Show Job Controls
Bid Cobra

TOM GREEN VA (0907-00-193)

Items: 69

County: TOM GREEN
Length: N/A
Highway: VA
District: SAN ANGELO
Control Number: 0907-00-193
DBE Goal: N/A
Project: STP 1902(278)
Guaranty: N/A
Time: 444 WORKING DAYS
Engineer's Estimate: $3,234,121.16
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: SIDEWALKS AND CURB RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$3,234,121.16
$4,491,789.50
Over/Under Est: 38.89% $1,257,668.34

Bid Items & Bid Tabulations

69 Total 0 of 69
TOM GREEN  |  VA  |  SAN ANGELO  |  0907-00-193  |  08/07/2019  |  $3,234,121.16  |  STP 1902(278)  |  SIDEWALKS AND CURB RAMPS  |  444 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 3.000 $1,320.000 $2,000.000
PREP ROW (TREE PRUNING)
EA 10.000 $150.000 $2,000.000
REMOVING CONC (PAV)
SY 162.000 $6.500 $20.000
REMOVING CONC (MEDIANS)
SY 168.000 $10.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 3,861.000 $14.000 $17.500
REMOVING CONC (RETAINING WALLS)
SY 15.100 $29.900 $50.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 4,905.000 $9.500 $17.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 1,693.000 $13.000 $20.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 3,024.000 $10.500 $20.000
EXCAVATION (SPECIAL)
CY 500.000 $10.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 100.000 $40.000 $35.000
FURNISHING AND PLACING TOPSOIL
CY 643.700 $30.000 $10.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 13,932.000 $0.360 $1.000
LRA PAV TY-I GR-D
TON 92.000 $113.000 $250.000
CUT & RESTORE ASPH PAVING
SY 220.000 $70.000 $300.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 12.000 $210.000 $265.000
CL A CONC (MISC)
CY 26.700 $750.000 $1,500.000
RETAINING WALL (CAST - IN - PLACE)
SF 2,985.000 $48.000 $85.000
RIPRAP (CONC)(6 IN)
CY 33.200 $550.000 $650.000
RIPRAP (CONC)(FLUME)
CY 6.200 $530.000 $650.000
STR STEEL (MISC NON - BRIDGE)
LB 16,964.000 $6.000 $12.000
RAIL (HANDRAIL)(TY A)
LF 351.000 $175.000 $185.000
RAIL (TY PR11)
LF 91.200 $125.000 $185.000
ADJUSTING MANHOLES
EA 7.000 $725.000 $2,500.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $750.000 $750.000
REMOV STR (DRAINAGE FLUME)
EA 1.000 $550.000 $2,500.000
MOBILIZATION
LS 1.000 $260,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $12,000.000 $8,500.000
SANDBAGS FOR EROSION CONTROL
EA 750.000 $9.500 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,000.000 $2.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,000.000 $0.550 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,000.000 $5.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,000.000 $1.200 $9.000
CONC CURB (TY II)
LF 1,988.000 $18.000 $35.000
CONC CURB & GUTTER (TY II)
LF 995.000 $22.000 $45.000
DRIVEWAYS (CONC)
SY 5,661.000 $75.000 $90.000
DRIVEWAYS (ACP)
SY 226.000 $28.000 $45.000
CONC SIDEWALKS (4")
SY 19,774.000 $55.000 $55.000
CURB RAMPS (TY 1)
SY 376.000 $136.000 $250.000
CURB RAMPS (TY 2)
SY 332.000 $116.000 $250.000
CURB RAMPS (TY 3)
SY 49.000 $104.000 $250.000
CURB RAMPS (TY 6)
SY 130.000 $109.000 $250.000
CURB RAMPS (TY 7)
SY 267.000 $170.000 $250.000
CURB RAMPS (TY 10)
SY 298.000 $150.000 $250.000
CURB RAMPS (TY 20)
SY 75.000 $220.000 $250.000
CURB RAMPS (TY 21)
SY 12.000 $192.000 $250.000
CURB RAMPS (TY 22)
SY 72.000 $180.000 $250.000
CONC MEDIAN
SY 37.000 $52.000 $150.000
CONC DIRECTIONAL ISLAND
SY 148.000 $85.000 $150.000
CONDT (PVC) (SCH 40) (1")
LF 20.000 $9.000 $15.000
GROUND BOX TY C (162911)
EA 2.000 $850.000 $1,000.000
REMOVE GROUND BOX
EA 2.000 $225.000 $250.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 90.000 $480.000 $850.000
REMOVE SM RD SN SUP&AM
EA 3.000 $80.000 $250.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 8,393.000 $7.000 $9.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 39.000 $57.000 $250.000
PAVEMENT SEALER 24"
LF 8,393.000 $1.250 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 110.000 $0.550 $3.000
ELIM EXT PAV MRK & MRKS (8")
LF 8.000 $0.800 $10.000
ELIM EXT PAV MRK & MRKS (24")
LF 1,145.000 $3.500 $10.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 10.000 $45.000 $250.000
PAV SURF PREP FOR MRK (24")
LF 8,393.000 $1.000 $2.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 32.000 $55.000 $150.000
LANDSCAPE AMENITY
EA 1.000 $3,100.000 $20,000.000
TRANSPLANT PLANT MATERIAL
EA 25.000 $850.000 $2,000.000
RETROFIT DET WARN SURF(SURF APP OR CIP)
EA 4.000 $325.000 $2,500.000
PRECAST CONCRETE WHEEL STOPS
EA 77.000 $190.000 $500.000
MOVE AND RESET PRECAST CONC WHEEL STOPS
EA 10.000 $45.000 $250.000
TMA (STATIONARY)
EA 2.000 $22,500.000 $50,000.000
Totals: $3,234,121.160 $4,491,789.500