TOM GREEN US 67 (0077-06-107)

Items: 91

County: TOM GREEN
Length: 0.0000 MILES
Highway: US 67
District: SAN ANGELO
Control Number: 0077-06-107
DBE Goal: 500.0%
Project: F 2B25(138)
Guaranty: $100,000.00
Time: 219 WORKING DAYS
Engineer's Estimate: $31,358,149.37
Date: 09/04/2025 (9 months ago)
Contract Number: 9253003
Type: PREVENTIVE MAINTENANCE
Project ID: A00196445
Contract Type: Federal
Project Description: 0.75" TOM-C OVERLAY AND LOWER MAINLANES AT BELL STREET BRIDGE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
THOMAS GATLIN
NATHANIEL MOORE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$31,358,149.37
$20,466,166.26
Over/Under Est: -34.73% -$10,891,983.11
$21,641,672.34
Over/Under Est: -30.99% -$9,716,477.03
Amt Left: 5.74% $1,175,506.08
Over/Under Est: -23.52% -$7,375,133.69
Amt Left: 17.18% $3,516,849.42
Delta: -10.82% -$2,341,343.34
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 4.40% $900,511.32
D. I. J. CONSTRUCTION, INC. 3.52% $720,409.05
K. L. DURHAM CONSTRUCTION, L.L.C. 2.28% $466,628.59
HJC FARMS, INC. 1.45% $296,759.41
DIIBS SPECIALISTS, LLC 1.13% $231,267.68
SCR CIVIL CONSTRUCTION, LLC 1.03% $210,801.51
PRIMATE CONSTRUCTION, LP 0.66% $135,076.70
CONTRACTORS SERVICE, LTD. 0.65% $133,030.08
DOUBLE A CONTRACTING, L.P. 0.43% $88,004.51
J. H. ODEN CONTRACTING COMPANY 0.10% $20,466.17
Total: 15.65% $3,202,955.02

Bid Items & Bid Tabulations

91 Total 0 of 91
TOM GREEN  |  US 67  |  SAN ANGELO  |  0077-06-107  |  09/04/2025  |  $31,358,149.37  |  F 2B25(138)  |  PREVENT MAINT  |  219 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
RK HALL, LLC
RAGLE CONSTRUCTION, INC.
REMOV CONC (RIPRAP)
SY 918.000 $64.110 $36.910 $18.850 $9.000
RMV (15"-19") TRT/UNTRT BASE & ASPH PAV
SY 9,922.000 $17.130 $27.900 $10.470 $16.000
EXCAV (CHANNEL)
CY 20,822.470 $88.650 $3.880 $17.140 $1.000
EMBANK (FNL)(OC)(TY B)
CY 1,834.190 $75.910 $65.020 $16.850 $24.000
BACKFILL (TY A OR B)
STA 1,008.000 $384.640 $271.360 $233.220 $250.000
DRILL SEED (PERM_RURAL_CLAY)
SY 19,972.220 $0.250 $0.390 $0.390 $0.350
DRILL SEED (TEMP_WARM)
SY 19,972.220 $0.250 $0.390 $0.390 $0.100
DRILL SEED (TEMP_COOL)
SY 19,972.220 $0.250 $0.390 $0.390 $0.100
PROOF ROLLING
HR 12.940 $155.000 $229.930 $132.560 $170.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 8,413.110 $129.250 $58.570 $73.280 $55.000
PRIME COAT (MC-30)
GAL 59,109.610 $5.550 $4.850 $6.600 $4.750
ASPH (AC-20-5TR OR AC-20XP)
GAL 103,441.810 $4.950 $4.560 $4.930 $4.750
AGGR (TY-PB, GR-4)(SAC-B)
CY 2,552.920 $174.860 $222.200 $251.120 $160.000
SP MIXES SP-C SAC-A PG70-22
TON 35,538.440 $180.000 $139.190 $134.000 $168.250
TACK COAT
GAL 170,048.110 $7.150 $2.410 $3.560 $4.250
TOM-C PG76-22 SAC-A
TON 33,849.750 $189.000 $178.210 $175.550 $195.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 16,590.610 $119.700 $79.000 $64.460 $75.000
PLANE ASPH CONC PAV(0" TO 3")
SY 37,220.990 $16.200 $3.720 $2.390 $2.600
PLANE ASPH CONC PAV(2")
SY 44,839.330 $5.500 $3.490 $3.090 $1.800
PLANE ASPH CONC PAV(3")
SY 148,439.550 $8.750 $4.300 $3.480 $2.950
PLANE ASPH CONC PAV(4")
SY 24,039.440 $15.040 $5.540 $7.270 $4.000
PLANE ASPH CONC PAV(6")
SY 2,926.000 $4.750 $14.360 $15.330 $8.000
PLAN ASPH CONC PAV (0.75")
SY 58,962.880 $3.600 $2.160 $1.860 $1.200
PLANE ASPH CONC PAV (0" TO 0.75")
SY 58,264.670 $11.160 $1.980 $1.080 $1.200
RIPRAP (CONC)(6 IN)
CY 153.000 $662.500 $878.830 $1,100.000 $570.000
RIPRAP (MOW STRIP)(4 IN)
CY 183.300 $703.700 $884.560 $955.970 $630.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 1,972.000 $38.000 $40.400 $41.800 $40.000
CLEAN AND SEAL JNTS (PAN GIRDERS) (CL3)
LF 1,562.000 $69.900 $40.400 $56.100 $53.000
RETROFIT RAIL (TY T222)
LF 4,285.000 $165.000 $218.140 $294.800 $130.000
RC PIPE (CL III)(24 IN)
LF 20.000 $192.700 $321.350 $330.000 $160.000
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(C)
EA 1.000 $7,000.000 $20,938.420 $5,500.000 $14,100.000
CLEAN EXIST CULVERTS
EA 1.000 $4,657.000 $4,094.180 $9,185.620 $4,500.000
REMOV STR (SET)
EA 1.000 $799.900 $1,987.600 $1,100.000 $1,000.000
MOBILIZATION
LS 1.000 $2,950,000.000 $603,302.250 $1,234,191.530 $2,390,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $11,950.620 $42,000.000 $106,800.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 405.000 $4.900 $13.140 $7.700 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 405.000 $1.650 $4.320 $3.300 $1.500
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 3,000.000 $19.440 $12.370 $21.850 $100.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,000.000 $12.950 $11.770 $20.890 $33.000
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 2,740.000 $7.860 $12.400 $6.170 $5.500
MTL W-BEAM GD FEN (STEEL POST)
LF 2,375.000 $39.950 $33.170 $33.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 19.000 $3,850.000 $2,487.820 $3,405.840 $2,250.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 29.000 $1,537.500 $1,492.690 $1,485.000 $1,350.000
CABLE BARRIER SYSTEM (RELOCATE)(TL-4)
LF 3,200.000 $28.200 $14.370 $14.300 $27.500
CABLE BARRIER TERM SEC (RELOC)(TL-4)
EA 1.000 $7,100.000 $3,869.950 $3,850.000 $5,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,400.000 $3,427.670 $3,410.000 $3,100.000
RELOCATE LRSA
EA 1.000 $4,300.000 $3,040.670 $2,750.000 $5,000.000
INS OH SN SUP(25 FT CANT)(CIRC TUBE)
EA 1.000 $96,500.000 $171,383.300 $155,000.000 $77,000.000
INS OH SN SUP(110 FT BRDG)
EA 1.000 $165,000.000 $132,683.850 $120,000.000 $75,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 8.000 $43.540 $93.870 $42.900 $39.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 465.000 $22.230 $34.650 $20.000 $20.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,754.000 $2.150 $1.050 $1.120 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 52,098.000 $2.000 $1.160 $0.940 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 9,381.000 $5.500 $5.750 $3.030 $6.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,356.000 $11.300 $10.390 $6.600 $9.500
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 138.000 $10.600 $11.500 $11.000 $12.500
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 3,770.000 $1.750 $1.220 $1.980 $1.250
RE PM TY II (W) 6" (BRK)
LF 39,400.000 $0.750 $0.310 $0.390 $0.240
RE PM TY II (W) 6" (DOT)
LF 2,754.000 $1.250 $0.630 $0.500 $0.300
RE PM TY II (W) 6" (SLD)
LF 173,971.000 $0.950 $0.290 $0.250 $0.210
RE PM TY II (W) 8" (SLD)
LF 52,098.000 $1.150 $0.630 $0.500 $0.250
RE PM TY II (W) 12" (SLD)
LF 9,321.000 $2.800 $1.660 $0.720 $3.000
RE PM TY II (W) 24" (SLD)
LF 4,356.000 $6.600 $2.650 $1.650 $5.000
RE PM TY II (W) (ARROW)
EA 20.000 $135.000 $71.870 $49.500 $80.000
RE PM TY II (W) (DBL ARROW)
EA 3.000 $75.000 $88.460 $165.000 $125.000
RE PM TY II (W) (UTURN ARROW)
EA 2.000 $75.000 $127.160 $220.000 $150.000
RE PM TY II (W) (WORD)
EA 19.000 $150.000 $88.460 $60.500 $100.000
RE PM TY II (W) (RR XING)
EA 13.000 $333.750 $221.140 $352.000 $300.000
RE PM TY II (W) 36" (YLD TRI)
EA 71.000 $35.000 $15.480 $8.800 $15.000
RE PM TY II (Y) 6" (BRK)
LF 3,780.000 $1.050 $0.320 $0.390 $0.250
RE PM TY II (Y) 6" (SLD)
LF 171,082.000 $0.850 $0.290 $0.250 $0.210
RE PM TY II (Y) 24" (SLD)
LF 138.000 $11.000 $2.650 $5.500 $5.500
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 170,899.000 $1.860 $0.920 $1.050 $1.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 170,582.000 $1.860 $0.920 $1.050 $1.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 39,400.000 $5.250 $0.640 $0.830 $0.810
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 3,072.000 $0.800 $0.620 $1.050 $0.850
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 3,780.000 $2.000 $0.640 $1.050 $0.850
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 500.000 $0.790 $0.620 $1.050 $0.850
PAVEMENT SLER 6"
LF 2,260.000 $0.830 $0.880 $0.550 $1.000
PREFAB PM TY B (W)(ARROW)
EA 20.000 $780.000 $668.950 $825.000 $275.000
PREFAB PM TY B (W)(DBL ARROW)
EA 3.000 $1,082.500 $1,022.770 $1,210.000 $400.000
PREFAB PM TY B (W)(UTURN ARROW)
EA 2.000 $1,082.500 $1,227.330 $1,210.000 $450.000
PREFAB PM TY B (W)(WORD)
EA 19.000 $2,500.000 $984.070 $1,045.000 $350.000
PREFAB PM TY B (W)(RR XING)
EA 13.000 $720.000 $2,056.600 $1,540.000 $650.000
PREFAB PM TY B (W)(36")(YLD TRI)
EA 71.000 $185.000 $55.280 $66.000 $60.000
REFL PAV MRKR TY I-C
EA 242.050 $7.750 $5.920 $5.500 $5.000
REFL PAV MRKR TY II-A-A
EA 435.000 $16.500 $8.290 $5.500 $5.000
REFL PAV MRKR TY II-C-R
EA 4,400.000 $7.800 $5.920 $4.570 $4.500
PAV SURF PREP FOR MRK (6")
LF 2,380.000 $1.250 $0.550 $0.940 $1.000
FULL - WIDTH MOWING
CYC 4.000 $30,000.000 $10,504.140 $12,650.000 $5,000.000
LITTER REMOVAL
CYC 4.000 $25,000.000 $9,398.440 $11,550.000 $4,000.000
Totals: $31,358,149.366 $20,466,166.252 $21,641,672.321 $23,983,015.684
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $7,000.00