TAYLOR FM 89 (0699-01-055)

Items: 45

County: TAYLOR
Length: N/A
Highway: FM 89
District: ABILENE
Control Number: 0699-01-055
DBE Goal: N/A
Project: C 699-1-55
Guaranty: N/A
Time: 100 WORKING DAYS
Engineer's Estimate: $1,857,958.94
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: MILL AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,857,958.94
$1,793,003.06
Over/Under Est: -3.5% -$64,955.88
Over/Under Est: 4.8% $89,133.91
Amt Left: 8.59% $154,089.79
Over/Under Est: 20.31% $377,395.31
Amt Left: 24.67% $442,351.19
Delta: -14.80% -$288,261.40
$2,251,565.69
Over/Under Est: 21.18% $393,606.75
Amt Left: 25.58% $458,562.63
Delta: -0.73% -$16,211.44

Bid Items & Bid Tabulations

45 Total 0 of 45
TAYLOR  |  FM 89  |  ABILENE  |  0699-01-055  |  03/06/2019  |  $1,857,958.94  |  C 699-1-55  |  MILL AND OVERLAY  |  100 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
J. H. STRAIN & SONS, INC.
NOBLES ROAD CONSTRUCTION, INC.
REECE ALBERT, INC.
REMOVING CONC (RIPRAP)
SY 9.000 $15.000 $25.000 $30.000 $100.000 $273.330
REMOVING CONC (SIDEWALKS)
SY 15.000 $10.000 $15.000 $30.000 $100.000 $146.330
REMOVING CONC (CURB OR CURB & GUTTER)
LF 73.000 $10.000 $13.000 $30.000 $50.000 $30.710
REMOVING STAB BASE AND ASPH PAV (6")
SY 47.000 $20.000 $15.000 $25.000 $55.000 $36.760
FURNISHING AND PLACING TOPSOIL (4")
SY 43.000 $5.000 $10.000 $15.000 $55.000 $41.490
BLOCK SODDING
SY 43.000 $10.000 $10.000 $15.000 $45.000 $25.820
ASPH (AC-20-5TR)
GAL 32,475.000 $2.000 $3.500 $5.500 $5.000 $3.750
AGGR(TY-PB GR-4 SAC-B)
CY 807.000 $95.000 $105.000 $110.000 $150.000 $147.040
SUPERPAVE MIXTURES SP-D SAC-A PG70-28
TON 10,206.000 $110.000 $113.000 $110.660 $110.000 $126.060
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,700.000 $50.000 $31.980 $28.000 $49.000 $53.370
PLANE ASPH CONC PAV (2")
SY 92,785.000 $1.000 $1.100 $1.250 $1.750 $2.190
SAND BACKFILL
CY 1.000 $30.000 $100.000 $100.000 $320.000 $93.540
RIPRAP (CONC)(4 IN)
CY 1.000 $650.000 $700.000 $650.000 $720.000 $1,670.310
RIPRAP (CONC)(5 IN)
CY 104.000 $550.000 $620.000 $650.000 $605.000 $1,244.300
MOBILIZATION
LS 1.000 $170,000.000 $80,000.000 $100,000.000 $215,000.000 $118,547.970
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $3,000.000 $3,250.000 $11,750.000 $2,792.640
CONC CURB (TY II)
LF 13.000 $25.000 $100.000 $45.000 $114.000 $246.890
CONC CURB & GUTTER (TY I)
LF 24.000 $25.000 $50.000 $45.000 $114.000 $138.320
CONC CURB & GUTTER (TY II)
LF 36.000 $25.000 $50.000 $45.000 $114.000 $96.040
DRIVEWAYS (CONC) (HES)
SY 47.000 $120.000 $100.000 $125.000 $165.000 $327.610
CONC SIDEWALKS (4")
SY 20.000 $48.000 $75.000 $90.000 $94.000 $185.150
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,000.000 $800.000 $750.000 $1,100.000 $826.360
REMOVE SM RD SN SUP&AM
EA 2.000 $95.000 $116.000 $150.000 $500.000 $113.630
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,970.000 $0.300 $0.420 $0.170 $0.350 $0.430
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 5,880.000 $0.250 $0.420 $0.170 $0.350 $0.430
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 27,422.000 $0.230 $0.420 $0.170 $0.350 $0.430
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,203.000 $0.900 $0.750 $2.000 $2.000 $4.050
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,813.000 $0.800 $0.750 $2.000 $2.000 $2.900
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 200.000 $5.250 $1.250 $6.000 $1.000 $1.290
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,825.000 $1.020 $0.900 $1.250 $1.500 $0.930
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 104.000 $7.960 $13.600 $12.000 $8.000 $14.050
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,970.000 $0.340 $0.490 $0.450 $0.750 $0.480
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,400.000 $0.340 $0.490 $1.150 $0.600 $0.510
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,880.000 $0.370 $0.490 $0.450 $1.150 $0.510
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 27,422.000 $0.420 $0.460 $0.450 $0.650 $0.480
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 873.000 $13.500 $13.200 $17.250 $30.000 $13.630
PREFAB PAV MRK TY C (W) (ARROW)
EA 71.000 $270.000 $235.000 $350.000 $360.000 $242.740
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $295.000 $315.000 $350.000 $650.000 $325.380
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 13.000 $42.450 $57.000 $35.000 $200.000 $58.880
REFL PAV MRKR TY I-C
EA 429.000 $3.650 $4.300 $6.000 $12.000 $4.440
REFL PAV MRKR TY II-A-A
EA 810.000 $4.360 $4.300 $6.000 $4.500 $4.440
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 3.000 $15.000 $130.000 $120.000 $500.000 $134.280
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $8,000.000 $20,000.000 $16,500.000 $8,100.620
TMA (STATIONARY)
DAY 176.000 $250.000 $50.000 $250.000 $150.000 $85.040
TMA (MOBILE OPERATION)
DAY 32.000 $250.000 $50.000 $250.000 $500.000 $10.330
Totals: $1,857,958.940 $1,793,003.060 $1,947,092.850 $2,235,354.250 $2,251,565.690