TAYLOR CS (0908-33-101)

Items: 42

County: TAYLOR
Length: N/A
Highway: CS
District: ABILENE
Control Number: 0908-33-101
DBE Goal: N/A
Project: BR 2021(070)
Guaranty: N/A
Time: 73 WORKING DAYS
Engineer's Estimate: $989,566.80
Date: 09/02/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (7)
E
Engineer's Estimate
$989,566.80
$786,840.99
Over/Under Est: -20.49% -$202,725.81
Over/Under Est: -4.99% -$49,360.80
Amt Left: 19.49% $153,365.01
Over/Under Est: -1.93% -$19,060.80
Amt Left: 23.34% $183,665.01
Delta: -3.22% -$30,300.00
Over/Under Est: 1.87% $18,521.20
Amt Left: 28.12% $221,247.01
Delta: -3.87% -$37,582.00
Over/Under Est: 3.06% $30,292.20
Amt Left: 29.61% $233,018.01
Delta: -1.17% -$11,771.00
$1,065,839.00
Over/Under Est: 7.71% $76,272.20
Amt Left: 35.46% $278,998.01
Delta: -4.51% -$45,980.00
Over/Under Est: 19.11% $189,130.60
Amt Left: 49.8% $391,856.41
Delta: -10.59% -$112,858.40

Bid Items & Bid Tabulations

42 Total 0 of 42
TAYLOR  |  CS  |  ABILENE  |  0908-33-101  |  09/02/2021  |  $989,566.80  |  BR 2021(070)  |  BRIDGE REPL  |  73 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
DIGG COMMERCIAL, LLC
COPPELL CONSTRUCTION CO., INC.
DELGADO'S CONTRACTORS, LLC
O. TREVINO CONSTRUCTION, LLC
EARTH BUILDERS, L.P.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 2.700 $2,500.000 $4,334.000 $5,000.000 $10,000.000 $2,000.000 $10,000.000 $15,000.000 $15,000.000
REMOVING CONC (DRIVEWAYS)
SY 126.000 $15.000 $77.000 $53.000 $55.000 $30.000 $50.000 $10.000 $40.000
REMOVING CONC (CURB AND GUTTER)
LF 393.000 $7.000 $24.430 $8.000 $15.000 $10.000 $40.000 $5.000 $20.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 70.000 $15.000 $119.000 $50.000 $15.000 $30.000 $40.000 $10.000 $50.000
REMOVING STAB BASE AND ASPH PAV(7"-10")
SY 597.000 $4.000 $18.600 $12.000 $10.000 $11.000 $40.000 $10.000 $20.000
EXCAVATION (ROADWAY)
CY 134.000 $15.000 $69.000 $40.000 $25.000 $12.000 $40.000 $40.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 23.000 $17.000 $353.000 $66.000 $100.000 $50.000 $150.000 $50.000 $50.000
BLOCK SODDING
SY 408.000 $12.000 $8.000 $7.000 $6.500 $10.000 $7.000 $15.000 $12.000
BROADCAST SEED (TEMP) (WARM)
SY 204.000 $0.300 $20.000 $4.000 $7.000 $2.000 $7.000 $6.000 $10.000
BROADCAST SEED (TEMP) (COOL)
SY 204.000 $0.300 $20.000 $4.000 $7.000 $2.000 $7.000 $6.000 $10.000
VEGETATIVE WATERING
MG 21.400 $16.000 $10.000 $20.000 $80.000 $25.000 $45.000 $40.000 $1.000
CEM STABIL BKFL
CY 102.000 $160.000 $300.000 $220.000 $400.000 $175.000 $400.000 $350.000 $300.000
RIPRAP (CONC)(4 IN)
CY 57.000 $470.000 $584.000 $600.000 $725.000 $550.000 $710.000 $800.000 $700.000
RAIL (TY PR11)
LF 154.000 $85.000 $150.000 $176.000 $175.000 $175.000 $125.000 $200.000 $500.000
CONC BOX CULV (8 FT X 8 FT)
LF 322.000 $1,400.000 $450.000 $1,300.000 $1,100.000 $1,400.000 $830.000 $1,100.000 $1,100.000
CONC BOX CULV (10 FT X 9 FT)
LF 46.000 $1,500.000 $400.000 $1,400.000 $1,400.000 $1,600.000 $1,000.000 $1,600.000 $2,600.000
RC PIPE (CL III)(12 IN)
LF 20.000 $65.000 $486.000 $120.000 $150.000 $100.000 $120.000 $100.000 $80.000
RC PIPE (CL III)(24 IN)
LF 16.000 $100.000 $486.000 $140.000 $175.000 $125.000 $450.000 $150.000 $120.000
WINGWALL (FW - S) (HW=10 FT)
EA 2.000 $45,000.000 $34,000.000 $12,000.000 $39,000.000 $25,000.000 $40,000.000 $54,000.000 $30,000.000
REMOV STR (PIPE)
LF 20.000 $16.000 $405.000 $30.000 $45.000 $15.000 $25.000 $10.000 $500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $25,000.000 $50,000.000 $42,000.000 $25,000.000 $100,000.000 $50,000.000 $40,000.000
REMOVE STR (RAIL)
LF 150.000 $17.000 $25.000 $10.000 $25.000 $30.000 $50.000 $10.000 $10.000
MOBILIZATION
LS 1.000 $84,803.000 $75,000.000 $90,000.000 $95,000.000 $50,000.000 $100,000.000 $115,000.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,000.000 $3,100.000 $5,000.000 $2,000.000 $2,550.000 $5,000.000 $5,000.000 $13,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 30.000 $60.000 $60.000 $65.000 $55.000 $75.000 $80.000 $50.000 $1.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $10.000 $5.000 $10.000 $10.000 $10.000 $15.000 $10.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 90.000 $7.000 $10.000 $6.000 $5.000 $10.000 $5.000 $10.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 90.000 $1.000 $2.000 $2.000 $1.000 $1.000 $1.000 $1.000 $1.000
CONC CURB & GUTTER (TY I)
LF 12.000 $45.000 $75.000 $60.000 $125.000 $30.000 $60.000 $50.000 $50.000
CONC CURB & GUTTER (TY II)
LF 424.000 $47.000 $50.000 $34.000 $32.000 $25.000 $60.000 $40.000 $50.000
DRIVEWAYS (CONC)
SY 138.000 $100.000 $125.000 $110.000 $114.000 $80.000 $130.000 $100.000 $80.000
CONC SIDEWALKS (4")
SY 206.000 $70.000 $75.000 $70.000 $88.000 $55.000 $80.000 $80.000 $100.000
CHAIN LINK FENCE (REMOVE)
LF 50.000 $10.000 $10.000 $15.000 $20.000 $10.000 $20.000 $5.000 $5.000
CHAIN LINK FENCE (INSTALL)(5')
LF 50.000 $80.000 $250.000 $50.000 $50.000 $50.000 $65.000 $50.000 $200.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $200.000 $500.000 $800.000 $350.000 $750.000 $500.000 $500.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $300.000 $2,000.000 $700.000 $412.000 $750.000 $1,400.000 $1,000.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $50.000 $400.000 $127.000 $175.000 $115.000 $50.000 $100.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 4.000 $210.000 $400.000 $80.000 $76.000 $88.000 $115.000 $200.000 $100.000
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 540.000 $1.000 $10.000 $6.000 $5.000 $33.000 $30.000 $5.000 $10.000
D-GR HMA TY-B PG64-22
TON 317.000 $200.000 $325.000 $145.000 $163.000 $335.000 $200.000 $200.000 $250.000
D-GR HMA TY-D PG70-22
TON 178.000 $200.000 $325.000 $180.000 $200.000 $335.000 $235.000 $200.000 $250.000
TACK COAT
GAL 203.000 $5.000 $20.000 $7.000 $15.000 $35.000 $18.000 $10.000 $10.000
Totals: $989,566.800 $786,840.990 $940,206.000 $970,506.000 $1,008,088.000 $1,019,859.000 $1,065,839.000 $1,178,697.400