PREPARING ROW
|
STA
|
751.000
|
$450.000
|
$147.640
|
$156.620
|
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
18.000
|
$275.000
|
$636.110
|
$1,471.690
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
52.000
|
$11.000
|
$57.040
|
$177.290
|
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
9,345.000
|
$5.000
|
$0.710
|
$3.840
|
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
4,074.000
|
$5.000
|
$3.850
|
$7.800
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,251.000
|
$15.000
|
$9.750
|
$5.930
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
28,414.000
|
$13.100
|
$12.500
|
$18.860
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
749.000
|
$150.000
|
$94.000
|
$225.010
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
124,452.000
|
$0.160
|
$0.140
|
$0.220
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
62,226.000
|
$0.250
|
$0.100
|
$0.190
|
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
62,226.000
|
$0.250
|
$0.100
|
$0.190
|
|
|
|
PROOF ROLLING
|
HR
|
52.000
|
$130.000
|
$123.090
|
$147.570
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
6,478.000
|
$50.000
|
$51.270
|
$82.970
|
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
733.000
|
$200.000
|
$220.230
|
$217.480
|
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
34,779.000
|
$5.000
|
$6.360
|
$7.830
|
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
13,595.000
|
$3.300
|
$6.500
|
$6.100
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,344.000
|
$4.000
|
$6.080
|
$4.620
|
|
|
|
ASPH (CRS-2P)
|
GAL
|
88,083.000
|
$4.000
|
$5.160
|
$4.310
|
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
409.000
|
$95.000
|
$223.430
|
$229.810
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
3,511.000
|
$110.000
|
$142.120
|
$151.970
|
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
88,083.000
|
$4.500
|
$5.230
|
$4.850
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
7,733.000
|
$55.000
|
$99.000
|
$74.850
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
5,159.000
|
$1.500
|
$4.960
|
$6.130
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
31,127.000
|
$1.400
|
$2.340
|
$2.950
|
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
8,071.000
|
$1.400
|
$1.750
|
$4.320
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
2,926.000
|
$1.800
|
$2.500
|
$3.250
|
|
|
|
PLANE ASPH CONC PAV (1/2")
|
SY
|
217,429.000
|
$2.000
|
$1.670
|
$0.980
|
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
475.000
|
$30.000
|
$34.620
|
$79.340
|
|
|
|
CEM STABIL BKFL
|
CY
|
121.600
|
$175.000
|
$83.910
|
$207.200
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
56.000
|
$175.000
|
$193.750
|
$207.200
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,623.000
|
$16.000
|
$8.080
|
$16.800
|
|
|
|
CL B CONC (FLUME)
|
CY
|
15.000
|
$540.000
|
$478.310
|
$728.000
|
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
108.000
|
$220.000
|
$235.660
|
$257.600
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
81.300
|
$520.000
|
$496.250
|
$644.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
7.600
|
$140.000
|
$935.540
|
$939.880
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
95.000
|
$520.000
|
$496.260
|
$616.000
|
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
475.000
|
$50.000
|
$22.860
|
$50.400
|
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
744.000
|
$225.000
|
$263.940
|
$392.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
14.000
|
$640.000
|
$717.210
|
$840.000
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
42.000
|
$550.000
|
$768.440
|
$952.000
|
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
60.000
|
$960.000
|
$795.760
|
$1,064.000
|
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
50.000
|
$880.000
|
$911.360
|
$1,092.000
|
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
7.000
|
$1,300.000
|
$881.150
|
$1,120.000
|
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
64.000
|
$1,450.000
|
$1,288.570
|
$2,236.320
|
|
|
|
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
|
LF
|
5.000
|
$1,000.000
|
$1,622.930
|
$1,344.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
16.000
|
$84.000
|
$100.640
|
$179.200
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
14.000
|
$130.000
|
$164.010
|
$224.000
|
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
1.000
|
$3,200.000
|
$6,576.750
|
$6,160.000
|
|
|
|
SET (TY I)(S=10 FT)(HW=11 FT)(3:1)(C)
|
EA
|
8.000
|
$14,200.000
|
$20,735.870
|
$15,120.000
|
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
6.000
|
$9,050.000
|
$8,506.890
|
$7,280.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$6,920.000
|
$9,391.310
|
$7,840.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$7,000.000
|
$6,688.440
|
$8,400.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
7.000
|
$10,400.000
|
$6,918.430
|
$8,120.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
6.000
|
$7,500.000
|
$8,240.300
|
$8,400.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
22.000
|
$12,400.000
|
$9,394.970
|
$9,520.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
5.000
|
$13,500.000
|
$10,315.380
|
$9,520.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
19.000
|
$12,000.000
|
$9,841.080
|
$9,800.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
5.000
|
$12,500.000
|
$10,858.440
|
$9,800.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$8,300.000
|
$9,778.070
|
$10,080.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$13,000.000
|
$11,215.600
|
$12,880.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
|
EA
|
16.000
|
$24,000.000
|
$15,415.310
|
$14,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,600.000
|
$1,666.120
|
$2,240.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,605.620
|
$2,520.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,800.000
|
$2,143.830
|
$2,800.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$1,700.000
|
$2,716.780
|
$2,800.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$2,000.000
|
$2,172.940
|
$3,080.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,900.000
|
$6,339.970
|
$5,040.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
35.000
|
$2,350.000
|
$2,152.390
|
$4,480.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,393,235.000
|
$1,064,799.260
|
$1,128,999.850
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$9,000.000
|
$4,583.890
|
$18,072.110
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,232.000
|
$35.000
|
$28.790
|
$31.470
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,232.000
|
$11.000
|
$9.680
|
$30.850
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
15,083.000
|
$3.600
|
$2.990
|
$3.270
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
15,083.000
|
$0.800
|
$0.590
|
$0.650
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,708.000
|
$8.000
|
$5.910
|
$6.460
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,708.000
|
$1.100
|
$0.590
|
$0.650
|
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,020.000
|
$57.000
|
$13.320
|
$94.160
|
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
2,760.000
|
$11.500
|
$16.050
|
$14.260
|
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,020.000
|
$11.000
|
$13.260
|
$55.780
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,847.000
|
$40.000
|
$56.570
|
$47.930
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,145.000
|
$29.000
|
$45.360
|
$160.700
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
147,230.000
|
$0.300
|
$0.050
|
$0.210
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
69,873.000
|
$0.300
|
$0.080
|
$0.210
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
937.500
|
$37.000
|
$42.880
|
$41.440
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,310.000
|
$3,923.270
|
$3,108.000
|
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
113.000
|
$64.000
|
$110.090
|
$89.600
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,057.000
|
$3.000
|
$3.590
|
$3.920
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$3,300.000
|
$3,587.090
|
$3,920.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$300.000
|
$409.840
|
$392.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
$1,620.000
|
$918.310
|
$1,599.750
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,300.000
|
$918.310
|
$1,599.740
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$11,554.920
|
$12,857.020
|
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
681.000
|
$50.000
|
$101.560
|
$43.230
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$260.000
|
$349.390
|
$296.800
|
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$740.000
|
$565.580
|
$812.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
85.000
|
$900.000
|
$804.300
|
$744.800
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
18.000
|
$750.000
|
$876.020
|
$896.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
11.000
|
$1,530.000
|
$1,214.140
|
$1,265.600
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$820.000
|
$1,343.240
|
$873.600
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
5.000
|
$1,230.000
|
$1,347.340
|
$1,512.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
102.000
|
$150.000
|
$141.770
|
$105.700
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$37.000
|
$51.230
|
$22.400
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
41.000
|
$85.000
|
$53.280
|
$117.600
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
298,980.000
|
$0.400
|
$0.120
|
$0.170
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
298,980.000
|
$0.300
|
$0.160
|
$0.170
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
29,898.000
|
$1.000
|
$1.630
|
$3.360
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
1,507.000
|
$1.000
|
$0.770
|
$0.840
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,281.000
|
$1.000
|
$0.850
|
$1.120
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
835.000
|
$4.400
|
$4.610
|
$10.080
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
345.000
|
$13.000
|
$9.220
|
$14.560
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
46.000
|
$7.000
|
$4.610
|
$22.400
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
7,941.000
|
$0.500
|
$0.400
|
$0.390
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
149,481.000
|
$0.400
|
$0.390
|
$0.380
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
9,030.000
|
$0.500
|
$0.390
|
$0.390
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
100,830.000
|
$0.450
|
$0.380
|
$0.380
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$250.000
|
$271.520
|
$252.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$470.000
|
$727.460
|
$560.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$250.000
|
$348.360
|
$291.200
|
|
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
5.000
|
$540.000
|
$840.160
|
$672.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
6.000
|
$35.000
|
$81.970
|
$56.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
496.000
|
$4.000
|
$6.150
|
$4.480
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,522.000
|
$3.200
|
$4.710
|
$4.480
|
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
1,118.000
|
$75.000
|
$69.670
|
$76.160
|
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
12.000
|
$52.000
|
$102.460
|
$112.000
|
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
264.000
|
$25.000
|
$94.260
|
$103.040
|
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
65,748.000
|
$95.000
|
$130.200
|
$124.240
|
|
|
|
SP MIXES SP-D SAC-B PG70-22 (LEVEL-UP)
|
TON
|
1,456.000
|
$100.000
|
$142.980
|
$172.510
|
|
|
|
TACK COAT
|
GAL
|
21,983.000
|
$3.500
|
$3.180
|
$6.340
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
13.000
|
$400.000
|
$358.730
|
$784.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
101.000
|
$120.000
|
$617.610
|
$80.390
|
|
|
|
TMA (STATIONARY)
|
DAY
|
101.000
|
$180.000
|
$207.470
|
$395.490
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
245.000
|
$67.000
|
$0.000
|
$156.800
|
|
1A
|
|
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
|
LF
|
245.000
|
$67.000
|
$41.850
|
$0.000
|
|
Totals: |
$15,342,002.920
|
$17,420,245.525
|
$18,359,950.398
|