TOM GREEN VA (0907-00-229)

Items: 131

County: TOM GREEN
Length: N/A
Highway: VA
District: SAN ANGELO
Control Number: 0907-00-229
DBE Goal: 700.0%
Project: F 2B24(130)
Guaranty: N/A
Time: 230 WORKING DAYS
Engineer's Estimate: $3,106,522.90
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
JORDAN SEFCIK
ALFREDO LUERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,106,522.90
1
$2,856,078.70
Over/Under Est: -8.06% -$250,444.20
$3,286,183.58
Over/Under Est: 5.78% $179,660.68
Amt Left: 15.06% $430,104.88
$3,702,576.00
Over/Under Est: 19.19% $596,053.10
Amt Left: 29.64% $846,497.30
Delta: -12.67% -$416,392.42
Subcontractor Percentage Amount
D&G ENERGY CORPORATION 11.92% $370,188.12
CALAME CONTRACTING, LLC 1.65% $51,242.48
DIIBS SPECIALISTS, LLC 1.20% $37,267.26
FIBERTEL, LLC 0.72% $22,360.36
Total: 15.49% $481,058.22

Bid Items & Bid Tabulations

131 Total 0 of 131
TOM GREEN  |  VA  |  SAN ANGELO  |  0907-00-229  |  06/06/2024  |  $3,106,522.90  |  F 2B24(130)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  230 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
TI-ZACK CONCRETE, LLC
FNH CONSTRUCTION, LLC
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 1.000 $250.000 $1,500.000 $3,125.000 $10,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 2.000 $1,800.000 $3,500.000 $4,375.000 $5,000.000
REMOVING CONC (RIPRAP)
SY 130.000 $30.000 $30.000 $61.380 $100.000
REMOVING CONC (MEDIANS)
SY 88.000 $35.000 $30.000 $45.340 $100.000
REMOVING CONC (DRIVEWAYS)
SY 1,496.000 $18.000 $25.000 $30.480 $40.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,621.000 $18.000 $15.000 $9.850 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 119.000 $20.000 $30.000 $67.060 $20.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 1,227.000 $5.000 $20.000 $32.520 $20.000
EXCAVATION (SPECIAL)
CY 15.000 $10.000 $50.000 $106.400 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 15.000 $30.000 $50.000 $106.400 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
CY 125.000 $150.000 $200.000 $127.680 $100.000
BACKFILL TY A
CY 20.000 $200.000 $150.000 $399.000 $450.000
BLOCK SODDING
SY 3,277.000 $8.000 $6.000 $6.250 $10.000
TACK COAT
GAL 40.000 $5.000 $20.000 $6.250 $6.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 500.000 $2.000 $10.000 $15.000 $20.000
CUT & RESTORE ASPH PAVING
SY 488.000 $150.000 $125.000 $106.250 $150.000
FLOWABLE BACKFILL
CY 20.000 $150.000 $250.000 $882.070 $350.000
DRILL SHAFT (36 IN)
LF 120.000 $400.000 $400.000 $500.000 $550.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 33.000 $167.000 $241.875 $300.000 $400.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 26.000 $512.000 $483.750 $593.750 $450.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $531.000 $645.000 $793.750 $750.000
CL A CONC (MISC)
CY 10.000 $400.000 $1,106.000 $882.070 $1,500.000
CL C CONC (ABUT)
CY 13.400 $800.000 $2,324.000 $1,875.000 $1,500.000
CL C CONC (HEADWALL)
CY 2.000 $2,000.000 $7,420.000 $5,000.000 $1,500.000
CL C CONC (WINGWALLS)
CY 7.000 $2,000.000 $2,324.000 $5,000.000 $1,500.000
REINF CONC SLAB
SF 102.000 $100.000 $119.000 $23.780 $100.000
RETAINING WALL (MSE)
SF 1,235.000 $80.000 $205.000 $125.000 $150.000
RIPRAP (CONC)(4 IN)
CY 37.000 $1,000.000 $505.000 $882.070 $550.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 52.000 $120.000 $250.000 $187.500 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 16.500 $550.000 $495.000 $882.070 $550.000
RAIL (HANDRAIL)(TY F)
LF 201.000 $180.000 $195.000 $187.500 $185.000
RAIL (TY PR11)
LF 92.000 $250.000 $185.000 $187.500 $185.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 47.000 $1,500.000 $895.000 $687.500 $1,000.000
INLET (COMP) (TY SIDEWALK BRIDGE)
EA 1.000 $11,500.000 $26,850.000 $12,701.250 $30,000.000
REMOV STR (WINGWALL)
EA 1.000 $2,000.000 $900.000 $3,125.000 $500.000
REMOV STR (PIPE)
LF 20.000 $45.000 $50.000 $312.500 $50.000
MOBILIZATION
LS 1.000 $498,984.150 $250,000.000 $322,956.980 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $8,500.000 $6,500.000 $3,125.000 $8,500.000
SANDBAGS FOR EROSION CONTROL
EA 62.000 $7.000 $10.000 $0.130 $4.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,500.000 $2.000 $6.000 $0.130 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,500.000 $1.000 $2.000 $0.130 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,700.000 $5.000 $8.000 $0.130 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,700.000 $1.000 $2.000 $0.130 $9.000
COLORED TEXTURED CONC (4")
SY 47.000 $120.000 $200.000 $207.950 $150.000
CONC CURB (TY II)
LF 1,454.000 $25.000 $25.000 $59.120 $55.000
CONC CURB & GUTTER (TY II)
LF 465.000 $45.000 $35.000 $59.120 $65.000
CONC CURB (SLOTTED)
LF 46.000 $60.000 $40.000 $59.120 $100.000
DRIVEWAYS (CONC)
SY 3,272.000 $85.000 $90.000 $129.660 $85.000
CONC SIDEWALKS (4")
SY 4,920.000 $100.000 $75.000 $114.060 $70.000
CONC SIDEWALKS (5")
SY 500.000 $115.000 $65.000 $123.920 $80.000
CURB RAMPS (TY 1)
SY 40.000 $165.000 $158.000 $168.680 $300.000
CURB RAMPS (TY 2)
SY 55.000 $150.000 $158.000 $168.680 $300.000
CURB RAMPS (TY 7)
SY 686.000 $150.000 $158.000 $168.680 $300.000
CURB RAMPS (TY 10)
SY 102.000 $165.000 $158.000 $168.680 $300.000
CURB RAMPS (TY 20)
SY 36.000 $165.000 $158.000 $168.680 $300.000
CURB RAMPS (TY 21)
SY 9.000 $300.000 $158.000 $168.680 $300.000
CONCRETE SIDEWALK (STEPS)
SY 92.000 $300.000 $250.000 $173.010 $500.000
CONC MEDIAN
SY 91.000 $55.000 $150.000 $173.010 $250.000
MTL W-BEAM GD FEN (STEEL POST)
LF 812.500 $25.000 $33.325 $38.750 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,100.000 $1,397.500 $1,625.000 $1,850.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 200.000 $2.000 $29.025 $33.750 $50.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $2.000 $2.688 $3.130 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $200.000 $268.750 $312.500 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $235.000 $3,225.000 $3,750.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $1,000.000 $268.750 $312.500 $1,500.000
CONDT (PVC) (SCH 80) (2")
LF 280.000 $30.000 $19.350 $23.750 $20.000
CONDT (PVC) (SCH 80) (3")
LF 260.000 $40.000 $21.500 $26.250 $30.000
CONDT (PVC) (SCH 80) (4")
LF 20.000 $50.000 $26.875 $33.130 $40.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 425.000 $60.000 $64.500 $75.000 $60.000
ELEC CONDR (NO.12) INSULATED
LF 80.000 $4.000 $1.183 $1.500 $3.000
ELEC CONDR (NO.8) BARE
LF 900.000 $3.000 $1.774 $2.250 $3.000
ELEC CONDR (NO.8) INSULATED
LF 1,020.000 $3.000 $1.774 $2.250 $3.000
GROUND BOX TY C (162911)W/APRON
EA 6.000 $2,038.000 $1,397.500 $1,743.750 $1,500.000
REMOVE GROUND BOX
EA 13.000 $702.000 $430.000 $532.500 $50.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $5,000.000 $6,987.500 $8,687.500 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $500.000 $600.000 $687.500 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 36.000 $700.000 $300.000 $687.500 $1,000.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 804.000 $1.000 $2.150 $3.060 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,446.000 $6.000 $2.150 $6.250 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 9.000 $120.000 $537.500 $212.500 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 9.000 $150.000 $537.500 $225.000 $250.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 500.000 $1.000 $2.150 $2.810 $3.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 648.000 $1.000 $2.150 $2.690 $3.000
REFL PAV MRKR TY I-C
EA 79.000 $3.000 $5.375 $6.250 $6.000
REFL PAV MRKR TY II-A-A
EA 38.000 $3.000 $5.375 $6.250 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 911.000 $0.250 $1.075 $0.750 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 391.000 $0.500 $1.075 $0.800 $6.000
ELIM EXT PAV MRK & MRKS (24")
LF 1,403.000 $3.000 $1.075 $1.560 $20.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 5.000 $45.000 $215.000 $60.000 $250.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 5.000 $5.000 $215.000 $68.750 $250.000
PAV SURF PREP FOR MRK (6")
LF 1,148.000 $2.000 $0.500 $0.560 $3.000
PAV SURF PREP FOR MRK (8")
LF 804.000 $2.000 $0.500 $0.600 $6.000
PAV SURF PREP FOR MRK (24")
LF 1,446.000 $2.000 $0.500 $0.630 $20.000
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $5.000 $100.000 $21.250 $250.000
PAV SURF PREP FOR MRK (WORD)
EA 9.000 $5.000 $100.000 $25.000 $250.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $24,631.000 $39,327.500 $48,937.500 $60,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $10,345.000 $8,062.500 $9,812.500 $12,500.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $5,000.000 $11,287.500 $14,000.000 $60,000.000
VEH SIG SEC (12")LED(GRN)
EA 13.000 $277.000 $306.375 $387.500 $350.000
VEH SIG SEC (12")LED(GRN ARW)
EA 5.000 $250.000 $306.375 $387.500 $350.000
VEH SIG SEC (12")LED(YEL)
EA 15.000 $279.000 $306.375 $387.500 $350.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $260.000 $306.375 $387.500 $350.000
VEH SIG SEC (12")LED(RED)
EA 15.000 $280.000 $306.375 $387.500 $350.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $260.000 $306.375 $800.000 $350.000
PED SIG SEC (LED)(COUNTDOWN)
EA 6.000 $546.000 $833.125 $1,037.500 $4,500.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 17.000 $135.000 $155.875 $200.000 $200.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 1.000 $199.000 $220.375 $281.250 $250.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 200.000 $4.000 $2.096 $2.630 $3.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 855.000 $4.000 $2.688 $3.380 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 80.000 $4.000 $3.171 $4.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,130.000 $4.000 $4.139 $5.190 $3.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 520.000 $4.000 $6.719 $8.440 $3.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,160.000 $4.000 $2.526 $3.190 $3.000
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $11,783.000 $13,437.500 $16,843.750 $25,000.000
INS TRF SIG PL AM(S)1 ARM(44')
EA 1.000 $12,966.000 $14,512.500 $18,218.750 $40,000.000
INS TRF SIG PL AM(S)1 ARM(65')
EA 2.000 $13,000.000 $39,775.000 $50,000.000 $60,000.000
PED POLE ASSEMBLY
EA 8.000 $3,000.000 $2,687.500 $3,343.750 $4,500.000
PED DETECT PUSH BUTTON (APS)
EA 10.000 $900.000 $1,048.125 $1,306.250 $1,850.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,686.000 $4,031.250 $5,062.500 $4,500.000
REPLACE OF GROUND BOXES
EA 4.000 $3,000.000 $1,424.375 $1,781.250 $500.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 4.000 $150.000 $209.625 $256.250 $500.000
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
TON 20.000 $500.000 $300.000 $375.000 $1,000.000
PREFAB PED STL TRUSS BRG SPAN (120 FT)
EA 1.000 $360,000.000 $275,000.000 $262,500.000 $400,000.000
INSTALL FTB
LF 175.000 $200.000 $20.000 $37.500 $20.000
REMOVE FTB
LF 175.000 $30.000 $10.000 $18.750 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,500.000 $15,000.000 $1.250 $16,500.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $8,100.000 $10,212.500 $12,750.000 $8,500.000
RELOCATE ITS RADIO
EA 1.000 $3,100.000 $811.625 $1,010.000 $6,500.000
CAT 5 ETHERNET CABLE
LF 60.000 $13.000 $1.505 $1.880 $20.000
TMA (STATIONARY)
DAY 6.000 $162.000 $300.000 $1.250 $250.000
TMA (MOBILE OPERATION)
DAY 8.000 $191.000 $300.000 $1.250 $550.000
Totals: $3,106,522.900 $2,856,078.762 $3,286,183.590 $3,702,576.000