TAYLOR IH0020 (6460-99-001)

Items: 39

County: TAYLOR
Length: N/A
Highway: IH0020
District: ABILENE
Control Number: 6460-99-001
DBE Goal: 0.0%
Project: RMC - 646099001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,438,835.16
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,438,835.16
$1,098,006.90
Over/Under Est: -23.69% -$340,828.26
Over/Under Est: -9.24% -$132,931.16
Amt Left: 18.93% $207,897.10
$1,666,450.03
Over/Under Est: 15.82% $227,614.87
Amt Left: 51.77% $568,443.13
Delta: -27.61% -$360,546.03
Over/Under Est: 15.82% $227,617.84
Amt Left: 51.77% $568,446.10
Delta: 0.00% -$2.97

Bid Items & Bid Tabulations

39 Total 0 of 39
TAYLOR  |  IH0020  |  ABILENE  |  6460-99-001  |  05/03/2024  |  $1,438,835.16  |  RMC - 646099001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
AUSTIN BARRICADE COMPANY, L.L.C.
HJC FARMS, INC.
HAZMAT INTERNATIONAL, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $600.000 $400.000 $525.000 $1,000.000 $700.000
MOBILIZATION (CALLOUT)
EA 38.000 $1,500.000 $1.000 $1.000 $500.000 $100.000
MOBILIZATION (EMERGENCY)
EA 105.000 $702.000 $1.000 $1.000 $500.000 $100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 16.000 $1,250.000 $600.000 $500.000 $1,210.000 $1,300.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 4.000 $400.000 $1.000 $150.000 $1.000 $800.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 30.000 $300.000 $50.000 $50.000 $765.000 $250.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $295.000 $1.000 $300.000 $1.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 62.000 $10.000 $50.000 $18.000 $5.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 36.000 $48.000 $100.000 $18.000 $5.000 $10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 10.000 $10.000 $1.000 $30.000 $5.000 $10.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 16.000 $10.000 $100.000 $30.000 $5.000 $10.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 4.000 $10.000 $1.000 $50.000 $5.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 107.000 $10.000 $1.000 $10.000 $5.000 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 9,500.000 $24.000 $6.000 $5.000 $26.960 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 121.000 $30.000 $30.000 $30.000 $36.670 $40.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 42.000 $35.000 $60.000 $30.000 $56.840 $30.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $30.000 $1.000 $38.000 $27.000 $35.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 454.000 $35.000 $10.000 $25.000 $72.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 342.000 $85.000 $1.000 $25.000 $114.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 13.000 $100.000 $1.000 $150.000 $151.000 $100.000
REALIGN POSTS
EA 180.000 $24.570 $1.000 $50.000 $5.000 $25.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 834.000 $26.680 $12.000 $11.000 $10.500 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 714.000 $38.000 $12.000 $15.000 $43.120 $35.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 82.000 $104.000 $20.000 $102.000 $110.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 82.000 $4,000.000 $1,775.000 $3,800.000 $3,795.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 24.000 $900.000 $650.000 $850.000 $1,050.000 $1,100.000
REM & RESET SGT IMPACT HEAD
EA 14.000 $145.540 $1.000 $200.000 $500.000 $50.000
REPLACE SGT OBJECT MARKER
EA 6.000 $32.440 $1.000 $1,125.000 $40.000 $30.000
REPLACE POSTS (TL-4)
EA 2,484.000 $185.000 $130.000 $180.000 $275.000 $325.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 34.000 $114.000 $1.000 $80.000 $10.000 $360.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 35.000 $1,250.000 $800.000 $1,300.000 $2,500.000 $2,500.000
REPLACE CABLE (TL-4)
LF 59.000 $3.940 $0.100 $98.000 $5.000 $2.000
CHECK / RE-TENSION CABLE
EA 9.000 $345.000 $1,533.000 $250.000 $500.000 $300.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 39.000 $53.020 $1.000 $50.000 $1.000 $20.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 65.000 $30.000 $40.000 $40.000 $1.000 $50.000
BOX BEAM MEDIAN BARRIER REPAIR
LF 234.000 $50.000 $1.000 $38.000 $1.000 $50.000
BOX BEAM MEDIAN BARRIER POST
EA 23.000 $100.000 $1.000 $140.000 $250.000 $125.000
CONCRETE RAIL REPAIR (MISC)
LF 15.000 $200.000 $1.000 $350.000 $200.000 $100.000
TMA (STATIONARY)
DAY 153.000 $270.000 $3,000.000 $2,000.000 $200.000 $500.000
Totals: $1,438,835.160 $1,098,006.900 $1,305,904.000 $1,666,450.030 $1,666,453.000