Show Job Controls
Bid Cobra

TOM GREEN VARIOUS (0907-00-236)

Items: 64

County: TOM GREEN
Length: 0.0000 MILES
Highway: VARIOUS
District: SAN ANGELO
Control Number: 0907-00-236
DBE Goal: 0.0%
Project: F 2026(663)
Guaranty: $42,000.00
Time: 158 WORKING DAYS
Engineer's Estimate: $2,079,597.30
Date: 06/02/2026 (8 days ago)
Contract Number: 6263021
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Project ID: A00198038
Contract Type: Federal
Project Description: ADA CURB RAMPS AND SIDEWALKS REMEDIATION PROJECT FY2026
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
THOMAS GATLIN
MATTHEW HOLMES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$2,079,597.30
$1,672,395.44
Over/Under Est: -19.58% -$407,201.86
Over/Under Est: -7.31% -$152,097.30
Amt Left: 15.25% $255,104.56
$1,967,078.05
Over/Under Est: -5.41% -$112,519.25
Amt Left: 17.62% $294,682.61
Delta: -2.05% -$39,578.05
$1,974,988.76
Over/Under Est: -5.03% -$104,608.54
Amt Left: 18.09% $302,593.32
Delta: -0.40% -$7,910.71
$1,977,584.19
Over/Under Est: -4.91% -$102,013.11
Amt Left: 18.25% $305,188.75
Delta: -0.13% -$2,595.43
$2,424,103.41
Over/Under Est: 16.57% $344,506.11
Amt Left: 44.95% $751,707.97
Delta: -22.58% -$446,519.22
Over/Under Est: 63.56% $1,321,704.20
Amt Left: 103.38% $1,728,906.06
Delta: -40.31% -$977,198.09

Bid Items & Bid Tabulations

64 Total 0 of 64
TOM GREEN  |  VARIOUS  |  SAN ANGELO  |  0907-00-236  |  06/02/2026  |  $2,079,597.30  |  F 2026(663)  |  BICYCLE AND PEDESTRIAN IMPRVS  |  158 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, LLC
DELGADO'S CONTRACTORS, LLC
TUCAN CONTRACTING, LLC
STX CIVIL
3LW CIVIL LLC
REECE ALBERT, INC.
O. TREVINO CONSTRUCTION, LLC
REMOV CONC (DRIVEWAYS)
SY 2,837.000 $20.000 $24.280 $20.000 $11.000 $19.340 $36.000 $54.080 $30.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 375.000 $20.000 $22.960 $20.000 $11.000 $5.980 $45.000 $57.010 $91.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 2,301.000 $15.000 $7.480 $10.000 $11.000 $6.080 $22.500 $18.430 $27.500
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 1,223.000 $11.000 $28.160 $15.000 $11.000 $10.020 $30.000 $21.510 $28.000
EXCAV (SPECIAL)
CY 10.000 $45.000 $86.100 $150.000 $165.000 $92.080 $250.000 $227.410 $102.000
EMBANK (FNL)(OC)(TY B)
CY 10.000 $30.000 $86.100 $150.000 $77.000 $119.900 $250.000 $196.740 $191.000
FURN & PLACE TOPSOIL (4")
SY 1,046.000 $5.000 $8.230 $7.000 $2.750 $1.740 $4.250 $9.800 $16.000
BLOCK SODDING
SY 1,046.000 $4.000 $5.500 $6.000 $11.000 $15.070 $10.000 $22.620 $14.000
VEGETATIVE WATERING
TGL 17.000 $8.500 $1.100 $50.000 $165.000 $49.970 $0.100 $256.660 $431.000
IRRIGATION SYSTEM
LS 1.000 $10,000.000 $1.100 $12,500.000 $16,500.000 $35,497.870 $0.100 $38,226.290 $11,694.000
TACK COAT
GAL 40.000 $5.000 $5.500 $10.000 $11.000 $30.650 $5.490 $4.460 $41.000
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
TON 20.000 $250.000 $301.400 $200.000 $550.000 $300.030 $236.670 $470.010 $554.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 100.000 $10.000 $16.500 $15.000 $22.000 $23.720 $5.840 $11.900 $29.000
CUT & RESTORE ASPH PAVING
SY 1,489.000 $175.000 $56.600 $55.000 $110.000 $129.200 $67.160 $137.290 $129.000
CL A CONC (MISC)
CY 10.000 $1,700.000 $855.750 $1,000.000 $550.000 $1,244.530 $1,200.000 $409.560 $740.000
RIPRAP (CONC)(4 IN)
CY 79.000 $600.000 $855.750 $650.000 $660.000 $644.700 $990.000 $479.510 $1,505.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 1.000 $7,400.000 $4,840.000 $7,000.000 $3,520.000 $6,907.060 $5,280.000 $11,930.670 $16,175.000
INLET (COMP)(TY SIDEWALK BRIDGE)
EA 1.000 $15,000.000 $13,333.100 $15,500.000 $12,100.000 $17,267.660 $18,317.200 $24,162.360 $43,136.000
GRATE & FRAME
EA 16.000 $2,000.000 $1,157.200 $1,000.000 $1,320.000 $1,507.000 $1,984.900 $1,770.140 $4,177.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 7.000 $850.000 $615.000 $1,000.000 $1,100.000 $1,097.180 $500.000 $2,515.030 $4,693.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 18.000 $700.000 $239.170 $1,000.000 $385.000 $658.360 $750.000 $1,511.020 $3,018.000
REMOVE STR (BOLLARD)
EA 7.000 $65.000 $123.000 $10.000 $110.000 $822.050 $500.000 $391.630 $3,417.000
MOBILIZATION
LS 1.000 $355,012.800 $74,493.870 $180,000.000 $150,000.000 $154,923.380 $95,159.000 $165,864.620 $340,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $6,500.000 $2,750.000 $3,000.000 $3,300.000 $3,874.870 $3,291.350 $6,318.960 $7,171.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $1.100 $8,500.000 $13,200.000 $7,945.640 $6,500.000 $4,587.160 $41,400.000
TMA (STATIONARY)
DAY 158.000 $200.000 $1.100 $300.000 $385.000 $174.240 $185.000 $276.950 $262.000
SANDBAGS FOR EROSION CONTROL
EA 50.000 $12.000 $0.110 $20.000 $11.000 $16.470 $0.100 $11.030 $29.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $5.000 $0.110 $6.000 $3.850 $3.640 $0.100 $2.870 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $2.000 $0.110 $1.000 $0.880 $1.030 $0.100 $1.330 $1.200
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $6.000 $0.110 $8.000 $8.800 $8.790 $0.100 $4.760 $9.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $2.000 $0.110 $1.000 $2.200 $1.020 $0.100 $0.740 $1.200
CONC CURB (TY II)
LF 969.000 $30.000 $48.290 $45.000 $38.500 $16.480 $51.750 $47.990 $67.000
CONC CURB & GUTTER (TY II)
LF 1,629.000 $40.000 $48.290 $45.000 $27.500 $29.120 $51.750 $58.940 $80.000
DRIVEWAYS (CONC)
SY 3,577.000 $90.000 $114.420 $115.000 $99.000 $129.860 $115.000 $144.630 $160.000
DRIVEWAYS (ACP)
SY 49.000 $60.000 $115.500 $75.000 $27.500 $67.560 $116.000 $270.070 $99.000
CONC SIDEWALKS (4")
SY 4,841.000 $85.000 $95.340 $90.000 $71.500 $80.050 $65.000 $77.070 $141.000
CONC SIDEWALKS (5")
SY 100.000 $95.000 $149.400 $100.000 $82.500 $93.230 $132.250 $97.570 $234.000
CONC SIDEWALK (STEPS)
SY 62.000 $150.000 $312.440 $100.000 $275.000 $575.840 $943.000 $175.640 $769.000
CURB RAMPS (TY 1)
SY 202.000 $165.000 $143.820 $250.000 $440.000 $156.980 $250.350 $400.010 $515.000
CURB RAMPS (TY 2)
SY 23.000 $165.000 $143.820 $250.000 $440.000 $185.860 $708.600 $400.870 $386.000
CURB RAMPS (TY 3)
SY 148.000 $175.000 $143.820 $250.000 $440.000 $198.420 $246.820 $247.910 $286.000
CURB RAMPS (TY 5)
SY 31.000 $180.000 $143.820 $250.000 $440.000 $205.960 $585.570 $248.620 $308.000
CURB RAMPS (TY 7)
SY 240.000 $165.000 $143.820 $250.000 $440.000 $210.980 $385.380 $393.430 $407.000
CURB RAMPS (TY 10)
SY 161.000 $165.000 $143.820 $250.000 $440.000 $221.030 $478.980 $328.090 $368.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 25.000 $600.000 $275.000 $700.000 $770.000 $1,111.410 $1,017.750 $1,073.210 $1,637.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 55.000 $1.000 $1.650 $3.000 $2.560 $5.720 $1.730 $1.910 $4.750
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,334.000 $6.000 $9.350 $7.000 $16.060 $11.990 $9.780 $10.830 $14.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $165.000 $220.000 $250.000 $547.800 $326.930 $230.000 $254.830 $293.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $200.000 $231.000 $250.000 $627.000 $326.930 $241.500 $267.590 $410.000
PAVEMENT SLER 6"
LF 334.000 $1.000 $0.280 $1.000 $0.990 $1.360 $0.290 $0.320 $1.500
PAVEMENT SLER 8"
LF 55.000 $1.000 $0.280 $2.000 $1.250 $2.720 $0.290 $0.320 $2.500
PAVEMENT SLER 24"
LF 3,334.000 $2.000 $1.380 $6.000 $3.850 $5.450 $1.440 $1.590 $4.750
PAVEMENT SLER (ARROW)
EA 1.000 $30.000 $33.000 $65.000 $110.000 $81.730 $34.500 $38.230 $117.000
PAVEMENT SLER (WORD)
EA 1.000 $30.000 $33.000 $65.000 $110.000 $81.730 $34.500 $38.230 $175.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 334.000 $5.000 $1.100 $3.000 $2.060 $3.810 $1.150 $1.270 $3.000
ELIM EXT PM & MRKS (4")
LF 450.000 $1.000 $0.550 $1.000 $1.100 $1.360 $0.580 $0.640 $2.500
ELIM EXT PM & MRKS (24")
LF 4,715.000 $3.000 $2.480 $6.000 $5.060 $5.450 $2.590 $2.870 $4.750
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $35.000 $110.000 $104.000 $110.000 $136.220 $115.000 $127.430 $175.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $35.000 $110.000 $100.000 $165.000 $136.220 $115.000 $127.430 $263.000
PAV SURF PREP FOR MRK (6")
LF 334.000 $1.000 $0.110 $1.000 $0.370 $0.140 $0.120 $0.130 $1.500
PAV SURF PREP FOR MRK (8")
LF 55.000 $1.000 $0.110 $1.000 $0.200 $0.270 $0.120 $0.130 $2.500
PAV SURF PREP FOR MRK (24")
LF 3,334.000 $2.000 $0.550 $1.000 $0.660 $0.680 $0.580 $0.640 $4.500
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $100.000 $11.000 $6.000 $1.320 $6.810 $15.000 $12.740 $175.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $100.000 $11.000 $6.000 $1.320 $6.810 $15.000 $12.740 $263.000
Totals: $2,079,597.300 $1,672,395.440 $1,927,500.000 $1,967,078.050 $1,974,988.760 $1,977,584.190 $2,424,103.410 $3,401,301.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $2,000.00