Show Job Controls
Bid Cobra

TAYLOR VA (0908-00-112)

Items: 26

County: TAYLOR
Length: N/A
Highway: VA
District: ABILENE
Control Number: 0908-00-112
DBE Goal: N/A
Project: F 2023(165)
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $1,090,239.00
Date: 12/02/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,090,239.00
$1,087,689.00
Over/Under Est: -0.23% -$2,550.00
Over/Under Est: 38.06% $414,955.36
Amt Left: 38.38% $417,505.36
Over/Under Est: 46.8% $510,249.50
Amt Left: 47.15% $512,799.50
Delta: -6.33% -$95,294.14
Over/Under Est: 51.59% $562,486.00
Amt Left: 51.95% $565,036.00
Delta: -3.26% -$52,236.50
$2,237,180.00
Over/Under Est: 105.2% $1,146,941.00
Amt Left: 105.68% $1,149,491.00
Delta: -35.36% -$584,455.00

Bid Items & Bid Tabulations

26 Total 0 of 26
TAYLOR  |  VA  |  ABILENE  |  0908-00-112  |  12/02/2022  |  $1,090,239.00  |  F 2023(165)  |  BRIDGE MAINT  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
GIBSON & ASSOCIATES, INC.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
FNH CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 18.000 $50.000 $149.000 $218.830 $144.000 $25.000 $100.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 180.000 $30.000 $30.000 $117.180 $360.000 $100.000 $50.000
BULLDOZER WORK
HR 20.000 $300.000 $149.000 $371.210 $540.000 $550.000 $250.000
FLOWABLE BACKFILL
CY 25.000 $400.000 $320.000 $965.900 $420.000 $500.000 $350.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,418.000 $15.000 $33.000 $27.570 $27.500 $30.000 $30.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 400.000 $115.000 $90.000 $90.430 $87.000 $100.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,680.000 $220.000 $149.000 $172.180 $226.600 $150.000 $350.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 4.000 $800.000 $199.000 $1,197.540 $660.000 $1,700.000 $1,000.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 120.000 $300.000 $199.000 $343.660 $336.000 $500.000 $185.000
BEDDING MATERIAL (3 IN)
CY 5.000 $200.000 $164.000 $758.230 $216.000 $1,200.000 $1,000.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 387.000 $50.000 $39.000 $85.260 $71.500 $75.000 $100.000
STR STEEL (MISC NON - BRIDGE)
LB 472.000 $15.000 $33.000 $70.650 $40.000 $85.000 $35.000
STR STEEL (PEDESTAL)
LB 2,489.000 $15.000 $83.000 $22.580 $30.000 $110.000 $30.000
CLEAN & PAINT EXIST PILING (SYSTEM II)
LS 1.000 $10,000.000 $27,500.000 $26,292.280 $22,000.000 $25,000.000 $40,000.000
HEADER TYPE EXPANSION JOINT
CF 8.000 $500.000 $440.000 $890.760 $544.500 $1,000.000 $850.000
JOINT SEALANT
LF 52.000 $50.000 $20.000 $44.340 $24.750 $75.000 $100.000
MICROMILLING CONCRETE SLAB (2 IN)
SY 800.000 $45.000 $33.000 $48.290 $36.300 $125.000 $35.000
MOBILIZATION
LS 1.000 $70,000.000 $1.000 $150,519.250 $278,000.000 $175,000.000 $106,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,000.000 $3,300.000 $6,230.590 $12,000.000 $2,500.000 $8,500.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 300.000 $80.000 $28.000 $25.870 $59.400 $25.000 $100.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 500.000 $115.000 $55.000 $40.300 $55.000 $35.000 $100.000
REPAIR STEEL (CORROSION MITIGATION)
EA 12.000 $2,917.000 $3,850.000 $3,400.430 $5,900.000 $2,000.000 $15,000.000
POLYESTER POLYMER CONC OVERLAY (2")
SY 800.000 $205.000 $220.000 $544.030 $281.000 $450.000 $700.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $18,000.000 $49,500.000 $48,792.280 $46,750.000 $60,000.000 $65,000.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $2,000.000 $14,300.000 $16,292.280 $11,000.000 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 180.000 $300.000 $330.000 $308.290 $215.000 $220.000 $250.000
Totals: $1,090,239.000 $1,087,689.000 $1,505,194.360 $1,600,488.500 $1,652,725.000 $2,237,180.000