Bid Cobra

TAYLOR IH0020 (6328-55-001)

Items: 64

County: TAYLOR
Length: N/A
Highway: IH0020
District: ABILENE
Control Number: 6328-55-001
DBE Goal: N/A
Project: RMC - 632855001
Guaranty: N/A
Time: 360 CALENDAR DAYS
Engineer's Estimate: $1,384,069.00
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: CALL OUT MBGF, ETC.
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,384,069.00
$1,208,009.00
Over/Under Est: -12.72% -$176,060.00
$1,610,998.54
Over/Under Est: 16.4% $226,929.54
Amt Left: 33.36% $402,989.54

Bid Items & Bid Tabulations

64 Total 0 of 64
TAYLOR  |  IH0020  |  ABILENE  |  6328-55-001  |  05/01/2018  |  $1,384,069.00  |  RMC - 632855001  |  CALL OUT MBGF, ETC.  |  360 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
K-BAR SERVICES, INC.
REMOVING CONC (MISC)
CY 40.000 $76.000 $50.000 $300.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 200.000 $125.000 $70.000 $140.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 500.000 $134.000 $55.000 $150.000
CONC STR REPAIR (STANDARD)
SF 500.000 $117.000 $35.000 $150.000
RIPRAP (CONC)(5 IN)
CY 40.000 $446.000 $300.000 $600.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 100.000 $37.000 $25.000 $130.000
STR STEEL (RAILS / POSTS / PLATES)
LB 100.000 $22.000 $5.000 $10.150
HEADER TYPE EXPANSION JOINT
CF 50.000 $464.000 $500.000 $600.000
JOINT SEALANT
LF 200.000 $22.000 $15.000 $60.000
MOBILIZATION (CALLOUT)
EA 35.000 $131.000 $35.000 $2.600
MOBILIZATION (EMERGENCY)
EA 100.000 $148.000 $100.000 $3.780
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,044.000 $600.000 $880.480
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $142.000 $20.000 $50.650
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $24.000 $20.000 $40.180
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $22.000 $1.000 $25.480
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 25.000 $26.000 $1.000 $25.480
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 70.000 $20.000 $20.000 $30.120
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 25.000 $25.000 $1.000 $25.480
INSTL DEL ASSM (D-SR)SZ 1(BRF)GF2
EA 10.000 $25.000 $1.000 $25.480
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 25.000 $6.000 $1.000 $25.480
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 25.000 $5.000 $1.000 $25.480
REPAIR RAIL ELEMENT (W - BEAM)
LF 17,000.000 $17.000 $15.750 $22.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $24.000 $35.000 $101.230
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 20.000 $27.000 $35.000 $101.230
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 250.000 $34.000 $18.000 $28.150
RAISE RAIL ELEMENT
LF 25.000 $4.000 $5.000 $8.800
REM / REPL TIMBER/STL POST W/O CONC FND
EA 500.000 $23.000 $40.000 $62.150
REM / REPL TIMBER / STL POST W/CONC FND
EA 400.000 $23.000 $50.000 $83.450
REALIGN POSTS
EA 600.000 $18.000 $15.000 $5.150
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 600.000 $8.000 $6.500 $5.986
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $16.000 $20.000 $20.150
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $51.000 $50.000 $84.150
REPAIR OF TERMINAL ANCHORS POSTS
EA 2.000 $63.000 $1.000 $80.150
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $89.000 $1.000 $80.150
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $2,437.000 $2,400.000 $2,896.920
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 30.000 $834.000 $850.000 $740.150
REM & RESET SGT IMPACT HEAD
EA 50.000 $103.000 $100.000 $354.450
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $74.000 $1.000 $612.150
REPLACE SGT CABLE ANCHOR
EA 5.000 $79.000 $1.000 $612.150
REPLACE SGT STRUT
EA 5.000 $82.000 $1.000 $812.450
REPLACE SGT OBJECT MARKER
EA 25.000 $15.000 $30.000 $312.640
REPLACE POSTS (TL-4)
EA 3,000.000 $130.000 $150.000 $115.480
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $111.000 $1.000 $200.150
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $55.000 $10.000 $301.470
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $845.000 $500.000 $859.000
REPLACE CABLE (TL-4)
LF 200.000 $3.000 $2.000 $8.450
CHECK / RE-TENSION CABLE
EA 20.000 $69.000 $150.000 $105.050
REMOVE AND REPLACE (TRACC)
EA 5.000 $4,000.000 $500.000 $3,059.990
REMOVE AND REPLACE (WIDE TRACC)
EA 5.000 $2,000.000 $500.000 $2,198.480
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $3,000.000 $500.000 $1,589.890
REPAIR (TRACC)
LF 50.000 $70.000 $50.000 $259.480
REPAIR (WIDE TRACC)
EA 50.000 $55.000 $100.000 $50.780
REPAIR (NARROW REACT 350)
LF 50.000 $100.000 $50.000 $309.680
REMOVE AND REPLACE (FASTRACC)
EA 5.000 $4,000.000 $500.000 $1,145.780
REPAIR (FASTRACC)
LF 50.000 $100.000 $50.000 $51.240
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 10.000 $30.000 $30.000 $284.470
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 10.000 $55.000 $30.000 $289.480
BOX BEAM MEDIAN BARRIER REPAIR
LF 100.000 $125.000 $5.000 $105.240
BOX BEAM MEDIAN BARRIER POST
EA 10.000 $149.000 $200.000 $214.150
CONCRETE RAIL REPAIR (MISC)
LF 10.000 $141.000 $200.000 $356.610
CONCRETE POST REPAIR
EA 5.000 $217.000 $100.000 $457.780
CONCRETE POST REPLACEMENT
EA 5.000 $290.000 $100.000 $302.150
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $200.000 $50.000 $48.780
TMA (STATIONARY)
DAY 100.000 $275.000 $100.000 $575.150
Totals: $1,384,069.000 $1,208,009.000 $1,610,998.540