PREPARING ROW
|
STA
|
68.400
|
$1,500.000
|
$1,500.000
|
$1,050.000
|
$5,000.000
|
$1,100.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
485.000
|
$25.000
|
$10.000
|
$23.600
|
$25.000
|
$23.500
|
$6.000
|
$10.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
165.000
|
$30.000
|
$15.000
|
$46.250
|
$37.000
|
$15.000
|
$61.000
|
$25.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
31,343.000
|
$12.000
|
$10.000
|
$7.400
|
$10.500
|
$7.600
|
$23.000
|
$13.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
358.000
|
$20.000
|
$12.000
|
$10.650
|
$8.000
|
$15.900
|
$30.000
|
$25.000
|
|
|
EMBANK (FNL)(DC)(TY A)
|
CY
|
22,669.000
|
$20.000
|
$15.000
|
$6.150
|
$16.250
|
$26.250
|
$23.000
|
$17.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
41,221.000
|
$0.400
|
$0.120
|
$0.200
|
$0.250
|
$0.110
|
$0.150
|
$0.120
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
41,221.000
|
$0.400
|
$0.120
|
$0.200
|
$0.150
|
$0.110
|
$0.150
|
$0.120
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
82,438.000
|
$0.350
|
$0.540
|
$0.750
|
$0.150
|
$0.500
|
$0.200
|
$0.540
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,970.500
|
$26.000
|
$6.000
|
$5.000
|
$16.000
|
$1.000
|
$200.000
|
$8.750
|
|
|
CEMENT
|
TON
|
624.000
|
$220.000
|
$255.000
|
$252.000
|
$300.000
|
$287.500
|
$200.000
|
$273.000
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
41,359.000
|
$4.000
|
$3.000
|
$4.850
|
$2.600
|
$4.400
|
$5.250
|
$3.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,342.000
|
$6.000
|
$5.500
|
$8.400
|
$6.400
|
$4.550
|
$10.000
|
$6.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
3,656.000
|
$150.000
|
$148.000
|
$147.000
|
$143.000
|
$145.000
|
$167.000
|
$154.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
1,165.000
|
$150.000
|
$153.000
|
$148.000
|
$148.000
|
$145.000
|
$164.000
|
$166.000
|
|
|
SP MIXES SP-D PG70-22
|
TON
|
7,441.000
|
$170.000
|
$148.000
|
$151.000
|
$144.000
|
$146.500
|
$165.000
|
$164.000
|
|
|
TACK COAT
|
GAL
|
6,337.000
|
$3.000
|
$5.000
|
$6.300
|
$4.900
|
$7.150
|
$6.500
|
$5.000
|
|
|
PLANE ASPH CONC PAV(3")
|
SY
|
4,580.000
|
$6.000
|
$4.500
|
$3.650
|
$6.800
|
$5.000
|
$3.000
|
$5.250
|
|
|
CONC PVMT (CPCD) (11")
|
SY
|
31,948.000
|
$95.000
|
$82.000
|
$113.300
|
$105.000
|
$103.000
|
$96.000
|
$132.000
|
|
|
CEM STABIL BKFL
|
CY
|
20.000
|
$250.000
|
$275.000
|
$240.000
|
$220.000
|
$300.000
|
$88.000
|
$260.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.000
|
$550.000
|
$300.000
|
$470.000
|
$410.000
|
$325.000
|
$1,100.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,031.000
|
$10.000
|
$10.000
|
$4.000
|
$10.000
|
$9.000
|
$15.000
|
$13.750
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
96.000
|
$800.000
|
$1,065.000
|
$580.000
|
$1,100.000
|
$1,020.000
|
$1,050.000
|
$1,100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
210.000
|
$300.000
|
$285.000
|
$245.000
|
$290.000
|
$275.000
|
$280.000
|
$295.000
|
|
|
CL A CONC (MISC)
|
CY
|
50.000
|
$640.000
|
$250.000
|
$710.000
|
$515.000
|
$600.000
|
$785.000
|
$665.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
4.000
|
$2,000.000
|
$1,000.000
|
$1,575.000
|
$950.000
|
$2,750.000
|
$1,900.000
|
$1,950.000
|
|
|
CL C CONC (MISC)
|
CY
|
27.000
|
$2,000.000
|
$650.000
|
$815.000
|
$1,690.000
|
$750.000
|
$1,200.000
|
$700.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
554.000
|
$575.000
|
$500.000
|
$945.000
|
$505.000
|
$585.000
|
$455.000
|
$660.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
60.000
|
$678.000
|
$515.000
|
$815.000
|
$510.000
|
$650.000
|
$475.000
|
$630.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
54.000
|
$250.000
|
$195.000
|
$215.000
|
$225.000
|
$220.000
|
$185.000
|
$221.650
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
459.000
|
$200.000
|
$155.000
|
$124.000
|
$165.000
|
$210.000
|
$220.000
|
$220.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
94.000
|
$70.000
|
$60.000
|
$73.000
|
$61.000
|
$56.000
|
$122.000
|
$61.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
77.000
|
$100.000
|
$90.000
|
$100.000
|
$86.000
|
$78.000
|
$211.000
|
$86.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
734.000
|
$150.000
|
$155.000
|
$132.000
|
$136.000
|
$142.000
|
$197.000
|
$132.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
292.000
|
$250.000
|
$200.000
|
$172.000
|
$190.000
|
$175.000
|
$267.000
|
$166.000
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
3.000
|
$12,000.000
|
$11,000.000
|
$9,700.000
|
$9,100.000
|
$9,142.500
|
$7,100.000
|
$10,250.000
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
1.000
|
$15,000.000
|
$11,500.000
|
$9,700.000
|
$9,800.000
|
$9,734.750
|
$6,850.000
|
$10,930.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$7,000.000
|
$7,000.000
|
$6,110.000
|
$5,800.000
|
$8,567.500
|
$4,000.000
|
$7,000.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
2.000
|
$11,500.000
|
$9,000.000
|
$7,305.000
|
$6,550.000
|
$9,717.500
|
$5,400.000
|
$8,300.000
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
1.000
|
$10,000.000
|
$1,500.000
|
$7,150.000
|
$4,750.000
|
$1,500.000
|
$4,900.000
|
$7,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$900.000
|
$1,550.000
|
$1,250.000
|
$1,023.500
|
$2,700.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,700.000
|
$1,325.000
|
$1,945.000
|
$1,700.000
|
$1,403.000
|
$2,900.000
|
$2,270.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$8,080.000
|
$3,850.000
|
$4,950.000
|
$3,950.000
|
$3,823.750
|
$5,300.000
|
$3,950.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$10,200.000
|
$7,650.000
|
$8,166.000
|
$7,500.000
|
$7,000.000
|
$8,700.000
|
$7,500.000
|
|
|
GRATE & FRAME
|
EA
|
90.000
|
$1,000.000
|
$1,250.000
|
$1,050.000
|
$1,560.000
|
$1,606.550
|
$1,700.000
|
$2,000.000
|
|
|
PIPE (PVC) (SCH 80) (6 IN)
|
LF
|
600.000
|
$100.000
|
$50.000
|
$18.500
|
$30.000
|
$31.000
|
$80.000
|
$40.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$600.000
|
$300.000
|
$954.000
|
$465.000
|
$250.000
|
$575.000
|
$275.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,800.000
|
$350.000
|
$954.000
|
$930.000
|
$750.000
|
$1,300.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
102.000
|
$30.000
|
$15.000
|
$38.000
|
$36.500
|
$25.000
|
$92.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,042,000.000
|
$525,000.000
|
$630,000.000
|
$1,000,000.000
|
$1,000,000.000
|
$300,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$5,000.000
|
$2,500.000
|
$5,300.000
|
$1,925.000
|
$2,500.000
|
$6,800.000
|
$6,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$18,000.000
|
$17,000.000
|
$12,000.000
|
$22,758.750
|
$16,500.000
|
$19,250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
15.000
|
$200.000
|
$300.000
|
$471.000
|
$330.000
|
$241.250
|
$225.000
|
$265.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$150.000
|
$300.000
|
$753.000
|
$465.000
|
$143.750
|
$1,850.000
|
$360.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
315.000
|
$50.000
|
$42.000
|
$61.000
|
$35.000
|
$40.000
|
$75.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
315.000
|
$15.000
|
$10.000
|
$5.000
|
$11.000
|
$10.200
|
$11.000
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$30.000
|
$35.000
|
$31.000
|
$51.000
|
$38.000
|
$49.000
|
$36.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$9.000
|
$12.000
|
$14.500
|
$11.000
|
$15.000
|
$11.000
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,040.000
|
$7.000
|
$4.300
|
$3.700
|
$5.500
|
$4.000
|
$5.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,040.000
|
$4.000
|
$1.000
|
$1.050
|
$0.700
|
$1.250
|
$0.650
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
403.000
|
$8.000
|
$5.500
|
$8.400
|
$5.500
|
$5.100
|
$5.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
403.000
|
$4.000
|
$1.000
|
$2.100
|
$0.700
|
$1.250
|
$0.650
|
$2.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
5,310.000
|
$85.000
|
$82.000
|
$59.000
|
$32.000
|
$57.500
|
$95.000
|
$94.500
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
3,600.000
|
$15.000
|
$6.000
|
$11.500
|
$7.000
|
$11.250
|
$5.250
|
$7.500
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
5,310.000
|
$20.000
|
$10.000
|
$38.000
|
$9.000
|
$36.750
|
$6.000
|
$11.000
|
|
|
CONC CURB (TY II)
|
LF
|
2,397.000
|
$40.000
|
$8.000
|
$4.200
|
$8.250
|
$7.250
|
$7.000
|
$10.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
100.000
|
$500.000
|
$550.000
|
$281.000
|
$375.000
|
$585.000
|
$485.000
|
$300.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
1,542.000
|
$75.000
|
$70.000
|
$100.000
|
$62.000
|
$137.700
|
$73.000
|
$73.200
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$2,200.000
|
$2,500.000
|
$4,725.000
|
$2,600.000
|
$2,281.500
|
$1,900.000
|
$1,920.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
5.000
|
$2,200.000
|
$2,500.000
|
$4,200.000
|
$2,600.000
|
$2,281.500
|
$1,900.000
|
$1,700.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$2,200.000
|
$2,500.000
|
$6,825.000
|
$2,500.000
|
$2,223.000
|
$1,900.000
|
$1,920.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,100.000
|
$30.000
|
$24.000
|
$25.000
|
$24.750
|
$24.000
|
$25.000
|
$31.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$1,600.000
|
$1,750.000
|
$1,600.000
|
$1,760.000
|
$2,400.000
|
$1,700.000
|
$1,675.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,250.000
|
$1,400.000
|
$1,340.000
|
$1,430.000
|
$1,750.000
|
$1,400.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$10.000
|
$2.150
|
$2.100
|
$2.200
|
$2.500
|
$2.000
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$443.680
|
$215.000
|
$210.000
|
$220.000
|
$225.000
|
$215.000
|
$220.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$250.000
|
$160.000
|
$210.000
|
$165.000
|
$225.000
|
$160.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,315.000
|
$3,300.000
|
$3,255.000
|
$3,400.000
|
$3,475.000
|
$3,300.000
|
$3,410.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,500.000
|
$2,150.000
|
$2,625.000
|
$2,200.000
|
$2,550.000
|
$2,200.000
|
$1,375.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$535.000
|
$1,575.000
|
$550.000
|
$1,530.000
|
$530.000
|
$880.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$13,200.000
|
$9,500.000
|
$10,500.000
|
$9,500.000
|
$10,200.000
|
$9,200.000
|
$9,020.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
2,585.000
|
$60.000
|
$42.000
|
$29.500
|
$31.000
|
$53.500
|
$35.000
|
$38.500
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
21.000
|
$800.000
|
$800.000
|
$910.000
|
$825.000
|
$765.000
|
$840.000
|
$830.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
21.000
|
$5,000.000
|
$6,300.000
|
$5,885.000
|
$6,500.000
|
$6,015.000
|
$6,600.000
|
$6,500.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
3.000
|
$50,000.000
|
$61,000.000
|
$46,050.000
|
$62,700.000
|
$58,500.000
|
$63,000.000
|
$63,000.000
|
|
|
LED HI MST IL ASM (6 FIXT) (TY A)
|
EA
|
3.000
|
$35,000.000
|
$50,000.000
|
$43,075.000
|
$51,500.000
|
$47,685.000
|
$52,000.000
|
$51,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
14,153.000
|
$14.800
|
$8.850
|
$8.100
|
$9.000
|
$8.450
|
$9.000
|
$9.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
204.000
|
$27.000
|
$20.600
|
$40.000
|
$21.000
|
$19.650
|
$23.000
|
$22.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
13,926.000
|
$2.250
|
$2.650
|
$2.200
|
$2.700
|
$2.500
|
$3.000
|
$3.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
11,133.000
|
$2.800
|
$2.900
|
$2.200
|
$3.000
|
$2.750
|
$3.000
|
$3.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
6.000
|
$1,100.000
|
$1,140.000
|
$1,015.000
|
$1,170.000
|
$1,090.000
|
$1,200.000
|
$1,175.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
29.000
|
$1,500.000
|
$1,400.000
|
$735.000
|
$1,430.000
|
$1,330.000
|
$1,450.000
|
$1,450.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,700.000
|
$1,625.000
|
$1,092.000
|
$1,675.000
|
$1,555.000
|
$1,700.000
|
$1,675.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$1,000.000
|
$800.000
|
$910.000
|
$820.000
|
$780.000
|
$800.000
|
$1,000.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)TP(O)
|
EA
|
1.000
|
$8,500.000
|
$6,550.000
|
$8,870.000
|
$6,750.000
|
$6,250.000
|
$6,500.000
|
$6,750.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)SP(O)
|
EA
|
2.000
|
$11,000.000
|
$7,075.000
|
$9,970.000
|
$7,300.000
|
$6,750.000
|
$7,000.000
|
$7,300.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
245.000
|
$50.000
|
$43.000
|
$36.500
|
$44.000
|
$41.000
|
$40.000
|
$44.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$850.000
|
$765.000
|
$690.000
|
$785.000
|
$675.000
|
$825.000
|
$785.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$950.000
|
$1,100.000
|
$815.000
|
$1,140.000
|
$800.000
|
$1,250.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,410.000
|
$1,360.000
|
$1,450.000
|
$1,325.000
|
$1,700.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$2,370.000
|
$2,040.000
|
$2,300.000
|
$2,800.000
|
$2,050.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$1,000.000
|
$660.000
|
$625.000
|
$675.000
|
$625.000
|
$650.000
|
$675.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$175.000
|
$100.000
|
$83.000
|
$132.000
|
$85.000
|
$125.000
|
$130.000
|
|
|
REMOVE LRSA
|
EA
|
3.000
|
$1,935.000
|
$730.000
|
$820.000
|
$750.000
|
$695.000
|
$800.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
34.000
|
$50.000
|
$110.000
|
$79.000
|
$110.000
|
$76.500
|
$100.000
|
$183.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$42.000
|
$50.000
|
$58.000
|
$50.000
|
$60.000
|
$60.000
|
$35.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
10,882.000
|
$3.000
|
$1.900
|
$1.850
|
$1.950
|
$1.800
|
$1.750
|
$1.100
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
533.000
|
$2.000
|
$2.150
|
$2.100
|
$2.200
|
$2.050
|
$2.000
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,132.000
|
$1.000
|
$1.300
|
$1.300
|
$1.350
|
$1.250
|
$1.250
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
749.000
|
$4.000
|
$4.300
|
$4.200
|
$4.400
|
$4.100
|
$4.000
|
$2.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,623.000
|
$8.000
|
$6.450
|
$6.300
|
$6.600
|
$6.150
|
$6.000
|
$6.600
|
|
REF PAV MRK TY I (W)(MED NOSE)(100MIL)
|
EA
|
6.000
|
$300.000
|
$535.000
|
$525.000
|
$550.000
|
$510.000
|
$500.000
|
$550.000
|
|
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
|
LF
|
10,112.000
|
$1.350
|
$2.700
|
$2.650
|
$2.750
|
$2.550
|
$2.500
|
$1.100
|
|
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
|
LF
|
2,316.000
|
$1.350
|
$1.070
|
$1.050
|
$1.100
|
$1.050
|
$1.000
|
$2.200
|
|
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
|
LF
|
4,248.000
|
$1.350
|
$1.070
|
$1.050
|
$1.100
|
$1.050
|
$1.000
|
$1.100
|
|
|
PAVEMENT SLER 6"
|
LF
|
14,518.000
|
$0.500
|
$0.540
|
$0.550
|
$0.550
|
$0.510
|
$0.500
|
$1.100
|
|
|
PAVEMENT SLER 8"
|
LF
|
4,089.000
|
$0.600
|
$0.540
|
$0.550
|
$0.550
|
$0.550
|
$0.500
|
$1.100
|
|
|
PAVEMENT SLER 12"
|
LF
|
430.000
|
$0.700
|
$2.700
|
$2.650
|
$2.750
|
$2.550
|
$2.500
|
$2.200
|
|
|
PAVEMENT SLER 24"
|
LF
|
2,623.000
|
$1.150
|
$3.500
|
$3.400
|
$3.600
|
$3.350
|
$3.500
|
$4.400
|
|
|
PAVEMENT SLER (MED NOSE)
|
EA
|
6.000
|
$100.000
|
$270.000
|
$262.000
|
$275.000
|
$255.000
|
$260.000
|
$275.000
|
|
|
PAVEMENT SLER (SYMBOL)
|
EA
|
2.000
|
$200.000
|
$110.000
|
$105.000
|
$110.000
|
$102.000
|
$100.000
|
$220.000
|
|
PREFAB PM TY B (W)(6")(BRK)CONTRAST
|
LF
|
466.000
|
$20.000
|
$21.500
|
$21.000
|
$22.000
|
$20.500
|
$22.000
|
$2.200
|
|
PREFAB PM TY C (W)(SYMBOL)
|
EA
|
2.000
|
$524.500
|
$270.000
|
$262.000
|
$275.000
|
$255.000
|
$260.000
|
$275.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
339.000
|
$5.000
|
$6.450
|
$6.300
|
$6.600
|
$6.250
|
$6.000
|
$5.500
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
2,199.000
|
$1.000
|
$1.070
|
$1.050
|
$1.100
|
$1.050
|
$1.000
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
14,518.000
|
$1.000
|
$0.110
|
$0.110
|
$0.150
|
$0.100
|
$0.100
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,071.000
|
$1.200
|
$0.220
|
$0.200
|
$0.250
|
$0.200
|
$0.200
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
430.000
|
$1.500
|
$0.530
|
$0.550
|
$0.550
|
$0.550
|
$0.500
|
$2.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,623.000
|
$2.500
|
$1.070
|
$1.050
|
$1.100
|
$1.050
|
$1.000
|
$3.300
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
2.000
|
$5.000
|
$53.500
|
$53.000
|
$55.000
|
$51.000
|
$50.000
|
$110.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
6.000
|
$5.000
|
$53.500
|
$53.000
|
$55.000
|
$51.000
|
$50.000
|
$165.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$375.000
|
$360.000
|
$605.000
|
$370.000
|
$345.000
|
$360.000
|
$370.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$6,250.000
|
$6,700.000
|
$7,120.000
|
$6,875.000
|
$6,375.000
|
$6,600.000
|
$6,875.000
|
|
|
REMOVE TRF SIG PL
|
EA
|
1.000
|
$2,000.000
|
$1,825.000
|
$910.000
|
$1,870.000
|
$1,734.000
|
$1,800.000
|
$1,900.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
4.000
|
$10,000.000
|
$30,000.000
|
$10,500.000
|
$15,000.000
|
$27,500.000
|
$3,000.000
|
$30,000.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
30.000
|
$600.000
|
$850.000
|
$805.000
|
$470.000
|
$1,326.000
|
$425.000
|
$875.000
|
|
|
PERMEABLE CONCRETE EDGE DRAIN
|
LF
|
2,585.000
|
$80.000
|
$66.500
|
$73.000
|
$70.000
|
$62.000
|
$90.000
|
$66.000
|
|
|
WATER FILLED BARRIER
|
LF
|
500.000
|
$200.000
|
$100.000
|
$126.000
|
$53.000
|
$115.000
|
$55.000
|
$160.000
|
|
Totals: |
$11,312,219.230
|
$9,498,728.510
|
$10,553,425.180
|
$10,622,364.600
|
$11,081,706.950
|
$11,291,700.600
|
$12,337,808.785
|