Show Job Controls
Bid Cobra

TAYLOR S 14TH ST (0908-33-115)

Items: 52

County: TAYLOR
Length: 0.0000 MILES
Highway: S 14TH ST
District: ABILENE
Control Number: 0908-33-115
DBE Goal: 0.0%
Project: STP 2025(989)HESG
Guaranty: $7,000.00
Time: 77 WORKING DAYS
Engineer's Estimate: $414,754.57
Date: 06/02/2026 (8 days ago) Changed
Contract Number: 6263229
Type: SIGNAL IMPROVEMENTS,LEDS & GPS CLOCKS
Project ID: A00213529
Contract Type: Federal
Project Description: IMPROVE TRAFFIC SIGNALS & INSTALL FLASHING YELLOW ARROW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
PAUL NORMAN
RYAN CARRIGAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$414,754.57
Over/Under Est: -19.83% -$82,227.82

Bid Items & Bid Tabulations

52 Total 0 of 52
TAYLOR  |  S 14TH ST  |  ABILENE  |  0908-33-115  |  06/02/2026  |  $414,754.57  |  STP 2025(989)HESG  |  SIGNAL IMPRVS,LEDS & GPS CLOCKS  |  77 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIS ELECTRIC CO., LP
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 11.000 $300.000 $460.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 26.000 $475.000 $515.000
MOBILIZATION
LS 1.000 $20,000.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $11,704.000 $4,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,209.550 $600.000
TMA (STATIONARY)
DAY 18.000 $276.780 $165.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 20.000 $5.840 $75.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $1.250 $30.000
CONDT (PVC) (SCH 80) (4")
LF 85.000 $30.870 $65.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 155.000 $39.740 $72.000
CONDUIT (PREPARE)
LF 970.000 $4.060 $2.000
ELEC CONDR (NO.12) INSULATED
LF 240.000 $1.500 $2.000
ELEC CONDR (NO.8) INSULATED
LF 680.000 $1.960 $2.500
ELEC CONDR (NO.6) BARE
LF 240.000 $2.000 $3.250
GROUND BOX TY C (162911)W/APRON
EA 2.000 $2,000.000 $2,500.000
ALUMINUM SIGNS (TY A)
SF 116.000 $65.930 $60.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 240.000 $7.000 $8.600
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 140.000 $14.000 $24.200
PAVEMENT SLER 4"
LF 925.000 $1.750 $1.150
PAVEMENT SLER 8"
LF 240.000 $0.570 $2.000
PAVEMENT SLER 24"
LF 140.000 $4.280 $4.650
PAVEMENT SLER (ARROW)
EA 2.000 $110.000 $75.000
PAVEMENT SLER (WORD)
EA 2.000 $82.500 $83.000
REFL PAV MRK TY I (Y)4"(SLD)(090MIL)
LF 925.000 $3.700 $4.750
PREFAB PM TY C (W)(ARROW)
EA 2.000 $261.940 $450.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $314.900 $660.000
REFL PAV MRKR TY I-C
EA 13.000 $5.160 $13.500
REFL PAV MRKR TY II-A-A
EA 46.000 $4.330 $13.500
ELIM EXT PM & MRKS (24")
LF 235.000 $4.590 $5.000
ELIM EXT PM & MRKRS (PLOWABLE RPMS)
EA 510.000 $1.000 $1.650
PAV SURF PREP FOR MRK (4")
LF 925.000 $0.390 $0.010
PAV SURF PREP FOR MRK (8")
LF 240.000 $0.340 $0.010
PAV SURF PREP FOR MRK (24")
LF 140.000 $1.910 $0.100
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $11.000 $1.650
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $11.000 $1.650
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $35,000.000 $46,500.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $8,125.000 $7,300.000
INSTALL HWY TRF SIG (UPGRADE)
EA 12.000 $5,452.330 $1,500.000
VEH SIG SEC (12")LED(GRN ARW)
EA 12.000 $350.000 $355.000
VEH SIG SEC (12")LED(YEL ARW)
EA 24.000 $350.000 $355.000
VEH SIG SEC (12")LED(RED ARW)
EA 12.000 $350.000 $355.000
PED SIG SEC (LED)(COUNTDOWN)
EA 2.000 $962.500 $875.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 785.000 $3.370 $5.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,510.000 $3.510 $5.500
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 285.000 $6.740 $10.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 40.000 $2.500 $3.000
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $14,000.000 $14,500.000
INS TRF SIG PL AM(S)1 ARM(40')
EA 1.000 $14,500.000 $15,400.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $15,500.000 $19,400.000
PED POLE ASSEMBLY
EA 1.000 $4,050.000 $4,100.000
PED DETECT PUSH BUTTON (APS)
EA 2.000 $1,150.000 $975.000
MODIFY EXISTING ELECTRICAL SERVICE
EA 1.000 $3,500.000 $1,500.000
Totals: $414,754.570 $332,526.750
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $20,000.00