PREPARING ROW
|
STA
|
177.000
|
$7,500.000
|
$1,200.000
|
$1,715.000
|
$2,000.000
|
$10,000.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
202.000
|
$15.000
|
$20.000
|
$16.000
|
$25.000
|
$35.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
610.000
|
$16.000
|
$20.000
|
$16.000
|
$18.000
|
$25.000
|
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
803.000
|
$8.000
|
$20.000
|
$8.000
|
$10.000
|
$10.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
1,651.000
|
$3.170
|
$10.000
|
$5.000
|
$8.250
|
$12.000
|
|
|
|
REMOVING STAB BASE AND ASPH PAV (5")
|
SY
|
52,277.000
|
$2.750
|
$2.750
|
$4.000
|
$2.350
|
$10.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
120,259.000
|
$10.000
|
$6.000
|
$8.000
|
$17.000
|
$9.000
|
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
247.000
|
$25.000
|
$40.000
|
$20.000
|
$25.000
|
$25.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
22,945.000
|
$22.000
|
$8.000
|
$12.000
|
$24.500
|
$19.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
48,835.000
|
$12.000
|
$4.000
|
$11.500
|
$24.000
|
$16.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
195,177.000
|
$1.500
|
$1.050
|
$1.500
|
$2.250
|
$2.500
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
97,588.000
|
$0.130
|
$0.100
|
$0.110
|
$0.110
|
$0.120
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
97,588.000
|
$0.100
|
$0.100
|
$0.100
|
$0.090
|
$0.100
|
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
195,177.000
|
$0.590
|
$0.580
|
$0.560
|
$0.520
|
$0.560
|
|
|
|
VEGETATIVE WATERING
|
MG
|
6,246.000
|
$12.000
|
$1.000
|
$5.000
|
$0.010
|
$10.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
300.000
|
$2.000
|
$4.000
|
$2.000
|
$1.750
|
$2.000
|
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
84,745.000
|
$13.080
|
$22.830
|
$27.000
|
$23.190
|
$30.000
|
|
|
|
CEMENT
|
TON
|
2,494.000
|
$220.000
|
$235.000
|
$250.000
|
$217.000
|
$255.000
|
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
84,745.000
|
$3.000
|
$3.000
|
$2.500
|
$3.000
|
$3.000
|
|
|
|
CEMENT TREAT (SUBGRADE)(10")
|
SY
|
84,319.000
|
$5.000
|
$3.000
|
$2.500
|
$3.000
|
$3.000
|
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
29,649.000
|
$10.000
|
$6.000
|
$5.000
|
$6.210
|
$6.500
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
96,112.000
|
$4.000
|
$6.000
|
$4.750
|
$5.040
|
$5.250
|
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
760.000
|
$142.000
|
$110.000
|
$140.000
|
$104.000
|
$147.000
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
765.000
|
$130.000
|
$165.000
|
$200.000
|
$156.000
|
$195.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,213.000
|
$2.000
|
$8.000
|
$5.000
|
$4.250
|
$5.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
1,209.000
|
$125.000
|
$180.000
|
$250.000
|
$300.000
|
$270.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
202.000
|
$106.500
|
$100.000
|
$100.000
|
$200.000
|
$220.000
|
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
116.000
|
$100.000
|
$180.000
|
$275.000
|
$300.000
|
$270.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
770.000
|
$10.000
|
$10.000
|
$25.000
|
$15.000
|
$10.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
230.000
|
$200.000
|
$205.000
|
$225.000
|
$205.000
|
$225.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
430.000
|
$475.000
|
$600.000
|
$640.000
|
$525.000
|
$500.000
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
8.000
|
$460.000
|
$600.000
|
$650.000
|
$650.000
|
$1,000.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
155.000
|
$140.000
|
$200.000
|
$180.000
|
$198.530
|
$200.000
|
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
474.000
|
$1,100.000
|
$1,200.000
|
$800.000
|
$750.000
|
$1,200.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,161.000
|
$60.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
7.000
|
$380.000
|
$500.000
|
$450.000
|
$554.960
|
$1,000.000
|
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
763.000
|
$90.000
|
$65.000
|
$85.000
|
$59.350
|
$80.000
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$7,000.000
|
$7,000.000
|
$6,500.000
|
$7,650.000
|
$9,000.000
|
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
3.000
|
$6,000.000
|
$6,500.000
|
$6,500.000
|
$6,690.000
|
$8,800.000
|
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
4.000
|
$6,500.000
|
$8,000.000
|
$7,500.000
|
$7,415.000
|
$10,000.000
|
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
5.000
|
$6,500.000
|
$8,000.000
|
$7,500.000
|
$7,288.000
|
$10,000.000
|
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$7,300.000
|
$8,500.000
|
$8,500.000
|
$6,282.000
|
$11,000.000
|
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
2.000
|
$20,000.000
|
$22,000.000
|
$42,000.000
|
$20,000.000
|
$32,000.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
98.000
|
$920.000
|
$650.000
|
$875.000
|
$768.000
|
$1,000.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
32.000
|
$1,657.420
|
$1,050.000
|
$1,400.000
|
$1,280.000
|
$1,400.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$1,050.000
|
$1,350.000
|
$1,280.000
|
$3,000.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,350.000
|
$1,050.000
|
$1,350.000
|
$1,180.000
|
$1,500.000
|
|
|
|
SET (TY II) (60 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$19,000.000
|
$12,500.000
|
$13,500.000
|
$14,932.000
|
$14,500.000
|
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
2.000
|
$6,000.000
|
$10,000.000
|
$3,000.000
|
$5,000.000
|
$15,000.000
|
|
|
|
REMOV STR (SET)
|
EA
|
36.000
|
$400.000
|
$150.000
|
$300.000
|
$250.000
|
$550.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$900.000
|
$5,000.000
|
$1,500.000
|
$4,000.000
|
$3,200.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,513.000
|
$20.000
|
$5.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
8.000
|
$500.000
|
$200.000
|
$500.000
|
$1,000.000
|
$3,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,500,000.000
|
$500,000.000
|
$900,000.000
|
$610,000.000
|
$1,400,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$8,500.000
|
$1,100.000
|
$4,000.000
|
$2,424.680
|
$5,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,786.000
|
$34.000
|
$32.000
|
$36.000
|
$32.500
|
$35.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
500.000
|
$60.000
|
$47.000
|
$50.000
|
$45.500
|
$50.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,286.000
|
$10.000
|
$10.000
|
$7.000
|
$9.100
|
$10.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
666.000
|
$22.000
|
$28.000
|
$30.000
|
$15.000
|
$100.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
666.000
|
$9.750
|
$5.000
|
$5.000
|
$6.000
|
$11.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
30,460.000
|
$3.250
|
$3.300
|
$3.300
|
$2.970
|
$3.300
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
30,460.000
|
$0.850
|
$0.100
|
$0.700
|
$0.710
|
$0.800
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,135.000
|
$6.000
|
$5.000
|
$6.600
|
$6.100
|
$6.600
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,135.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,865.000
|
$85.000
|
$67.000
|
$90.000
|
$93.100
|
$110.000
|
|
|
|
CONC CURB (TY II)
|
LF
|
1,214.000
|
$10.000
|
$25.000
|
$25.000
|
$55.000
|
$20.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,002.000
|
$25.000
|
$32.000
|
$38.000
|
$50.000
|
$45.000
|
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
4,096.000
|
$55.000
|
$50.000
|
$67.000
|
$59.930
|
$92.000
|
|
|
|
DRIVEWAYS (CONC)(TYPE 1)
|
SY
|
1,546.000
|
$83.000
|
$88.000
|
$112.000
|
$115.000
|
$100.000
|
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,519.000
|
$55.000
|
$70.000
|
$90.000
|
$58.930
|
$120.000
|
|
|
|
DRIVEWAYS (CONC)(TYPE 2)
|
SY
|
214.000
|
$115.000
|
$121.000
|
$125.000
|
$135.000
|
$120.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
6,630.000
|
$1.500
|
$1.540
|
$1.000
|
$0.670
|
$2.000
|
|
|
|
CONC MEDIAN
|
SY
|
202.000
|
$100.000
|
$100.000
|
$65.000
|
$145.000
|
$90.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
290.000
|
$2.500
|
$3.000
|
$3.000
|
$3.000
|
$10.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$260.000
|
$100.000
|
$250.000
|
$325.000
|
$500.000
|
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
27.000
|
$430.000
|
$100.000
|
$150.000
|
$116.000
|
$130.000
|
|
|
|
IN RD IL (TY AL) 50T-10 (400W EQ) LED
|
EA
|
23.000
|
$4,600.000
|
$5,810.000
|
$6,400.000
|
$5,810.000
|
$6,400.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,920.000
|
$15.000
|
$7.000
|
$7.700
|
$7.000
|
$7.700
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
715.000
|
$25.000
|
$21.000
|
$23.000
|
$21.000
|
$28.000
|
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
15.000
|
$25.000
|
$15.000
|
$16.500
|
$15.000
|
$16.500
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
120.000
|
$20.000
|
$22.000
|
$24.000
|
$22.000
|
$24.500
|
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
95.000
|
$42.000
|
$35.000
|
$38.500
|
$35.000
|
$38.500
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
430.000
|
$1.900
|
$2.000
|
$2.200
|
$2.000
|
$2.200
|
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
7,930.000
|
$2.250
|
$1.600
|
$1.750
|
$1.600
|
$1.800
|
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
10,345.000
|
$2.200
|
$2.100
|
$2.300
|
$2.100
|
$2.500
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$1,000.000
|
$750.000
|
$825.000
|
$750.000
|
$825.000
|
|
|
|
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$6,000.000
|
$6,600.000
|
$6,000.000
|
$6,600.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
4.000
|
$800.000
|
$1,075.000
|
$825.000
|
$751.000
|
$825.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$850.000
|
$1,225.000
|
$1,000.000
|
$910.000
|
$1,000.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$950.000
|
$1,205.000
|
$975.000
|
$891.000
|
$980.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$900.000
|
$1,365.000
|
$1,125.000
|
$1,029.000
|
$1,130.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$1,800.000
|
$1,335.000
|
$1,215.000
|
$1,335.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
38.000
|
$465.000
|
$575.000
|
$450.000
|
$410.000
|
$450.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
47.000
|
$100.000
|
$146.000
|
$100.000
|
$94.000
|
$105.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
15.000
|
$25.000
|
$10.000
|
$20.000
|
$40.000
|
$35.000
|
|
|
|
INSTL OM ASSM (OM-1)(WFLX)GND
|
EA
|
12.000
|
$106.500
|
$295.000
|
$250.000
|
$224.000
|
$245.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
40,892.000
|
$0.550
|
$0.250
|
$0.270
|
$0.320
|
$0.300
|
|
|
|
WK ZN PV MK NON-REM (Y)(4")SLD W/MRKR
|
LF
|
37,171.000
|
$0.600
|
$1.000
|
$1.100
|
$0.480
|
$1.100
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
271.000
|
$12.000
|
$15.000
|
$16.500
|
$15.000
|
$17.000
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
45.000
|
$220.000
|
$220.000
|
$245.000
|
$255.000
|
$245.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$400.000
|
$375.000
|
$415.000
|
$475.000
|
$415.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
17.000
|
$250.000
|
$250.000
|
$275.000
|
$335.000
|
$275.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
7.000
|
$50.000
|
$125.000
|
$135.000
|
$75.000
|
$140.000
|
|
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
1,341.000
|
$12.000
|
$15.000
|
$16.500
|
$15.000
|
$17.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
297.000
|
$4.000
|
$4.000
|
$4.400
|
$5.000
|
$5.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,534.000
|
$3.750
|
$3.500
|
$3.850
|
$5.000
|
$4.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
10.000
|
$4.000
|
$10.000
|
$11.000
|
$5.000
|
$11.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
52,261.000
|
$0.550
|
$0.650
|
$0.710
|
$0.510
|
$0.700
|
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,750.000
|
$2,500.000
|
$2,750.000
|
$2,500.000
|
$2,800.000
|
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
760.000
|
$3.000
|
$4.000
|
$4.400
|
$4.000
|
$4.500
|
|
|
|
REMOVAL OF CABLES
|
LF
|
1,265.000
|
$1.500
|
$1.000
|
$1.100
|
$1.000
|
$1.100
|
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
12,774.000
|
$120.000
|
$155.000
|
$160.000
|
$164.200
|
$160.000
|
|
|
|
TACK COAT
|
GAL
|
11,480.000
|
$3.000
|
$8.150
|
$4.500
|
$8.250
|
$4.500
|
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
223.000
|
$60.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
1,114.000
|
$50.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$15,000.000
|
$20,000.000
|
$8,000.000
|
$19,000.000
|
|
|
|
GROUND BOX (PREPARE)
|
EA
|
2.000
|
$1,000.000
|
$100.000
|
$110.000
|
$100.000
|
$1,000.000
|
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
7,361.000
|
$3.500
|
$6.500
|
$7.150
|
$4.200
|
$7.500
|
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
37,723.000
|
$0.600
|
$0.750
|
$0.820
|
$0.550
|
$0.900
|
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
2,899.000
|
$0.700
|
$1.000
|
$1.100
|
$0.680
|
$1.100
|
|
|
|
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
|
LF
|
125.000
|
$1.000
|
$1.000
|
$1.100
|
$1.250
|
$1.100
|
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
45,386.000
|
$0.600
|
$0.750
|
$0.820
|
$0.550
|
$0.850
|
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
4,379.000
|
$0.700
|
$1.000
|
$1.100
|
$0.680
|
$1.100
|
|
|
|
REFL PAV MARK AWT (W) 8" (SLD) (100 MIL
|
LF
|
2,274.000
|
$1.000
|
$1.000
|
$1.100
|
$1.400
|
$1.100
|
|
|
|
REFL PAV MRK AWT (W) 8" (DOT) (100MIL)
|
LF
|
577.000
|
$3.000
|
$1.000
|
$1.100
|
$3.750
|
$1.100
|
|
|
|
TMA (STATIONARY)
|
DAY
|
276.000
|
$180.000
|
$50.000
|
$125.000
|
$150.000
|
$250.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,114.000
|
$50.000
|
$45.000
|
$62.000
|
$45.570
|
$60.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,384.000
|
$60.000
|
$65.000
|
$82.000
|
$70.280
|
$80.000
|
|
Totals: |
$14,480,235.380
|
$11,920,527.810
|
$13,974,574.980
|
$15,215,717.790
|
$18,059,318.080
|