Show Job Controls
Bid Cobra

HOWARD IH0020 (6492-53-001)

Items: 27

County: HOWARD
Length: 0.0100 MILES
Highway: IH0020
District: ABILENE
Control Number: 6492-53-001
DBE Goal: 0.0%
Project: RMC - A00218162
Guaranty: $19,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $966,365.00
Date: 12/03/2025 (6 months ago) Changed
Contract Number: 12254202
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218162
Project Description: CALLOUT METAL BEAM GUARD FENCE AND MEDIAN CABLE BARRIER REPAIR, ETC.
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$966,365.00
Over/Under Est: -72.17% -$697,402.50
Over/Under Est: -64.35% -$621,835.00
Amt Left: 28.1% $75,567.50
$758,212.00
Over/Under Est: -21.54% -$208,153.00
Amt Left: 181.9% $489,249.50
Delta: -120.07% -$413,682.00
Over/Under Est: 3.09% $29,905.00
Amt Left: 270.41% $727,307.50
Delta: -31.40% -$238,058.00
$1,094,255.00
Over/Under Est: 13.23% $127,890.00
Amt Left: 306.84% $825,292.50
Delta: -9.84% -$97,985.00

Bid Items & Bid Tabulations

27 Total 0 of 27
HOWARD  |  IH0020  |  ABILENE  |  6492-53-001  |  12/03/2025  |  $966,365.00  |  RMC - A00218162  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
BK FIELD OPERATIONS LLC
HJC FARMS, INC.
TI-ZACK CONCRETE, LLC
E.V.G. ENTERPRISE
MOBILIZATION (CALLOUT)
EA 5.000 $750.000 $1,385.000 $1.000 $1.000 $5,500.000 $1,000.000
MOBILIZATION (EMERGENCY)
EA 75.000 $750.000 $1.000 $1.000 $1.000 $4,500.000 $1,000.000
TMA (STATIONARY)
DAY 450.000 $250.000 $0.250 $1.000 $1.000 $122.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $50.000 $1.000 $10.000 $50.000 $15.000 $10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $30.000 $305.000 $500.000 $25.000 $33.000 $10.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 8,500.000 $21.000 $0.180 $1.000 $22.000 $13.000 $17.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 15.000 $58.000 $50.000 $20.000 $115.000 $95.000 $17.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $75.000 $50.000 $1.000 $1.000 $750.000 $20.000
REPLACE TIMBER POST W/O CONC FND
EA 350.000 $65.000 $50.000 $200.000 $40.000 $45.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 350.000 $55.000 $1.000 $1.000 $0.010 $45.000 $200.000
REPLACE TIMBER POST W/ CONC FND
EA 100.000 $65.000 $50.000 $100.000 $40.000 $99.000 $100.000
REPLACE STEEL POST W/ CONC FND
EA 100.000 $55.000 $1.000 $1.000 $0.010 $125.000 $200.000
REM OBSOLETE GET & REPL W/ SGT
EA 91.000 $3,500.000 $985.000 $1,100.000 $4,000.000 $750.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,100.000 $500.000 $500.000 $800.000 $550.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 55.000 $25.000 $89.000 $18.000 $35.000 $122.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $63.000 $287.000 $100.000 $375.000 $1,333.000 $100.000
REPLACE BLOCKOUT
EA 575.000 $20.000 $95.000 $6.000 $3.500 $35.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 15.000 $175.000 $56.000 $100.000 $260.000 $950.000 $100.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 20.000 $650.000 $1.000 $200.000 $1,000.000 $1,500.000 $1,200.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 1,150.000 $25.000 $1.000 $10.000 $28.000 $45.000 $20.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 50.000 $100.000 $924.000 $699.000 $1,250.000 $500.000 $150.000
REPLACE POSTS (TL-4)(TRINITY)
EA 50.000 $100.000 $437.000 $699.000 $750.000 $250.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 45.000 $160.000 $1.000 $1.000 $75.000 $350.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 55.000 $130.000 $1.000 $1.000 $1.000 $250.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 75.000 $1,450.000 $1.000 $200.000 $1.000 $700.000 $1,900.000
REPLACE CABLE (TL-4)
LF 4,400.000 $2.000 $0.250 $3.000 $1.000 $12.000 $1.000
CONCRETE RAIL REPAIR (MISC)
LF 50.000 $500.000 $94.000 $500.000 $5.000 $250.000 $10.000
Totals: $966,365.000 $268,962.500 $344,530.000 $758,212.000 $996,270.000 $1,094,255.000