Show Job Controls
Bid Cobra

TITUS US0271 (6495-72-001)

Items: 31

County: TITUS
Length: 0.0100 MILES
Highway: US0271
District: ATLANTA
Control Number: 6495-72-001
DBE Goal: 0.0%
Project: RMC - A00218939
Guaranty: $4,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $182,810.00
Date: 03/18/2026 (2 months ago) Changed
Contract Number: 3261907
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218939
Project Description: CALLOUT METAL BEAM GUARD FENCE REPAIR (WEST)TASK #19I18924
Mail/Deliver Bids To: N/A
JASON DUPREE
CHARLOTTE ASLIN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$182,810.00
1
$173,785.00
Over/Under Est: -4.94% -$9,025.00
Over/Under Est: 8.08% $14,780.00
Amt Left: 13.7% $23,805.00

Bid Items & Bid Tabulations

31 Total 0 of 31
TITUS  |  US0271  |  ATLANTA  |  6495-72-001  |  03/18/2026  |  $182,810.00  |  RMC - A00218939  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
AAD CONTRACTING INC.
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 40.000 $140.000 $100.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $640.000 $300.000 $100.000
MOBILIZATION (CALLOUT)
EA 20.000 $550.000 $1.000 $1,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 5.000 $100.000 $1.000 $1.000
TMA (STATIONARY)
DAY 100.000 $250.000 $1.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $29.000 $45.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,390.000 $1,000.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $3.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $175.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,200.000 $4,000.000 $3,900.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $50.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 25.000 $30.000 $10.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $30.000 $10.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 25.000 $25.000 $10.000 $25.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BI)
EA 20.000 $25.000 $10.000 $25.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,000.000 $20.000 $40.000 $16.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 25.000 $46.000 $40.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $65.000 $500.000 $500.000
REPLACE TIMBER POST W/O CONC FND
EA 50.000 $80.000 $70.000 $65.000
REPLACE STEEL POST W/O CONC FND
EA 50.000 $50.000 $10.000 $95.000
REPLACE TIMBER POST W/ CONC FND
EA 50.000 $90.000 $60.000 $65.000
REPLACE STEEL POST W/ CONC FND
EA 50.000 $45.000 $80.000 $95.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $725.000 $1,000.000 $1,800.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 250.000 $32.000 $55.000 $48.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $75.000 $85.000 $90.000
REPLACE BLOCKOUT
EA 50.000 $40.000 $30.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $50.000 $200.000 $1.000
REPLACE SGT OBJECT MARKER
EA 10.000 $34.000 $100.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $87.000 $200.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $175.000 $100.000 $100.000
REPLACE SGT STRUT
EA 10.000 $300.000 $200.000 $1.000
Totals: $182,810.000 $173,785.000 $197,590.000