Show Job Controls
Bid Cobra

TOM GREEN FM 388 (2284-01-032)

Items: 57

County: TOM GREEN
Length: N/A
Highway: FM 388
District: SAN ANGELO
Control Number: 2284-01-032
DBE Goal: 0.0%
Project: STP 2024(907)VRU
Guaranty: N/A
Time: 50 WORKING DAYS
Engineer's Estimate: $384,834.06
Date: 04/05/2024 (2 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
CHUKWUMA OSEMEKE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$384,834.06
$355,503.25
Over/Under Est: -7.62% -$29,330.81
$479,420.60
Over/Under Est: 24.58% $94,586.54
Amt Left: 34.86% $123,917.35
$541,648.55
Over/Under Est: 40.75% $156,814.49
Amt Left: 52.36% $186,145.30
Delta: -12.98% -$62,227.95
Subcontractor Percentage Amount
PAVEMENT MARKINGS INC. 7.28% $25,880.64
LAWLEY CONTRACTING, LLC 3.60% $12,798.12
WESTERN TOWERS 1.12% $3,981.64
BARRICADES UNLIMITED 0.83% $2,950.68
3D CRANE SERVICES, L.L.C. 0.23% $817.66
Total: 13.06% $46,428.74

Bid Items & Bid Tabulations

57 Total 0 of 57
TOM GREEN  |  FM 388  |  SAN ANGELO  |  2284-01-032  |  04/05/2024  |  $384,834.06  |  STP 2024(907)VRU  |  INTERS IMPRV  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
YUNEX LLC
3LW CIVIL LLC
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 22.000 $452.400 $425.000 $1,452.700 $330.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 13.000 $498.000 $500.000 $2,523.500 $385.000
RIPRAP (CONC)(6 IN)
CY 2.000 $2,400.000 $1,500.000 $3,053.900 $1,500.000
MOBILIZATION
LS 1.000 $34,985.760 $35,500.000 $44,468.700 $71,825.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $10,800.000 $4,500.000 $3,896.200 $20,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 60.000 $6.750 $15.000 $22.000 $0.100
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $5.300 $5.000 $2.600 $0.100
CONC CURB & GUTTER (TY II)
LF 26.500 $165.600 $150.000 $155.600 $250.000
CONC SIDEWALKS (6")
SY 32.000 $240.000 $400.000 $305.400 $300.000
CURB RAMPS (TY 7)
SY 6.000 $600.000 $1,000.000 $488.700 $2,500.000
CONDT (PVC) (SCH 80) (2")
LF 75.000 $36.000 $30.000 $26.000 $22.000
CONDT (PVC) (SCH 80) (3")
LF 140.000 $48.000 $35.000 $29.800 $23.000
CONDT (PVC) (SCH 80) (4")
LF 10.000 $60.000 $50.000 $42.200 $82.500
CONDT (PVC) (SCH 80) (4") (BORE)
LF 320.000 $72.000 $55.000 $40.400 $27.500
ELEC CONDR (NO.12) INSULATED
LF 80.000 $4.660 $5.000 $2.200 $2.750
ELEC CONDR (NO.8) BARE
LF 490.000 $3.440 $3.000 $3.700 $2.750
ELEC CONDR (NO.8) INSULATED
LF 480.000 $3.600 $3.000 $4.000 $2.750
GROUND BOX TY C (162911)W/APRON
EA 5.000 $2,445.970 $1,500.000 $2,178.000 $1,650.000
REMOVE GROUND BOX
EA 5.000 $842.440 $250.000 $439.300 $1,000.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $9,700.000 $10,000.000 $10,015.400 $8,250.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 410.000 $8.200 $14.800 $14.700 $10.450
PAVEMENT SEALER 6"
LF 2,685.000 $0.240 $0.450 $2.500 $0.830
PAVEMENT SEALER 24"
LF 410.000 $2.870 $1.400 $4.900 $2.200
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 400.000 $0.580 $1.800 $5.500 $3.580
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 685.000 $0.790 $1.800 $5.500 $1.930
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 1,600.000 $0.670 $1.800 $5.500 $2.200
REFL PAV MRKR TY I-C
EA 40.000 $5.790 $6.800 $18.400 $7.700
REFL PAV MRKR TY II-A-A
EA 80.000 $25.960 $6.800 $18.400 $7.700
ELIM EXT PAV MRK & MRKS (4")
LF 2,000.000 $3.790 $1.200 $4.300 $2.200
ELIM EXT PAV MRK & MRKS (24")
LF 550.000 $4.510 $6.000 $6.200 $3.300
PAV SURF PREP FOR MRK (6")
LF 2,685.000 $1.000 $1.400 $3.400 $0.660
PAV SURF PREP FOR MRK (24")
LF 410.000 $3.600 $1.000 $6.800 $2.200
PAV SURF PREP FOR MRK (RPM)
EA 120.000 $8.400 $1.000 $6.200 $0.550
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $30,000.000 $51,700.000 $71,841.400 $93,500.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $18,000.000 $10,000.000 $30,874.300 $45,000.000
VEH SIG SEC (12")LED(GRN)
EA 12.000 $408.000 $350.000 $383.800 $330.000
VEH SIG SEC (12")LED(YEL)
EA 12.000 $408.000 $350.000 $383.800 $330.000
VEH SIG SEC (12")LED(RED)
EA 12.000 $408.000 $350.000 $383.800 $330.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $1,206.000 $750.000 $743.400 $715.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 12.000 $162.000 $250.000 $247.700 $165.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 515.000 $4.800 $3.000 $4.000 $3.030
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 540.000 $4.800 $5.000 $5.100 $4.130
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 510.000 $4.800 $7.500 $8.700 $6.600
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,060.000 $4.800 $3.000 $3.000 $2.420
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $13,250.180 $14,500.000 $12,296.000 $11,000.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $13,800.000 $16,000.000 $14,372.600 $13,750.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $14,139.060 $15,500.000 $13,151.100 $13,200.000
PED POLE ASSEMBLY
EA 4.000 $4,140.000 $3,000.000 $4,088.200 $3,300.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,161.000 $1,250.000 $1,376.100 $825.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $5,400.000 $3,500.000 $5,211.700 $3,850.000
TREE TRIMMING AND BRUSH REMOVAL
LF 25.000 $10.800 $50.000 $69.700 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $99.290 $250.000 $122.200 $1,000.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $12,000.000 $10,000.000 $8,591.100 $9,900.000
RELOCATE ITS RADIO
EA 1.000 $3,720.000 $1,000.000 $1,377.300 $770.000
CAT 5 ETHERNET CABLE
LF 145.000 $15.000 $4.000 $4.700 $2.200
TMA (STATIONARY)
DAY 6.000 $194.780 $500.000 $244.400 $400.000
TMA (MOBILE OPERATION)
DAY 8.000 $228.960 $500.000 $244.400 $385.000
Totals: $384,834.060 $355,503.250 $479,420.600 $541,648.550