PREPARING ROW
|
STA
|
59.000
|
$2,000.000
|
$2,400.000
|
$3,000.000
|
$2,800.000
|
$2,500.000
|
$998.000
|
|
|
DISPOSAL OF WATER WELLS
|
EA
|
1.000
|
$2,000.000
|
$3,500.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$10,241.000
|
|
|
REMOVE TRT BASE & ASPH PAV (20"-30")
|
SY
|
19,911.200
|
$8.000
|
$11.500
|
$10.500
|
$13.000
|
$10.000
|
$11.390
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,680.000
|
$7.000
|
$6.000
|
$6.000
|
$7.000
|
$10.000
|
$7.400
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
28.000
|
$15.000
|
$50.000
|
$30.000
|
$20.000
|
$100.000
|
$28.410
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
12,690.000
|
$15.000
|
$7.750
|
$8.500
|
$10.000
|
$15.000
|
$13.870
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
86,827.000
|
$7.000
|
$6.750
|
$7.000
|
$8.500
|
$12.370
|
$7.830
|
|
|
FURNISHING AND PLACING TOPSOIL (6")
|
SY
|
83,280.000
|
$1.250
|
$1.250
|
$2.000
|
$1.250
|
$2.000
|
$1.440
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
41,640.000
|
$0.200
|
$0.160
|
$0.120
|
$0.170
|
$0.140
|
$0.230
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
20,425.000
|
$0.120
|
$0.150
|
$0.080
|
$0.150
|
$0.140
|
$0.270
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
20,425.000
|
$0.120
|
$0.150
|
$0.100
|
$0.150
|
$0.130
|
$0.250
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
83,280.000
|
$0.900
|
$0.950
|
$0.750
|
$1.000
|
$0.960
|
$1.090
|
|
|
VEGETATIVE WATERING
|
MG
|
666.200
|
$10.000
|
$7.000
|
$10.000
|
$15.000
|
$5.000
|
$12.040
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
14,700.000
|
$2.000
|
$1.450
|
$1.000
|
$1.600
|
$2.000
|
$1.610
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
20,428.200
|
$20.000
|
$20.500
|
$25.000
|
$22.000
|
$15.000
|
$21.700
|
|
|
CEMENT
|
TON
|
683.000
|
$150.000
|
$180.000
|
$175.000
|
$155.000
|
$140.000
|
$156.750
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
25,943.500
|
$2.250
|
$2.650
|
$4.000
|
$3.000
|
$2.500
|
$3.010
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
20,428.200
|
$2.500
|
$2.750
|
$4.500
|
$4.000
|
$2.500
|
$3.610
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
5,128.000
|
$5.000
|
$4.000
|
$6.000
|
$5.000
|
$4.500
|
$4.820
|
|
|
ASPH (TIER I)
|
GAL
|
8,203.000
|
$5.000
|
$4.000
|
$6.000
|
$4.500
|
$4.500
|
$4.820
|
|
|
AGGR (TY-B GR-3)
|
CY
|
207.000
|
$100.000
|
$110.000
|
$120.000
|
$160.000
|
$150.000
|
$156.750
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
1,897.000
|
$125.000
|
$110.000
|
$110.000
|
$105.000
|
$110.000
|
$134.000
|
|
|
SUPERPAVE MIXTURES SP-D PG76-22
|
TON
|
2,171.700
|
$150.000
|
$110.000
|
$98.000
|
$100.000
|
$103.000
|
$119.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
8,534.000
|
$3.000
|
$2.650
|
$3.000
|
$2.000
|
$7.000
|
$1.760
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
4,212.700
|
$75.000
|
$82.000
|
$80.000
|
$77.000
|
$75.000
|
$106.500
|
|
|
CEM STABIL BKFL
|
CY
|
572.400
|
$160.000
|
$235.000
|
$175.000
|
$140.000
|
$180.000
|
$123.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
41,001.000
|
$15.000
|
$20.000
|
$20.000
|
$22.000
|
$20.000
|
$41.020
|
|
|
SHEET PILING (PZ - 35)
|
SF
|
4,000.000
|
$44.000
|
$2.500
|
$48.000
|
$35.000
|
$35.000
|
$58.520
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,810.000
|
$300.000
|
$160.000
|
$130.000
|
$140.000
|
$100.000
|
$201.250
|
|
|
CL A CONC (SEAL)
|
CY
|
50.000
|
$350.000
|
$300.000
|
$400.000
|
$250.000
|
$350.000
|
$412.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
127.800
|
$1,000.000
|
$815.000
|
$900.000
|
$850.000
|
$900.000
|
$1,012.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
122.600
|
$1,200.000
|
$830.000
|
$950.000
|
$850.000
|
$1,500.000
|
$1,075.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
63.200
|
$1,200.000
|
$875.000
|
$1,000.000
|
$850.000
|
$1,500.000
|
$1,159.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
37,720.000
|
$18.000
|
$17.750
|
$17.000
|
$17.000
|
$17.000
|
$20.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
240.400
|
$500.000
|
$460.000
|
$500.000
|
$475.000
|
$500.000
|
$540.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,896.000
|
$150.000
|
$170.000
|
$140.000
|
$150.000
|
$141.000
|
$181.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
4,318.000
|
$3.100
|
$2.750
|
$4.000
|
$3.500
|
$1.770
|
$2.170
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,072.000
|
$160.000
|
$135.000
|
$175.000
|
$120.000
|
$150.000
|
$145.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
86.000
|
$500.000
|
$485.000
|
$450.000
|
$450.000
|
$400.000
|
$458.500
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,736.000
|
$85.000
|
$68.000
|
$80.000
|
$100.000
|
$90.000
|
$77.880
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
252.000
|
$80.000
|
$60.000
|
$100.000
|
$70.000
|
$150.000
|
$107.250
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
32.000
|
$225.000
|
$405.000
|
$300.000
|
$400.000
|
$270.000
|
$341.250
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
95.000
|
$300.000
|
$325.000
|
$400.000
|
$400.000
|
$300.000
|
$363.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
132.000
|
$45.000
|
$55.000
|
$35.000
|
$35.000
|
$35.000
|
$52.020
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
410.000
|
$55.000
|
$64.000
|
$50.000
|
$48.000
|
$55.000
|
$63.450
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
50.000
|
$65.000
|
$85.000
|
$75.000
|
$65.000
|
$70.000
|
$106.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
56.000
|
$150.000
|
$110.000
|
$100.000
|
$95.000
|
$80.000
|
$119.250
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$9,000.000
|
$8,600.000
|
$4,500.000
|
$7,000.000
|
$6,500.000
|
$7,171.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$5,700.000
|
$6,500.000
|
$4,500.000
|
$4,000.000
|
$6,000.000
|
$5,024.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$750.000
|
$850.000
|
$600.000
|
$575.000
|
$550.000
|
$788.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$1,300.000
|
$1,075.000
|
$900.000
|
$900.000
|
$1,100.000
|
$1,236.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$1,335.000
|
$1,000.000
|
$1,100.000
|
$1,200.000
|
$3,791.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,780.000
|
$3,500.000
|
$5,000.000
|
$4,500.000
|
$3,500.000
|
$3,832.000
|
|
|
REMOV STR (PIPE)
|
LF
|
364.000
|
$21.500
|
$12.000
|
$10.000
|
$15.000
|
$30.000
|
$15.980
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
32.000
|
$62.000
|
$80.000
|
$200.000
|
$65.000
|
$70.000
|
$107.750
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$100,000.000
|
$35,000.000
|
$40,000.000
|
$26,000.000
|
$60,000.000
|
$97,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$978,875.220
|
$550,000.000
|
$800,000.000
|
$735,000.000
|
$500,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
26.000
|
$2,500.000
|
$2,500.000
|
$1,500.000
|
$4,000.000
|
$1,500.000
|
$2,738.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
150.000
|
$40.000
|
$32.000
|
$40.000
|
$30.000
|
$40.000
|
$120.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
357.000
|
$45.000
|
$44.000
|
$40.000
|
$65.000
|
$40.000
|
$152.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
507.000
|
$8.000
|
$11.000
|
$10.000
|
$5.000
|
$10.000
|
$24.970
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
300.000
|
$25.000
|
$28.000
|
$25.000
|
$25.000
|
$25.000
|
$50.010
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
300.000
|
$8.000
|
$10.000
|
$10.000
|
$5.000
|
$9.500
|
$14.490
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
30,779.000
|
$2.500
|
$2.700
|
$2.500
|
$3.000
|
$2.480
|
$2.320
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
30,779.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
$0.930
|
|
|
CONSTRUCTING DETOURS
|
SY
|
14,878.000
|
$75.000
|
$35.000
|
$57.000
|
$55.000
|
$45.000
|
$42.500
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
950.000
|
$50.000
|
$13.500
|
$6.000
|
$7.000
|
$25.000
|
$6.980
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
11,875.000
|
$50.000
|
$22.000
|
$12.000
|
$15.000
|
$25.000
|
$14.250
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
11,875.000
|
$25.000
|
$22.000
|
$12.000
|
$13.000
|
$25.000
|
$11.400
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,048.000
|
$50.000
|
$55.000
|
$60.000
|
$52.000
|
$25.000
|
$12.120
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,852.500
|
$22.000
|
$23.650
|
$18.000
|
$21.000
|
$16.000
|
$25.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
$1,575.000
|
$1,600.000
|
$1,265.000
|
$1,500.000
|
$1,150.000
|
$1,928.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,100.000
|
$3.500
|
$3.850
|
$2.000
|
$3.000
|
$1.500
|
$3.610
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$2,295.000
|
$2,150.000
|
$2,400.000
|
$2,060.000
|
$3,133.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$400.000
|
$250.000
|
$200.000
|
$250.000
|
$250.000
|
$361.500
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
8.000
|
$3,000.000
|
$6,200.000
|
$2,400.000
|
$2,600.000
|
$3,000.000
|
$3,615.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$350.000
|
$6,200.000
|
$1,000.000
|
$1,200.000
|
$3,000.000
|
$4,820.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
8.000
|
$2,000.000
|
$1,375.000
|
$1,000.000
|
$1,000.000
|
$800.000
|
$2,410.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$200.000
|
$405.000
|
$400.000
|
$400.000
|
$400.000
|
$443.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$800.000
|
$570.000
|
$550.000
|
$600.000
|
$1,000.000
|
$623.500
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
5.000
|
$300.000
|
$520.000
|
$500.000
|
$525.000
|
$1,000.000
|
$567.250
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$60.000
|
$140.000
|
$150.000
|
$130.000
|
$300.000
|
$151.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
8.000
|
$35.000
|
$60.000
|
$15.000
|
$25.000
|
$25.000
|
$25.300
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
70.000
|
$40.000
|
$44.000
|
$20.000
|
$25.000
|
$25.000
|
$28.910
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
10,300.000
|
$0.300
|
$0.550
|
$0.500
|
$0.550
|
$0.250
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,300.000
|
$0.300
|
$0.550
|
$0.500
|
$0.550
|
$0.250
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
832.000
|
$2.250
|
$3.850
|
$3.500
|
$4.000
|
$3.000
|
$4.220
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
416.000
|
$2.250
|
$3.850
|
$3.500
|
$4.000
|
$3.000
|
$4.220
|
|
|
PAVEMENT SEALER 4"
|
LF
|
7,200.000
|
$0.300
|
$0.220
|
$0.200
|
$0.220
|
$0.200
|
$0.240
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
12.000
|
$12.000
|
$19.250
|
$18.000
|
$20.000
|
$16.000
|
$21.090
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
208.000
|
$3.500
|
$4.400
|
$4.000
|
$4.500
|
$5.000
|
$4.820
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,600.000
|
$1.000
|
$0.580
|
$0.550
|
$0.600
|
$0.350
|
$0.620
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,200.000
|
$0.100
|
$0.180
|
$0.150
|
$0.180
|
$0.350
|
$0.180
|
|
|
FLOATING TURBIDITY BARRIER
|
LF
|
200.000
|
$75.000
|
$55.000
|
$50.000
|
$60.000
|
$50.000
|
$57.830
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
16,600.000
|
$3.500
|
$3.200
|
$2.900
|
$3.300
|
$8.000
|
$3.480
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
8,300.000
|
$3.500
|
$3.200
|
$2.900
|
$3.300
|
$8.000
|
$3.480
|
|
|
REFL PAV MRK AWT (W) (4")(SLD)(125 MIL)
|
LF
|
16,600.000
|
$0.500
|
$0.500
|
$0.450
|
$0.500
|
$0.700
|
$0.550
|
|
|
REFL PAV MRK AWT (Y) (4")(SLD)(125 MIL)
|
LF
|
16,600.000
|
$0.500
|
$0.500
|
$0.450
|
$0.500
|
$0.700
|
$0.550
|
|
Totals: |
$10,756,736.995
|
$8,911,050.600
|
$9,414,223.900
|
$9,477,676.000
|
$9,662,521.270
|
$11,202,130.463
|