Show Job Controls
Bid Cobra

TOM GREEN US 277 (0264-06-043)

Items: 133

County: TOM GREEN
Length: N/A
Highway: US 277
District: SAN ANGELO
Control Number: 0264-06-043
DBE Goal: N/A
Project: F 2022(457)
Guaranty: N/A
Time: 387 WORKING DAYS
Engineer's Estimate: $15,325,587.92
Date: 04/06/2022 (4 years ago)
Contract Number: N/A
Type: ADD PASSING LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$15,325,587.92
$17,420,245.51
Over/Under Est: 13.67% $2,094,657.59
$18,359,950.39
Over/Under Est: 19.8% $3,034,362.47
Amt Left: 5.39% $939,704.88

Bid Items & Bid Tabulations

133 Total 0 of 133
TOM GREEN  |  US 277  |  SAN ANGELO  |  0264-06-043  |  04/06/2022  |  $15,325,587.92  |  F 2022(457)  |  ADD PASSING LANES  |  387 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
RK HALL, LLC
PREPARING ROW
STA 751.000 $450.000 $147.640 $156.620
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 18.000 $275.000 $636.110 $1,471.690
REMOVING CONC (RIPRAP)
SY 52.000 $11.000 $57.040 $177.290
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 9,345.000 $5.000 $0.710 $3.840
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 4,074.000 $5.000 $3.850 $7.800
EXCAVATION (ROADWAY)
CY 2,251.000 $15.000 $9.750 $5.930
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 28,414.000 $13.100 $12.500 $18.860
BACKFILL (TY A OR B)
STA 749.000 $150.000 $94.000 $225.010
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 124,452.000 $0.160 $0.140 $0.220
DRILL SEEDING (TEMP) (WARM)
SY 62,226.000 $0.250 $0.100 $0.190
DRILL SEEDING (TEMP) (COOL)
SY 62,226.000 $0.250 $0.100 $0.190
PROOF ROLLING
HR 52.000 $130.000 $123.090 $147.570
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,478.000 $50.000 $51.270 $82.970
LIME (HYDRATED LIME (SLURRY))
TON 733.000 $200.000 $220.230 $217.480
LIME TRT (SUBGRADE)(8")
SY 34,779.000 $5.000 $6.360 $7.830
PRIME COAT(MC-30 OR AE-P)
GAL 13,595.000 $3.300 $6.500 $6.100
FOG SEAL (CSS-1H)
GAL 4,344.000 $4.000 $6.080 $4.620
ASPH (CRS-2P)
GAL 88,083.000 $4.000 $5.160 $4.310
AGGR(TY-PB GR-3 SAC-B)
CY 409.000 $95.000 $223.430 $229.810
AGGR(TY-PB GR-4 SAC-B)
CY 3,511.000 $110.000 $142.120 $151.970
ASPH (AC-20-5TR OR AC-20XP)
GAL 88,083.000 $4.500 $5.230 $4.850
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 7,733.000 $55.000 $99.000 $74.850
PLANE ASPH CONC PAV(0" TO 3")
SY 5,159.000 $1.500 $4.960 $6.130
PLANE ASPH CONC PAV (1.5")
SY 31,127.000 $1.400 $2.340 $2.950
PLANE ASPH CONC PAV (1")
SY 8,071.000 $1.400 $1.750 $4.320
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 2,926.000 $1.800 $2.500 $3.250
PLANE ASPH CONC PAV (1/2")
SY 217,429.000 $2.000 $1.670 $0.980
PAV JT UNDERSEAL (24")
LF 475.000 $30.000 $34.620 $79.340
CEM STABIL BKFL
CY 121.600 $175.000 $83.910 $207.200
FLOWABLE BACKFILL
CY 56.000 $175.000 $193.750 $207.200
TEMPORARY SPL SHORING
SF 1,623.000 $16.000 $8.080 $16.800
CL B CONC (FLUME)
CY 15.000 $540.000 $478.310 $728.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 108.000 $220.000 $235.660 $257.600
RIPRAP (CONC)(5 IN)
CY 81.300 $520.000 $496.250 $644.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 7.600 $140.000 $935.540 $939.880
RIPRAP (MOW STRIP)(4 IN)
CY 95.000 $520.000 $496.260 $616.000
CLEANING AND SEALING EXISTING JOINTS
LF 475.000 $50.000 $22.860 $50.400
RETROFIT RAIL (TY T131RC)
LF 744.000 $225.000 $263.940 $392.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 14.000 $640.000 $717.210 $840.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 42.000 $550.000 $768.440 $952.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 60.000 $960.000 $795.760 $1,064.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 50.000 $880.000 $911.360 $1,092.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 7.000 $1,300.000 $881.150 $1,120.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 64.000 $1,450.000 $1,288.570 $2,236.320
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
LF 5.000 $1,000.000 $1,622.930 $1,344.000
RC PIPE (CL III)(24 IN)
LF 16.000 $84.000 $100.640 $179.200
RC PIPE (CL III)(36 IN)
LF 14.000 $130.000 $164.010 $224.000
SET (TY I) (36 IN) (3: 1) (C)
EA 1.000 $3,200.000 $6,576.750 $6,160.000
SET (TY I)(S=10 FT)(HW=11 FT)(3:1)(C)
EA 8.000 $14,200.000 $20,735.870 $15,120.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 6.000 $9,050.000 $8,506.890 $7,280.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $6,920.000 $9,391.310 $7,840.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 1.000 $7,000.000 $6,688.440 $8,400.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 7.000 $10,400.000 $6,918.430 $8,120.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $7,500.000 $8,240.300 $8,400.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 22.000 $12,400.000 $9,394.970 $9,520.000
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
EA 5.000 $13,500.000 $10,315.380 $9,520.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 19.000 $12,000.000 $9,841.080 $9,800.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 5.000 $12,500.000 $10,858.440 $9,800.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $8,300.000 $9,778.070 $10,080.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $13,000.000 $11,215.600 $12,880.000
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
EA 16.000 $24,000.000 $15,415.310 $14,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 26.000 $1,600.000 $1,666.120 $2,240.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,200.000 $1,605.620 $2,520.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,800.000 $2,143.830 $2,800.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,700.000 $2,716.780 $2,800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 5.000 $2,000.000 $2,172.940 $3,080.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $3,900.000 $6,339.970 $5,040.000
CLEAN EXIST CULVERTS
EA 35.000 $2,350.000 $2,152.390 $4,480.000
MOBILIZATION
LS 1.000 $1,393,235.000 $1,064,799.260 $1,128,999.850
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $9,000.000 $4,583.890 $18,072.110
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,232.000 $35.000 $28.790 $31.470
CONSTRUCTION EXITS (REMOVE)
SY 1,232.000 $11.000 $9.680 $30.850
TEMP SEDMT CONT FENCE (INSTALL)
LF 15,083.000 $3.600 $2.990 $3.270
TEMP SEDMT CONT FENCE (REMOVE)
LF 15,083.000 $0.800 $0.590 $0.650
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,708.000 $8.000 $5.910 $6.460
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,708.000 $1.100 $0.590 $0.650
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 1,020.000 $57.000 $13.320 $94.160
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 2,760.000 $11.500 $16.050 $14.260
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 1,020.000 $11.000 $13.260 $55.780
DRIVEWAYS (ACP)
SY 2,847.000 $40.000 $56.570 $47.930
DRIVEWAYS (SURF TREAT)
SY 1,145.000 $29.000 $45.360 $160.700
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 147,230.000 $0.300 $0.050 $0.210
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 69,873.000 $0.300 $0.080 $0.210
MTL W-BEAM GD FEN (STEEL POST)
LF 937.500 $37.000 $42.880 $41.440
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,310.000 $3,923.270 $3,108.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 113.000 $64.000 $110.090 $89.600
REMOVE METAL BEAM GUARD FENCE
LF 1,057.000 $3.000 $3.590 $3.920
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $3,300.000 $3,587.090 $3,920.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $300.000 $409.840 $392.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 12.000 $1,620.000 $918.310 $1,599.750
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,300.000 $918.310 $1,599.740
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $11,554.920 $12,857.020
WIRE FENCE (WATER GAP)
LF 681.000 $50.000 $101.560 $43.230
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $260.000 $349.390 $296.800
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $740.000 $565.580 $812.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 85.000 $900.000 $804.300 $744.800
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $750.000 $876.020 $896.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 11.000 $1,530.000 $1,214.140 $1,265.600
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $820.000 $1,343.240 $873.600
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 5.000 $1,230.000 $1,347.340 $1,512.000
REMOVE SM RD SN SUP&AM
EA 102.000 $150.000 $141.770 $105.700
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $37.000 $51.230 $22.400
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 41.000 $85.000 $53.280 $117.600
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 298,980.000 $0.400 $0.120 $0.170
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 298,980.000 $0.300 $0.160 $0.170
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 29,898.000 $1.000 $1.630 $3.360
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 1,507.000 $1.000 $0.770 $0.840
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 3,281.000 $1.000 $0.850 $1.120
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 835.000 $4.400 $4.610 $10.080
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 345.000 $13.000 $9.220 $14.560
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 46.000 $7.000 $4.610 $22.400
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 7,941.000 $0.500 $0.400 $0.390
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 149,481.000 $0.400 $0.390 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 9,030.000 $0.500 $0.390 $0.390
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 100,830.000 $0.450 $0.380 $0.380
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $250.000 $271.520 $252.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $470.000 $727.460 $560.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $250.000 $348.360 $291.200
PREFAB PAV MRK TY C (W) (RR XING)
EA 5.000 $540.000 $840.160 $672.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 6.000 $35.000 $81.970 $56.000
REFL PAV MRKR TY I-C
EA 496.000 $4.000 $6.150 $4.480
REFL PAV MRKR TY II-A-A
EA 1,522.000 $3.200 $4.710 $4.480
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 1,118.000 $75.000 $69.670 $76.160
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 12.000 $52.000 $102.460 $112.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 264.000 $25.000 $94.260 $103.040
SP MIXES SP-C SAC-B PG70-22
TON 65,748.000 $95.000 $130.200 $124.240
SP MIXES SP-D SAC-B PG70-22 (LEVEL-UP)
TON 1,456.000 $100.000 $142.980 $172.510
TACK COAT
GAL 21,983.000 $3.500 $3.180 $6.340
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 13.000 $400.000 $358.730 $784.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 101.000 $120.000 $617.610 $80.390
TMA (STATIONARY)
DAY 101.000 $180.000 $207.470 $395.490
1
RC PIPE (CL III)(18 IN)
LF 245.000 $67.000 $0.000 $156.800
1A
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
LF 245.000 $67.000 $41.850 $0.000
Totals: $15,342,002.920 $17,420,245.525 $18,359,950.398