $750.000
REMOV STR (PIPE)
LF 212.000 $20.000 $13.020 $35.000
MOBILIZATION
LS 1.000 $1,669,512.740 $1,470,642.970 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $8,500.000 $6,078.330 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 497.000 $28.000 $32.680 $35.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,875.000 $53.000 $100.300 $50.000
ROCK FILTER DAMS (REMOVE)
LF 2,372.000 $26.000 $22.220 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 260.000 $35.000 $16.200 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 260.000 $13.000 $6.240 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,828.000 $2.500 $2.130 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,828.000 $0.620 $0.590 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,735.000 $5.000 $5.690 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,735.000 $0.850 $1.760 $1.000
CONSTRUCTING DETOURS
SY 4,838.000 $80.000 $15.090 $41.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 1,700.000 $145.000 $1.230 $55.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,020.000 $23.000 $5.030 $5.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,700.000 $18.000 $4.200 $11.000
CONC CURB & GUTTER (TY II)
LF 830.000 $35.000 $18.440 $25.000
CONC CURB & GUTTER (SLOTTED)
LF 48.000 $16.000 $18.440 $35.000
INTERSECTIONS (ACP)
SY 2,793.000 $33.000 $78.480 $56.000
DRIVEWAYS (CONC)
SY 566.000 $100.000 $85.400 $55.000
DRIVEWAYS (ACP)
SY 8,527.000 $35.000 $37.040 $30.000
DRIVEWAYS (SURF TREAT)
SY 5,250.000 $30.000 $27.210 $4.000
TURNOUTS (ACP)
SY 699.000 $42.000 $276.100 $50.000
DRIVEWAYS (CONC) (HES)
SY 342.000 $80.000 $102.140 $65.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 22,920.000 $0.200 $0.390 $0.120
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 21,329.000 $0.200 $0.390 $0.160
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $1,075.000 $1,964.070 $1,300.000
CRASH CUSH ATTEN (REMOVE)
EA 24.000 $650.000 $785.630 $800.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 24.000 $10,667.000 $256.470 $8,100.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 58.000 $250.000 $230.530 $250.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 6.000 $385.000 $384.220 $400.000
CONDT (PVC) (SCH 40) (2")
LF 13.000 $9.000 $30.740 $50.000
ELEC CONDR (NO.8) INSULATED
LF 54.000 $1.450 $3.590 $15.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 58.000 $600.000 $701.840 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $600.000 $801.230 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 4.000 $1,001.000 $743.850 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $685.000 $860.660 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $830.000 $977.460 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,025.000 $1,077.870 $950.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $870.000 $1,049.180 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 2.000 $960.000 $1,103.490 $1,400.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $1,335.000 $1,564.550 $1,900.000
REMOVE SM RD SN SUP&AM
EA 83.000 $99.000 $138.820 $80.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 342.000 $0.410 $0.200 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 177,063.000 $0.230 $0.130 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,936.000 $0.850 $0.360 $0.650
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 252.000 $2.600 $2.050 $6.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 6.000 $20.620 $10.250 $44.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 8,626.000 $0.230 $0.200 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 181,990.000 $0.260 $0.130 $0.300
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 34.000 $1.700 $2.720 $8.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 23,569.000 $0.500 $0.260 $0.650
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
EA 41.000 $58.000 $10.250 $44.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 14,374.000 $0.500 $0.260 $0.650
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 102.000 $1.450 $24.430 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,921.000 $0.900 $3.880 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,936.000 $0.750 $1.230 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 252.000 $6.400 $8.150 $6.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 6.000 $10.500 $51.230 $44.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 34.000 $8.000 $8.150 $8.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 342.000 $0.320 $0.560 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 71,350.000 $0.260 $0.370 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 8,801.000 $0.580 $0.370 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 53,562.000 $0.350 $0.370 $0.360
PREFAB PAV MRK TY C (W) (ARROW)
EA 15.000 $230.000 $256.150 $211.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $284.000 $307.380 $221.000
REFL PAV MRKR TY I-C
EA 178.000 $3.400 $4.200 $5.000
REFL PAV MRKR TY II-A-A
EA 1,256.000 $2.750 $4.200 $4.000
REFL PAV MRKR TY II-C-R
EA 80.000 $3.300 $4.200 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 307,100.000 $0.750 $0.050 $0.500
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
EA 26.000 $20.000 $10.250 $33.000
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $5.060 $20.490 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $5.060 $20.490 $50.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 5.000 $5,000.000 $5,122.950 $2,500.000
FULL - WIDTH MOWING
CYC 4.000 $8,000.000 $1,123.230 $3,500.000
LITTER REMOVAL
CYC 12.000 $1,150.000 $1,785.850 $2,000.000
SP MIXES SP-B PG64-22
TON 32,714.000 $95.000 $95.520 $100.000
SP MIXES SP-C SAC-B PG70-22
TON 21,809.000 $95.000 $104.650 $110.000
TACK COAT
GAL 19,827.000 $2.000 $2.460 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,522.000 $88.000 $56.620 $80.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 320.000 $3.100 $20.490 $4.000
TMA (STATIONARY)
DAY 122.000 $150.000 $210.220 $250.000
TMA (MOBILE OPERATION)
DAY 55.000 $265.000 $384.720 $250.000
Totals: $18,364,640.120 $16,563,814.490 $20,938,317.530