Show Job Controls
Bid Cobra

TERRY US 62 (0228-01-058)

Items: 121

County: TERRY
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0228-01-058
DBE Goal: N/A
Project: C 228-1-58
Guaranty: N/A
Time: 393 WORKING DAYS
Engineer's Estimate: $19,760,412.26
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEVE SISNEROS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$19,760,412.26
$18,670,289.16
Over/Under Est: -5.52% -$1,090,123.10
$25,941,426.50
Over/Under Est: 31.28% $6,181,014.24
Amt Left: 38.94% $7,271,137.34
Subcontractor Percentage Amount
W. S. CONSTRUCTION COMPANY 16.04% $3,070,489.05
Z-TEK CONSTRUCTION, LLC 4.78% $915,021.05
INDUSTRIAL FABRICS, INC. 3.05% $583,852.34
KING GEORGE TRAFFIC SOLUTIONS LLC 1.87% $357,968.49
NM AC & COMPANY LLC 1.62% $310,111.74
WILLIAMS ROAD, LLC 1.07% $204,826.89
TRP CONSTRUCTION GROUP, LLC 0.61% $116,770.47
DK CONTRACTING, LLC 0.51% $97,627.77
FC TRAFFIC CONTROL, INC. 0.46% $88,056.42
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.12% $22,971.24
WEST TEXAS ROCK RESOURCES, LLC 0.02% $3,828.54
Total: 30.15% $5,771,524.00

Bid Items & Bid Tabulations

121 Total 0 of 121
TERRY  |  US 62  |  LUBBOCK  |  0228-01-058  |  01/05/2023  |  $19,760,412.26  |  C 228-1-58  |  REHAB EXIST ROADWAY  |  393 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES HAMILTON CONSTRUCTION CO.
DUININCK, INC.
PREPARING ROW
STA 108.020 $550.000 $2,500.000 $3,500.000
REMOVING CONC (CURB AND GUTTER)
LF 3,186.000 $11.000 $15.000 $9.700
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 67,145.000 $11.000 $7.000 $12.000
EXCAVATION (ROADWAY)
CY 246.000 $55.000 $25.000 $80.000
EXCAVATION (CHANNEL)
CY 8,926.000 $11.000 $15.000 $51.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 285.000 $55.000 $25.000 $20.000
BACKFILL (TY B)
STA 88.370 $165.000 $400.000 $220.000
BLADING
STA 88.370 $165.000 $400.000 $120.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 49,448.000 $0.550 $0.400 $0.380
VEGETATIVE WATERING
MG 832.000 $55.000 $55.000 $42.500
PROOF ROLLING
HR 20.500 $220.000 $100.000 $195.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 63,797.000 $12.100 $14.000 $19.500
CEMENT
TON 567.000 $330.000 $275.000 $315.000
CEMENT TREAT (EXIST MATL) (6")
SY 3,028.000 $3.600 $7.000 $9.700
CEMENT TREAT (EXIST MATL)(DC)(8")
SY 48,151.000 $3.300 $5.500 $6.100
PRIME COAT (MC-30)
GAL 22,995.000 $7.200 $5.200 $7.400
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 10,880.000 $5.500 $4.000 $4.850
FOG SEAL (CSS-1H)
GAL 35,497.000 $5.200 $4.000 $4.900
ASPH (AC-20-5TR)
GAL 13,302.000 $6.600 $4.250 $6.300
AGGR(TY-PB GR-4 SAC-B)
CY 302.000 $176.000 $150.000 $320.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,621.000 $77.000 $55.000 $90.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 2,885.000 $61.000 $40.000 $66.500
PLANE ASPH CONC PAV(4" TO 6")
SY 118,323.000 $3.900 $4.000 $7.800
CONC PVMT (CONT REINF - CRCP) (12")
SY 2,911.000 $182.000 $220.000 $290.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 437.000 $165.000 $220.000 $375.000
CEM STABIL BKFL
CY 126.400 $275.000 $255.000 $375.000
RETAINING WALL (CAST - IN - PLACE)
SF 369.000 $22.000 $240.000 $315.000
RIPRAP (CONC)(5 IN)
CY 2,107.000 $715.000 $740.000 $940.000
CMP (GAL STL 24 IN)
LF 4.000 $220.000 $425.000 $125.000
CMP (GAL STL 36 IN)
LF 12.000 $275.000 $485.000 $250.000
CONC BOX CULV (3 FT X 2 FT)
LF 30.500 $550.000 $1,520.000 $1,100.000
CONC BOX CULV (5 FT X 3 FT)
LF 840.000 $704.000 $752.000 $875.000
CONC BOX CULV (6 FT X 3 FT)
LF 80.000 $550.000 $924.000 $1,100.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 1.000 $11,000.000 $14,500.000 $15,500.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX3FT)
EA 1.000 $8,800.000 $15,000.000 $15,500.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 4.000 $16,500.000 $13,600.000 $16,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
EA 24.000 $15,125.000 $20,000.000 $17,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 2.000 $22,000.000 $23,400.000 $22,000.000
SET (TY II) (24 IN) (CMP) (6: 1) (C)
EA 2.000 $4,400.000 $3,370.000 $3,100.000
SET (TY II) (36 IN) (CMP) (6: 1) (C)
EA 6.000 $4,950.000 $6,000.000 $5,000.000
ADJUSTING MANHOLES
EA 7.000 $2,000.000 $1,300.000 $4,400.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 7.000 $1,000.000 $900.000 $4,400.000
CLEAN EXIST CULVERTS
EA 12.000 $2,750.000 $3,000.000 $6,300.000
MOBILIZATION
LS 1.000 $1,733,000.000 $2,000,000.000 $2,600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $25,000.000 $7,500.000 $33,000.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 300.000 $55.000 $40.000 $62.500
CONSTRUCTION EXITS (REMOVE)
SY 300.000 $16.500 $5.000 $19.000
SANDBAGS FOR EROSION CONTROL
EA 1,689.000 $11.000 $12.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,826.000 $5.500 $5.500 $4.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,413.000 $1.100 $2.000 $2.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 7,860.000 $6.600 $5.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,930.000 $1.100 $2.000 $2.500
CONC CURB & GUTTER (TY II)
LF 1,762.000 $44.000 $53.000 $75.000
CONC CURB (SLOTTED)
LF 60.000 $77.000 $53.000 $81.500
CONC CURB & GUTTER (VALLEY GUTTER)
LF 1,424.000 $66.000 $53.000 $125.000
INTERSECTIONS (ACP)
SY 3,022.000 $85.000 $62.000 $45.500
DRIVEWAYS (CONC)
SY 3,828.000 $110.000 $170.000 $155.000
DRIVEWAYS (ACP)
SY 1,392.000 $85.000 $90.000 $96.000
CONC SIDEWALKS (5")
SY 2,695.000 $85.000 $108.000 $140.000
CURB RAMPS (TY 7)
SY 58.000 $275.000 $154.000 $315.000
CURB RAMPS (TY 10)
SY 97.000 $275.000 $154.000 $315.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 14,730.000 $0.330 $0.220 $0.310
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 6,263.000 $0.330 $0.220 $0.310
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $15.000 $23.000 $12.500
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $1,500.000 $1,100.000 $625.000
WIRE FENCE (TY A)
LF 300.000 $44.000 $23.000 $25.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 22.000 $990.000 $1,050.000 $990.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 16.000 $1,100.000 $1,150.000 $1,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 42.000 $1,045.000 $1,200.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,210.000 $1,450.000 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,210.000 $1,500.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $1,320.000 $1,600.000 $1,800.000
REMOVE SM RD SN SUP&AM
EA 71.000 $99.000 $110.000 $155.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 52.000 $33.000 $55.000 $37.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 44.000 $99.000 $105.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $99.000 $125.000 $105.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 15,013.000 $0.220 $0.200 $0.240
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 110,461.000 $0.220 $0.160 $0.190
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,658.000 $0.550 $0.450 $0.540
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,037.000 $5.500 $1.900 $2.200
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,420.000 $0.220 $0.200 $0.240
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 175,703.000 $0.220 $0.130 $0.150
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 180.000 $3.000 $4.400 $5.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 280.000 $3.000 $4.400 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 220.000 $3.000 $4.400 $5.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 420.000 $3.000 $4.400 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,063.000 $1.100 $1.250 $1.700
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,602.000 $1.100 $1.200 $1.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,203.000 $1.000 $1.100 $1.250
PAVEMENT SEALER 6"
LF 970.000 $1.650 $0.350 $0.410
PAVEMENT SEALER 8"
LF 71.000 $2.200 $0.550 $0.630
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 9,454.000 $0.880 $1.100 $1.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 23,546.000 $0.880 $0.850 $0.960
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,878.000 $0.660 $1.100 $1.250
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 37,185.000 $0.660 $0.850 $0.940
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 710.000 $22.000 $13.000 $14.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $550.000 $250.000 $280.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 5.000 $605.000 $685.000 $780.000
REFL PAV MRKR TY I-C
EA 556.000 $4.400 $4.550 $5.200
REFL PAV MRKR TY II-A-A
EA 895.000 $4.400 $4.400 $5.000
REFL PAV MRKR TY II-C-R
EA 22.000 $4.400 $5.000 $5.650
ELIM EXT PAV MRK & MRKS (4")
LF 185,325.000 $0.850 $0.450 $0.560
ELIM EXT PAV MRK & MRKS (8")
LF 355.000 $2.200 $0.550 $0.690
ELIM EXT PAV MRK & MRKS (24")
LF 72.000 $6.600 $2.000 $2.500
PAV SURF PREP FOR MRK (6")
LF 880.000 $1.000 $0.400 $0.440
PAV SURF PREP FOR MRK (8")
LF 71.000 $1.500 $0.500 $0.560
PAV SURF PREP FOR MRK (24")
LF 710.000 $2.200 $0.750 $0.860
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $5.500 $16.000 $19.000
PAV SURF PREP FOR MRK (RR XING)
EA 5.000 $5.500 $70.000 $81.500
FULL - WIDTH MOWING
CYC 4.000 $5,500.000 $4,200.000 $3,800.000
LITTER REMOVAL
CYC 4.000 $3,300.000 $2,100.000 $3,800.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 102,410.000 $6.600 $6.250 $7.150
ASPH FOR REINF FAB (PG76-28)
GAL 15,361.000 $5.500 $6.000 $8.000
D-GR HMA TY-B PG76-28
TON 27,215.000 $151.000 $135.000 $180.000
TACK COAT
GAL 1,476.000 $11.000 $5.000 $5.900
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 13,567.000 $218.000 $160.000 $245.000
TACK COAT
GAL 3,193.000 $11.000 $5.000 $5.900
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2,880.000 $61.000 $40.000 $105.000
TMA (STATIONARY)
DAY 1,000.000 $182.000 $200.000 $315.000
TMA (MOBILE OPERATION)
DAY 50.000 $880.000 $750.000 $1,100.000
TEMP SPEED MONITOR SYS
EA 2.000 $16,500.000 $10,000.000 $22,500.000
Totals: $19,760,412.260 $18,670,289.160 $25,941,426.500