Show Job Controls
Bid Cobra

TITUS IH 30 (0610-03-095)

Items: 138

County: TITUS
Length: 0.3900 MILES
Highway: IH 30
District: ATLANTA
Control Number: 0610-03-095
DBE Goal: 0.0%
Project: F 2026(597)
Guaranty: $100,000.00
Time: 320 WORKING DAYS
Engineer's Estimate: $11,312,219.23
Date: 05/07/2026 (4 weeks ago)
Contract Number: 5263208
Type: TRANSPORTATION NON-ROADWAY
Project ID: A00130461
Contract Type: Federal
Project Description: RECONSTRUCT WEIGH STATION AREA INCLUDING ENTRANCE AND EXIT RAMPS AND ACCOMMODATE TRUCK PARKING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
WENDY STARKES
OSCAR FLORES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$11,312,219.23
$9,498,728.51
Over/Under Est: -16.03% -$1,813,490.72
Over/Under Est: -6.71% -$758,794.05
Amt Left: 11.1% $1,054,696.67
Over/Under Est: -6.1% -$689,854.63
Amt Left: 11.83% $1,123,636.09
Delta: -0.65% -$68,939.42
$11,081,706.95
Over/Under Est: -2.04% -$230,512.28
Amt Left: 16.67% $1,582,978.44
Delta: -4.32% -$459,342.35
Over/Under Est: -0.18% -$20,518.63
Amt Left: 18.88% $1,792,972.09
Delta: -1.89% -$209,993.65
$12,337,808.79
Over/Under Est: 9.07% $1,025,589.56
Amt Left: 29.89% $2,839,080.28
Delta: -9.26% -$1,046,108.19

Bid Items & Bid Tabulations

138 Total 0 of 138
TITUS  |  IH 30  |  ATLANTA  |  0610-03-095  |  05/07/2026  |  $11,312,219.23  |  F 2026(597)  |  TRANSPORT NON-ROADWAY  |  320 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EAST TEXAS BRIDGE, INC.
BAKER & COMPANY CONSTRUCTION, LLC
LONGVIEW BRIDGE AND ROAD, LTD.
CDM HOLDINGS
R CONSTRUCTION CIVIL, LLC
DRAKE COMPANIES LLC
PREPARING ROW
STA 68.400 $1,500.000 $1,500.000 $1,050.000 $5,000.000 $1,100.000 $2,500.000 $2,000.000
REMOV CONC (MOWSTRIP)
LF 485.000 $25.000 $10.000 $23.600 $25.000 $23.500 $6.000 $10.000
REMOV CONC (TRAFFIC BARRIER)
LF 165.000 $30.000 $15.000 $46.250 $37.000 $15.000 $61.000 $25.000
EXCAV (ROADWAY)
CY 31,343.000 $12.000 $10.000 $7.400 $10.500 $7.600 $23.000 $13.000
EXCAV (CHANNEL)
CY 358.000 $20.000 $12.000 $10.650 $8.000 $15.900 $30.000 $25.000
EMBANK (FNL)(DC)(TY A)
CY 22,669.000 $20.000 $15.000 $6.150 $16.250 $26.250 $23.000 $17.000
BROADCAST SEED (TEMP_WARM)
SY 41,221.000 $0.400 $0.120 $0.200 $0.250 $0.110 $0.150 $0.120
BROADCAST SEED (TEMP_COOL)
SY 41,221.000 $0.400 $0.120 $0.200 $0.150 $0.110 $0.150 $0.120
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 82,438.000 $0.350 $0.540 $0.750 $0.150 $0.500 $0.200 $0.540
VEGETATIVE WATERING
TGL 1,970.500 $26.000 $6.000 $5.000 $16.000 $1.000 $200.000 $8.750
CEMENT
TON 624.000 $220.000 $255.000 $252.000 $300.000 $287.500 $200.000 $273.000
CEMENT TRT (EXIST MATL)(8")
SY 41,359.000 $4.000 $3.000 $4.850 $2.600 $4.400 $5.250 $3.500
PRIME COAT (MC-30)
GAL 10,342.000 $6.000 $5.500 $8.400 $6.400 $4.550 $10.000 $6.000
SP MIXES SP-C PG70-22
TON 3,656.000 $150.000 $148.000 $147.000 $143.000 $145.000 $167.000 $154.000
SP MIXES SP-C SAC-A PG76-22
TON 1,165.000 $150.000 $153.000 $148.000 $148.000 $145.000 $164.000 $166.000
SP MIXES SP-D PG70-22
TON 7,441.000 $170.000 $148.000 $151.000 $144.000 $146.500 $165.000 $164.000
TACK COAT
GAL 6,337.000 $3.000 $5.000 $6.300 $4.900 $7.150 $6.500 $5.000
PLANE ASPH CONC PAV(3")
SY 4,580.000 $6.000 $4.500 $3.650 $6.800 $5.000 $3.000 $5.250
CONC PVMT (CPCD) (11")
SY 31,948.000 $95.000 $82.000 $113.300 $105.000 $103.000 $96.000 $132.000
CEM STABIL BKFL
CY 20.000 $250.000 $275.000 $240.000 $220.000 $300.000 $88.000 $260.000
FLOWABLE BACKFILL
CY 3.000 $550.000 $300.000 $470.000 $410.000 $325.000 $1,100.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 1,031.000 $10.000 $10.000 $4.000 $10.000 $9.000 $15.000 $13.750
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 96.000 $800.000 $1,065.000 $580.000 $1,100.000 $1,020.000 $1,050.000 $1,100.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 210.000 $300.000 $285.000 $245.000 $290.000 $275.000 $280.000 $295.000
CL A CONC (MISC)
CY 50.000 $640.000 $250.000 $710.000 $515.000 $600.000 $785.000 $665.000
CL C CONC (COLLAR)
EA 4.000 $2,000.000 $1,000.000 $1,575.000 $950.000 $2,750.000 $1,900.000 $1,950.000
CL C CONC (MISC)
CY 27.000 $2,000.000 $650.000 $815.000 $1,690.000 $750.000 $1,200.000 $700.000
RIPRAP (CONC)(4 IN)
CY 554.000 $575.000 $500.000 $945.000 $505.000 $585.000 $455.000 $660.000
RIPRAP (MOW STRIP)(4 IN)
CY 60.000 $678.000 $515.000 $815.000 $510.000 $650.000 $475.000 $630.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 54.000 $250.000 $195.000 $215.000 $225.000 $220.000 $185.000 $221.650
RAIL (HANDRAIL)(TY F)
LF 459.000 $200.000 $155.000 $124.000 $165.000 $210.000 $220.000 $220.000
RC PIPE (CL III)(18 IN)
LF 94.000 $70.000 $60.000 $73.000 $61.000 $56.000 $122.000 $61.000
RC PIPE (CL III)(24 IN)
LF 77.000 $100.000 $90.000 $100.000 $86.000 $78.000 $211.000 $86.000
RC PIPE (CL III)(36 IN)
LF 734.000 $150.000 $155.000 $132.000 $136.000 $142.000 $197.000 $132.000
RC PIPE (CL III)(42 IN)
LF 292.000 $250.000 $200.000 $172.000 $190.000 $175.000 $267.000 $166.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 3.000 $12,000.000 $11,000.000 $9,700.000 $9,100.000 $9,142.500 $7,100.000 $10,250.000
INLET (COMPL)(PCO)(5FT)(BOTH)
EA 1.000 $15,000.000 $11,500.000 $9,700.000 $9,800.000 $9,734.750 $6,850.000 $10,930.000
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $7,000.000 $7,000.000 $6,110.000 $5,800.000 $8,567.500 $4,000.000 $7,000.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-3FTX3FT)
EA 2.000 $11,500.000 $9,000.000 $7,305.000 $6,550.000 $9,717.500 $5,400.000 $8,300.000
SET (PIPE RUNNER ASSEMBLY)
EA 1.000 $10,000.000 $1,500.000 $7,150.000 $4,750.000 $1,500.000 $4,900.000 $7,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $900.000 $1,550.000 $1,250.000 $1,023.500 $2,700.000 $1,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,700.000 $1,325.000 $1,945.000 $1,700.000 $1,403.000 $2,900.000 $2,270.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $8,080.000 $3,850.000 $4,950.000 $3,950.000 $3,823.750 $5,300.000 $3,950.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 1.000 $10,200.000 $7,650.000 $8,166.000 $7,500.000 $7,000.000 $8,700.000 $7,500.000
GRATE & FRAME
EA 90.000 $1,000.000 $1,250.000 $1,050.000 $1,560.000 $1,606.550 $1,700.000 $2,000.000
PIPE (PVC) (SCH 80) (6 IN)
LF 600.000 $100.000 $50.000 $18.500 $30.000 $31.000 $80.000 $40.000
REMOV STR (SET)
EA 2.000 $600.000 $300.000 $954.000 $465.000 $250.000 $575.000 $275.000
REMOV STR (HEADWALL)
EA 8.000 $1,800.000 $350.000 $954.000 $930.000 $750.000 $1,300.000 $500.000
REMOV STR (PIPE)
LF 102.000 $30.000 $15.000 $38.000 $36.500 $25.000 $92.000 $20.000
MOBILIZATION
LS 1.000 $1,042,000.000 $525,000.000 $630,000.000 $1,000,000.000 $1,000,000.000 $300,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $2,500.000 $5,300.000 $1,925.000 $2,500.000 $6,800.000 $6,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,000.000 $17,000.000 $12,000.000 $22,758.750 $16,500.000 $19,250.000
TMA (STATIONARY)
DAY 15.000 $200.000 $300.000 $471.000 $330.000 $241.250 $225.000 $265.000
TMA (MOBILE OPERATION)
DAY 15.000 $150.000 $300.000 $753.000 $465.000 $143.750 $1,850.000 $360.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 315.000 $50.000 $42.000 $61.000 $35.000 $40.000 $75.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 315.000 $15.000 $10.000 $5.000 $11.000 $10.200 $11.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $30.000 $35.000 $31.000 $51.000 $38.000 $49.000 $36.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $9.000 $12.000 $14.500 $11.000 $15.000 $11.000 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,040.000 $7.000 $4.300 $3.700 $5.500 $4.000 $5.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,040.000 $4.000 $1.000 $1.050 $0.700 $1.250 $0.650 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 403.000 $8.000 $5.500 $8.400 $5.500 $5.100 $5.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 403.000 $4.000 $1.000 $2.100 $0.700 $1.250 $0.650 $2.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 5,310.000 $85.000 $82.000 $59.000 $32.000 $57.500 $95.000 $94.500
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,600.000 $15.000 $6.000 $11.500 $7.000 $11.250 $5.250 $7.500
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 5,310.000 $20.000 $10.000 $38.000 $9.000 $36.750 $6.000 $11.000
CONC CURB (TY II)
LF 2,397.000 $40.000 $8.000 $4.200 $8.250 $7.250 $7.000 $10.000
CONC CURB & GUTTER (ARMOR CURB)
LF 100.000 $500.000 $550.000 $281.000 $375.000 $585.000 $485.000 $300.000
CONC SIDEWALKS (4")
SY 1,542.000 $75.000 $70.000 $100.000 $62.000 $137.700 $73.000 $73.200
CURB RAMPS (TY 1)
EA 1.000 $2,200.000 $2,500.000 $4,725.000 $2,600.000 $2,281.500 $1,900.000 $1,920.000
CURB RAMPS (TY 2)
EA 5.000 $2,200.000 $2,500.000 $4,200.000 $2,600.000 $2,281.500 $1,900.000 $1,700.000
CURB RAMPS (TY 10)
EA 1.000 $2,200.000 $2,500.000 $6,825.000 $2,500.000 $2,223.000 $1,900.000 $1,920.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $30.000 $24.000 $25.000 $24.750 $24.000 $25.000 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,600.000 $1,750.000 $1,600.000 $1,760.000 $2,400.000 $1,700.000 $1,675.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,250.000 $1,400.000 $1,340.000 $1,430.000 $1,750.000 $1,400.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 425.000 $10.000 $2.150 $2.100 $2.200 $2.500 $2.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $443.680 $215.000 $210.000 $220.000 $225.000 $215.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $250.000 $160.000 $210.000 $165.000 $225.000 $160.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $4,315.000 $3,300.000 $3,255.000 $3,400.000 $3,475.000 $3,300.000 $3,410.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,500.000 $2,150.000 $2,625.000 $2,200.000 $2,550.000 $2,200.000 $1,375.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $535.000 $1,575.000 $550.000 $1,530.000 $530.000 $880.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $13,200.000 $9,500.000 $10,500.000 $9,500.000 $10,200.000 $9,200.000 $9,020.000
PIPE UNDERDRAINS (TY 8) (6")
LF 2,585.000 $60.000 $42.000 $29.500 $31.000 $53.500 $35.000 $38.500
REMOVE RD IL ASM (TRANS-BASE)
EA 21.000 $800.000 $800.000 $910.000 $825.000 $765.000 $840.000 $830.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 21.000 $5,000.000 $6,300.000 $5,885.000 $6,500.000 $6,015.000 $6,600.000 $6,500.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 3.000 $50,000.000 $61,000.000 $46,050.000 $62,700.000 $58,500.000 $63,000.000 $63,000.000
LED HI MST IL ASM (6 FIXT) (TY A)
EA 3.000 $35,000.000 $50,000.000 $43,075.000 $51,500.000 $47,685.000 $52,000.000 $51,500.000
CONDT (PVC) (SCH 80) (2")
LF 14,153.000 $14.800 $8.850 $8.100 $9.000 $8.450 $9.000 $9.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 204.000 $27.000 $20.600 $40.000 $21.000 $19.650 $23.000 $22.000
ELEC CONDR (NO.8) INSULATED
LF 13,926.000 $2.250 $2.650 $2.200 $2.700 $2.500 $3.000 $3.000
ELEC CONDR (NO.6) BARE
LF 11,133.000 $2.800 $2.900 $2.200 $3.000 $2.750 $3.000 $3.000
GROUND BOX TY A (122311)
EA 6.000 $1,100.000 $1,140.000 $1,015.000 $1,170.000 $1,090.000 $1,200.000 $1,175.000
GROUND BOX TY A (122311)W/APRON
EA 29.000 $1,500.000 $1,400.000 $735.000 $1,430.000 $1,330.000 $1,450.000 $1,450.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,700.000 $1,625.000 $1,092.000 $1,675.000 $1,555.000 $1,700.000 $1,675.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,000.000 $800.000 $910.000 $820.000 $780.000 $800.000 $1,000.000
ELC SRV TY A 120/240 060(NS)SS(E)TP(O)
EA 1.000 $8,500.000 $6,550.000 $8,870.000 $6,750.000 $6,250.000 $6,500.000 $6,750.000
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
EA 2.000 $11,000.000 $7,075.000 $9,970.000 $7,300.000 $6,750.000 $7,000.000 $7,300.000
ALUMINUM SIGNS (TY G)
SF 245.000 $50.000 $43.000 $36.500 $44.000 $41.000 $40.000 $44.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $850.000 $765.000 $690.000 $785.000 $675.000 $825.000 $785.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $950.000 $1,100.000 $815.000 $1,140.000 $800.000 $1,250.000 $1,150.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $1,410.000 $1,360.000 $1,450.000 $1,325.000 $1,700.000 $1,500.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,500.000 $2,000.000 $2,370.000 $2,040.000 $2,300.000 $2,800.000 $2,050.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 4.000 $1,000.000 $660.000 $625.000 $675.000 $625.000 $650.000 $675.000
REMOVE SM RD SN SUP&AM
EA 1.000 $175.000 $100.000 $83.000 $132.000 $85.000 $125.000 $130.000
REMOVE LRSA
EA 3.000 $1,935.000 $730.000 $820.000 $750.000 $695.000 $800.000 $750.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 34.000 $50.000 $110.000 $79.000 $110.000 $76.500 $100.000 $183.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $42.000 $50.000 $58.000 $50.000 $60.000 $60.000 $35.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 10,882.000 $3.000 $1.900 $1.850 $1.950 $1.800 $1.750 $1.100
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 533.000 $2.000 $2.150 $2.100 $2.200 $2.050 $2.000 $2.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,132.000 $1.000 $1.300 $1.300 $1.350 $1.250 $1.250 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 749.000 $4.000 $4.300 $4.200 $4.400 $4.100 $4.000 $2.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,623.000 $8.000 $6.450 $6.300 $6.600 $6.150 $6.000 $6.600
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
EA 6.000 $300.000 $535.000 $525.000 $550.000 $510.000 $500.000 $550.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 10,112.000 $1.350 $2.700 $2.650 $2.750 $2.550 $2.500 $1.100
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 2,316.000 $1.350 $1.070 $1.050 $1.100 $1.050 $1.000 $2.200
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 4,248.000 $1.350 $1.070 $1.050 $1.100 $1.050 $1.000 $1.100
PAVEMENT SLER 6"
LF 14,518.000 $0.500 $0.540 $0.550 $0.550 $0.510 $0.500 $1.100
PAVEMENT SLER 8"
LF 4,089.000 $0.600 $0.540 $0.550 $0.550 $0.550 $0.500 $1.100
PAVEMENT SLER 12"
LF 430.000 $0.700 $2.700 $2.650 $2.750 $2.550 $2.500 $2.200
PAVEMENT SLER 24"
LF 2,623.000 $1.150 $3.500 $3.400 $3.600 $3.350 $3.500 $4.400
PAVEMENT SLER (MED NOSE)
EA 6.000 $100.000 $270.000 $262.000 $275.000 $255.000 $260.000 $275.000
PAVEMENT SLER (SYMBOL)
EA 2.000 $200.000 $110.000 $105.000 $110.000 $102.000 $100.000 $220.000
PREFAB PM TY B (W)(6")(BRK)CONTRAST
LF 466.000 $20.000 $21.500 $21.000 $22.000 $20.500 $22.000 $2.200
PREFAB PM TY C (W)(SYMBOL)
EA 2.000 $524.500 $270.000 $262.000 $275.000 $255.000 $260.000 $275.000
REFL PAV MRKR TY II-C-R
EA 339.000 $5.000 $6.450 $6.300 $6.600 $6.250 $6.000 $5.500
ELIM EXT PM & MRKS (6")
LF 2,199.000 $1.000 $1.070 $1.050 $1.100 $1.050 $1.000 $1.100
PAV SURF PREP FOR MRK (6")
LF 14,518.000 $1.000 $0.110 $0.110 $0.150 $0.100 $0.100 $1.100
PAV SURF PREP FOR MRK (8")
LF 4,071.000 $1.200 $0.220 $0.200 $0.250 $0.200 $0.200 $1.100
PAV SURF PREP FOR MRK (12")
LF 430.000 $1.500 $0.530 $0.550 $0.550 $0.550 $0.500 $2.200
PAV SURF PREP FOR MRK (24")
LF 2,623.000 $2.500 $1.070 $1.050 $1.100 $1.050 $1.000 $3.300
PAV SURF PREP FOR MRK (SYMBOL)
EA 2.000 $5.000 $53.500 $53.000 $55.000 $51.000 $50.000 $110.000
PAV SURF PREP FOR MRK (MED NOSE)
EA 6.000 $5.000 $53.500 $53.000 $55.000 $51.000 $50.000 $165.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $375.000 $360.000 $605.000 $370.000 $345.000 $360.000 $370.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 2.000 $6,250.000 $6,700.000 $7,120.000 $6,875.000 $6,375.000 $6,600.000 $6,875.000
REMOVE TRF SIG PL
EA 1.000 $2,000.000 $1,825.000 $910.000 $1,870.000 $1,734.000 $1,800.000 $1,900.000
TREE AND BRUSH REMOVAL
AC 4.000 $10,000.000 $30,000.000 $10,500.000 $15,000.000 $27,500.000 $3,000.000 $30,000.000
WIDE FLANGE PAVEMENT TERMINALS
LF 30.000 $600.000 $850.000 $805.000 $470.000 $1,326.000 $425.000 $875.000
PERMEABLE CONCRETE EDGE DRAIN
LF 2,585.000 $80.000 $66.500 $73.000 $70.000 $62.000 $90.000 $66.000
WATER FILLED BARRIER
LF 500.000 $200.000 $100.000 $126.000 $53.000 $115.000 $55.000 $160.000
Totals: $11,312,219.230 $9,498,728.510 $10,553,425.180 $10,622,364.600 $11,081,706.950 $11,291,700.600 $12,337,808.785
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $11,000.00
Total: $21,000.00