TAYLOR FM 89 (0699-01-065)

Items: 87

County: TAYLOR
Length: 3.3120 MILES
Highway: FM 89
District: ABILENE
Control Number: 0699-01-065
DBE Goal: 0.0%
Project: STP 2026(427)HES
Guaranty: $100,000.00
Time: 234 WORKING DAYS
Engineer's Estimate: $6,239,737.10
Date: 03/04/2026 (3 months ago)
Contract Number: 3263009
Type: WIDEN ROAD - ADD LANES AND SHOULDERS
Project ID: A00193354
Contract Type: Federal
Project Description: ADD CONTINUOUS CENTER TURN LANES AND RIGHT TURN LANES AT INTERSECTION.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE TURENTINE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$6,239,737.10
$6,284,525.46
Over/Under Est: 0.72% $44,788.36
$6,362,077.97
Over/Under Est: 1.96% $122,340.87
Amt Left: 1.23% $77,552.51
$6,941,805.50
Over/Under Est: 11.25% $702,068.40
Amt Left: 10.46% $657,280.04
Delta: -9.11% -$579,727.53
$7,739,939.27
Over/Under Est: 24.04% $1,500,202.17
Amt Left: 23.16% $1,455,413.81
Delta: -11.50% -$798,133.77
$7,942,078.30
Over/Under Est: 27.28% $1,702,341.20
Amt Left: 26.38% $1,657,552.84
Delta: -2.61% -$202,139.03

Bid Items & Bid Tabulations

87 Total 0 of 87
TAYLOR  |  FM 89  |  ABILENE  |  0699-01-065  |  03/04/2026  |  $6,239,737.10  |  STP 2026(427)HES  |  WIDEN ROAD - ADD LANES AND SHOULDERS  |  234 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
REECE ALBERT, INC.
CK NEWBERRY, LLC
GILVIN-TERRILL, LTD.
A. L. HELMCAMP, INC.
REMOV CONC (RIPRAP)
SY 3.000 $30.000 $225.000 $154.690 $500.000 $25.000 $250.000
REMOV CONC (DRIVEWAYS)
SY 1,478.000 $30.000 $15.000 $11.600 $35.000 $25.000 $40.000
EXCAV (ROADWAY)
CY 16,872.000 $15.000 $12.750 $10.960 $22.000 $25.000 $16.000
EMBANK (FNL)(DC)(TY A)
CY 7,624.000 $20.000 $14.000 $4.400 $15.000 $25.000 $22.000
BROADCAST SEED (PERM_RURAL_CLAY)
AC 14.200 $1,800.000 $1,000.000 $806.700 $725.000 $1,500.000 $790.000
VEGETATIVE WATERING
TGL 919.000 $10.000 $50.000 $47.850 $25.000 $42.000 $40.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,298.000 $76.000 $62.000 $70.140 $80.000 $90.000 $70.000
PRIME COAT (MC-30)
GAL 5,038.000 $5.000 $7.000 $5.880 $8.000 $10.000 $8.000
SP MIXES SP-C SAC-B PG70-22
TON 18,991.000 $120.000 $120.960 $142.780 $128.000 $140.000 $150.000
TACK COAT
GAL 19,075.000 $3.500 $5.000 $2.320 $5.000 $6.000 $5.000
PLANE ASPH CONC PAV(0" TO 2")
SY 15,806.000 $3.000 $2.250 $5.230 $3.000 $2.000 $7.000
PLANE ASPH CONC PAV(0" TO 3")
SY 3,967.000 $3.000 $3.750 $4.210 $3.000 $2.000 $7.000
PLANE ASPH CONC PAV(3")
SY 3,890.000 $3.000 $3.750 $4.050 $3.000 $2.000 $7.000
CUT & RESTORING PAV
SY 60.000 $150.000 $195.000 $74.720 $125.000 $200.000 $100.000
FLOWABLE BACKFILL
CY 27.000 $450.000 $280.000 $335.080 $225.000 $600.000 $320.000
TRENCH EXCAVATION PROTECTION
LF 80.000 $5.000 $120.000 $1.340 $50.000 $50.000 $55.000
CL A CONC (PLUG)
EA 2.000 $2,000.000 $4,500.000 $680.810 $5,000.000 $3,000.000 $2,600.000
CL B CONC (MISC)
CY 32.000 $900.000 $650.000 $340.540 $500.000 $800.000 $1,100.000
RIPRAP (CONC)(5 IN)
CY 123.000 $250.000 $775.000 $1,706.950 $625.000 $700.000 $900.000
RIPRAP (MOW STRIP)(4 IN)
CY 194.000 $200.000 $725.000 $641.090 $650.000 $700.000 $900.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 198.000 $250.000 $200.000 $595.770 $225.000 $500.000 $275.000
RETROFIT RAIL (TY T131RC)
LF 562.000 $50.000 $260.000 $251.090 $275.000 $185.000 $205.000
CMP AR (GAL STL DES 4)
LF 16.000 $475.000 $210.000 $184.220 $325.000 $500.000 $265.000
RC PIPE (CL III)(24 IN)
LF 1,608.000 $130.000 $135.000 $100.280 $125.000 $135.000 $125.000
RC PIPE (CL III)(30 IN)
LF 1,002.000 $120.000 $195.000 $114.140 $150.000 $170.000 $170.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $9,000.000 $2,200.000 $1,319.590 $5,500.000 $2,500.000 $2,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 50.000 $2,677.000 $2,650.000 $1,575.890 $3,000.000 $2,750.000 $2,300.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $11,000.000 $5,550.000 $1,824.140 $5,500.000 $3,000.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 34.000 $4,000.000 $6,200.000 $3,749.640 $3,500.000 $3,500.000 $4,300.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 2.000 $4,000.000 $2,700.000 $4,103.490 $6,000.000 $5,500.000 $3,000.000
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III)
LF 132.000 $1,700.000 $2,830.000 $1,589.210 $2,000.000 $2,000.000 $2,200.000
REMOV STR (SET)
EA 30.000 $1,065.000 $600.000 $414.520 $1,500.000 $1,100.000 $530.000
REMOV STR (PIPE)
LF 750.000 $50.000 $15.000 $13.800 $50.000 $50.000 $25.000
MOBILIZATION
LS 1.000 $545,000.000 $285,000.000 $421,212.770 $650,000.000 $770,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $15,000.000 $10,000.000 $3,642.180 $20,000.000 $21,000.000 $29,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $8,500.000 $7,346.980 $12,000.000 $18,500.000 $20,000.000
TMA (STATIONARY)
DAY 234.000 $280.000 $275.000 $39.320 $350.000 $470.000 $250.000
TMA (MOBILE OPERATION)
DAY 28.000 $500.000 $275.000 $609.870 $100.000 $470.000 $400.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 20.000 $100.000 $125.000 $153.450 $95.000 $95.000 $125.000
ROCK FILTER DAMS (REMOVE)
LF 20.000 $15.000 $50.000 $55.170 $25.000 $55.000 $36.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,025.000 $6.500 $5.000 $5.080 $7.000 $5.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,025.000 $2.000 $1.500 $0.530 $2.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 960.000 $10.000 $7.500 $6.140 $10.000 $7.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 960.000 $2.800 $2.000 $1.600 $2.000 $1.000 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,080.000 $40.000 $120.000 $116.640 $115.000 $80.000 $95.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,080.000 $15.000 $18.000 $4.320 $10.000 $10.000 $40.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,080.000 $15.000 $25.000 $15.820 $20.000 $20.000 $40.000
INTERSECTIONS (CONC)
SY 1,101.000 $125.000 $167.000 $137.230 $80.000 $150.000 $215.000
INTERSECTIONS (ACP)
SY 134.000 $30.000 $45.000 $113.790 $25.000 $50.000 $100.000
DRIVEWAYS (CONC)
SY 263.000 $100.000 $167.000 $153.450 $120.000 $150.000 $190.000
DRIVEWAYS (BASE)
SY 5,505.000 $25.000 $15.000 $33.440 $25.000 $40.000 $40.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 34,111.000 $0.250 $0.250 $0.240 $0.250 $0.600 $0.560
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 1,075.000 $0.250 $0.280 $0.270 $0.250 $0.600 $0.560
MTL W-BEAM GD FEN (TIM POST)
LF 1,487.500 $35.000 $31.000 $29.380 $30.000 $24.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,500.000 $4,760.000 $4,541.040 $5,000.000 $1,900.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 2,200.000 $3.500 $2.200 $2.140 $2.000 $3.500 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,500.000 $3,920.000 $3,739.680 $4,000.000 $3,100.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $250.000 $28.000 $26.710 $25.000 $275.000 $600.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,500.000 $2,250.000 $1,705.330 $2,000.000 $825.000 $1,000.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $500.000 $1,700.000 $1,705.330 $1,500.000 $825.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $6,500.000 $13,500.000 $2,945.330 $15,000.000 $5,825.000 $9,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 37.000 $350.000 $320.000 $270.330 $250.000 $250.000 $260.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 30.000 $800.000 $745.000 $709.470 $1,000.000 $950.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $975.000 $940.000 $895.390 $1,000.000 $950.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,000.000 $1,100.000 $958.430 $1,000.000 $950.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000 $1,025.000 $1,300.000 $1,233.030 $1,000.000 $950.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 30.000 $115.000 $110.000 $93.000 $100.000 $100.000 $110.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 58.000 $55.000 $55.000 $48.080 $80.000 $80.000 $85.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 33.000 $55.000 $51.000 $48.080 $80.000 $40.000 $45.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $150.000 $61.000 $57.700 $80.000 $80.000 $85.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 4.000 $200.000 $200.000 $160.270 $175.000 $75.000 $80.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 56,174.000 $1.000 $0.200 $0.620 $0.250 $0.500 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,395.000 $2.000 $2.250 $2.520 $1.000 $1.000 $0.750
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 952.000 $1.300 $1.350 $1.600 $1.250 $0.950 $1.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 34,507.000 $1.300 $0.570 $0.590 $0.500 $0.600 $0.640
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 6,909.000 $1.300 $0.570 $0.600 $0.500 $0.610 $0.650
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 36,579.000 $1.300 $0.570 $0.590 $0.500 $0.600 $0.640
PREFAB PM TY C (W)(24")(SLD)
LF 178.000 $25.000 $22.500 $15.390 $20.000 $17.500 $19.000
PREFAB PM TY C (W)(ARROW)
EA 52.000 $270.000 $255.000 $229.720 $225.000 $200.000 $220.000
PREFAB PM TY C (W)(WORD)
EA 4.000 $350.000 $255.000 $459.450 $225.000 $240.000 $250.000
REFL PAV MRKR TY I-C
EA 37.000 $6.000 $5.650 $8.550 $5.000 $5.500 $6.000
REFL PAV MRKR TY II-A-A
EA 1,027.000 $7.000 $5.650 $6.140 $5.000 $5.500 $6.000
ELIM EXT PM & MRKS (4")
LF 34,612.000 $1.000 $0.300 $0.370 $0.250 $0.640 $0.650
ELIM EXT PM & MRKS (24")
LF 640.000 $5.000 $3.400 $3.210 $3.000 $4.000 $4.500
ELIM EXT PM & MRKS (ARROW)
EA 6.000 $85.000 $115.000 $106.850 $100.000 $80.000 $85.000
ELIM EXT PM & MRKS (TPL ARROW)
EA 3.000 $85.000 $1,650.000 $106.850 $125.000 $80.000 $85.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 123.000 $10.000 $40.000 $4.760 $40.000 $100.000 $75.000
Totals: $6,239,737.100 $6,284,525.460 $6,362,077.970 $6,941,805.500 $7,739,939.270 $7,942,078.300
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $15,000.00