Show Job Controls
Bid Cobra

TAYLOR VA (0908-00-119)

Items: 35

County: TAYLOR
Length: N/A
Highway: VA
District: ABILENE
Control Number: 0908-00-119
DBE Goal: 0.0%
Project: C 908-00-119
Guaranty: N/A
Time: 171 WORKING DAYS
Engineer's Estimate: $1,355,398.00
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
BRYCE TURENTINE
CHAD W CARTER
RYAN SAYLES
LARISSA HALFORD
STEWART CHAPMAN
MAXIE ALLEN
JOSE CABRERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,355,398.00
Over/Under Est: -6.36% -$86,174.00
Over/Under Est: 7.67% $103,968.76
Amt Left: 14.98% $190,142.76
Over/Under Est: 13.11% $177,710.00
Amt Left: 20.79% $263,884.00
Delta: -5.05% -$73,741.24
Over/Under Est: 17.35% $235,157.00
Amt Left: 25.32% $321,331.00
Delta: -3.75% -$57,447.00
$1,715,434.00
Over/Under Est: 26.56% $360,036.00
Amt Left: 35.16% $446,210.00
Delta: -7.85% -$124,879.00
Subcontractor Percentage Amount
TAYLOR CONTRACTING LLC 47.87% $617,151.53
BARRICADES UNLIMITED 5.50% $70,907.32
S & S BRIDGE PAINTING, INC. 4.63% $59,691.07
Total: 58.00% $747,749.92

Bid Items & Bid Tabulations

35 Total 0 of 35
TAYLOR  |  VA  |  ABILENE  |  0908-00-119  |  05/03/2024  |  $1,355,398.00  |  C 908-00-119  |  BRIDGE MAINT  |  171 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DCC CONSTRUCTION AND SERVICES, L.L.C.
SCR CIVIL CONSTRUCTION, LLC
MB WESTERN INDUSTRIAL CONTRACTING CO.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
ICOS MANAGEMENT, LLC
REMOVING CONC (RIPRAP)
SY 45.000 $80.000 $150.000 $132.000 $35.000 $100.000 $120.000
FLOWABLE BACKFILL
CY 20.000 $500.000 $500.000 $500.000 $650.000 $100.000 $400.000
EPOXY WATERPROOF FINISH (TY X)
SF 3,197.000 $11.000 $7.000 $21.000 $15.000 $20.000 $30.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 20.000 $220.000 $1,000.000 $800.000 $175.000 $350.000 $600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,758.000 $250.000 $150.000 $218.000 $224.000 $325.000 $260.000
RIPRAP (CONC) (CL B) (4")
CY 5.000 $1,200.000 $500.000 $2,180.000 $800.000 $1,000.000 $1,200.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 45.000 $600.000 $300.000 $585.000 $300.000 $250.000 $400.000
ELASTOMERIC BEARING (SPECIAL)
EA 8.000 $3,500.000 $11,000.000 $4,900.000 $13,500.000 $5,000.000 $10,000.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 128.000 $50.000 $50.000 $45.000 $95.000 $80.000 $80.000
CLEANING AND SEALING JOINTS (CL 7)
LF 117.000 $50.000 $50.000 $30.000 $100.000 $80.000 $80.000
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
LF 38.000 $50.000 $50.000 $45.000 $120.000 $85.000 $150.000
STR STEEL (PEDESTAL)
LB 1,390.000 $50.000 $40.000 $25.000 $37.000 $50.000 $50.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
EA 1.000 $15,000.000 $19,200.000 $24,225.000 $23,500.000 $55,000.000 $80,000.000
RAISING EXIST STRUCT
LS 1.000 $50,000.000 $110,000.000 $82,500.000 $193,000.000 $200,000.000 $60,000.000
REMOV STR (SMALL FENCE)
LF 33.000 $12.000 $1.000 $20.000 $20.000 $15.000 $50.000
MOBILIZATION
LS 1.000 $140,000.000 $125,000.000 $145,800.000 $120,000.000 $150,000.000 $160,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,000.000 $9,500.000 $15,050.000 $5,000.000 $4,500.000 $14,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,200.000 $10.000 $15.000 $9.000 $10.000 $10.000 $0.010
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,200.000 $3.000 $1.000 $1.150 $1.500 $2.000 $0.010
WIRE FENCE (TY A)
LF 33.000 $35.000 $20.000 $55.000 $20.000 $50.000 $100.000
REPLACE EXISTING ALUMINUM SIGNS (TY O)
EA 1.000 $200.000 $500.000 $500.000 $500.000 $150.000 $15,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,500.000 $500.000 $8,000.000 $3,000.000 $2,500.000 $4,500.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 1.000 $600.000 $500.000 $4,000.000 $750.000 $1,000.000 $3,500.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 288.000 $20.000 $2.000 $0.010 $7.000 $20.000 $40.000
ELIM EXT PAV MRK & MRKS (24")
LF 288.000 $10.000 $2.000 $0.010 $5.000 $10.000 $20.000
CLEANING / SWEEPING (SPOT)
MI 0.200 $10,000.000 $1,000.000 $23,000.000 $2,500.000 $10,000.000 $10,000.000
REP STL BRIDGE MEMBER (DIAPHRAGM)
EA 2.000 $5,000.000 $3,000.000 $2,840.000 $5,600.000 $10,000.000 $10,000.000
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
EA 1.000 $20,000.000 $65,000.000 $62,200.000 $76,160.000 $65,000.000 $18,000.000
BRIDGE JOINT REPAIR (CONCRETE)
LF 43.000 $350.000 $500.000 $880.000 $450.000 $500.000 $700.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 12.000 $675.000 $500.000 $1,880.000 $425.000 $650.000 $1,400.000
CARBON FIBER REINF POLYMER PROTECTION
SF 132.000 $145.000 $100.000 $100.000 $150.000 $175.000 $200.000
REPLACE ELASTOMERIC BEARING PADS
EA 22.000 $8,500.000 $10,000.000 $9,975.000 $12,500.000 $5,000.000 $14,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $13,000.000 $5,000.000 $6,050.000 $5,000.000 $5,000.000 $8,000.000
TMA (STATIONARY)
DAY 169.000 $300.000 $300.000 $225.000 $200.000 $250.000 $10.000
CLEANING STRUCTURE (ABUTMENT)
EA 6.000 $2,000.000 $1,300.000 $2,000.000 $450.000 $1,200.000 $2,000.000
Totals: $1,355,398.000 $1,269,224.000 $1,459,366.760 $1,533,108.000 $1,590,555.000 $1,715,434.000