Show Job Controls
Bid Cobra

TAYLOR SL 322 (0908-00-130)

Items: 21

County: TAYLOR
Length: N/A
Highway: SL 322
District: ABILENE
Control Number: 0908-00-130
DBE Goal: 0.0%
Project: F 2B24(142)
Guaranty: N/A
Time: 67 WORKING DAYS
Engineer's Estimate: $1,113,372.00
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: INSTALL INTELLIGENT VEHICLE HIGHWAY SYSTEM
Mail/Deliver Bids To: N/A
RANDEE SHIELDS
RYAN CARRIGAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,113,372.00
Over/Under Est: 8% $89,119.22
$1,589,199.60
Over/Under Est: 42.74% $475,827.60
Amt Left: 32.16% $386,708.38
Subcontractor Percentage Amount
DALLAS LITE AND BARRICADE, INC. 2.85% $34,271.00
JC DIRECTIONAL DRILLING 0.81% $9,740.18
Total: 3.66% $44,011.18

Bid Items & Bid Tabulations

21 Total 0 of 21
TAYLOR  |  SL 322  |  ABILENE  |  0908-00-130  |  06/05/2024  |  $1,113,372.00  |  F 2B24(142)  |  INSTL INTELLIGENT VEHICLE HWY SYSTEM  |  67 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FLORIDA TRAFFIC CONTROL DEVICES, INC.
MICA CORPORATION
REMOVING CONC (RIPRAP)
SY 10.000 $45.000 $306.690 $330.000
DRILL SHAFT (42 IN)
LF 260.000 $400.000 $997.440 $538.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 54.000 $450.000 $1,133.500 $632.000
RIPRAP (CONC)(4 IN)
CY 15.000 $800.000 $1,469.160 $7,150.000
MOBILIZATION
LS 1.000 $108,000.000 $119,951.000 $144,485.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $15,000.000 $9,845.850 $31,120.000
CONDT (PVC) (SCH 80) (2")
LF 2,170.000 $20.000 $20.620 $44.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 730.000 $30.000 $41.010 $55.000
ELEC CONDR (NO.8) BARE
LF 3,360.000 $2.500 $2.070 $2.750
ELEC CONDR (NO.8) INSULATED
LF 6,224.000 $3.000 $2.380 $2.900
GROUND BOX TY D (162922)W/APRON
EA 40.000 $1,600.000 $1,968.800 $3,300.000
ELC SRV TY D 120/240 060(NS)AL(N)SP(O)
EA 11.000 $8,500.000 $7,729.350 $11,120.000
INS OH SN SUP(30 FT BAL TEE)
EA 2.000 $40,000.000 $75,502.450 $62,625.000
CCTV MOUNT (POLE)
EA 10.000 $15,000.000 $570.870 $4,610.000
CONDUIT (PREPARE)
LF 130.000 $25.000 $5.350 $13.200
GROUND BOX (PREPARE)
EA 2.000 $500.000 $2,183.320 $1,650.000
INSTALL DMS (POLE MTD CABINET)
EA 2.000 $6,000.000 $13,270.800 $65,770.000
ITS POLE (50 FT)(90 MPH)
EA 10.000 $16,500.000 $16,625.160 $16,535.000
ITS POLE MNT CAB (TY 1)(CONF 1)
EA 10.000 $10,000.000 $5,036.430 $6,661.000
TMA (STATIONARY)
DAY 67.000 $300.000 $315.320 $393.000
INSTALLATION OF CELLULAR MODEM
EA 12.000 $700.000 $114.810 $1,760.000
Totals: $1,113,372.000 $1,202,491.220 $1,589,199.600