|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
433.000
|
$20.000
|
$30.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
302.000
|
$8.000
|
$6.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
56,493.000
|
$3.000
|
$6.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,067.000
|
$105.000
|
$125.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-B
|
TON
|
13,307.000
|
$130.000
|
$218.550
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,056.000
|
$50.000
|
$60.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
2,784.000
|
$33.000
|
$40.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
|
SY
|
3,630.000
|
$22.000
|
$30.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
79,961.000
|
$3.000
|
$2.250
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
6,934.000
|
$3.000
|
$6.000
|
|
|
PLANE ASPH CONC PAV(1" TO 2")
|
SY
|
34,083.000
|
$3.000
|
$2.150
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
910.000
|
$17.000
|
$3.750
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
188.000
|
$500.000
|
$520.000
|
|
|
JOINT SEALANT
|
LF
|
910.000
|
$15.000
|
$14.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$300,000.000
|
$425,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$13,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$10.000
|
$15.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
140.000
|
$14.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
24.000
|
$3.500
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
24.000
|
$1.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
730.000
|
$5.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
730.000
|
$1.500
|
$5.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
375.000
|
$25.000
|
$50.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
64.000
|
$2.500
|
$15.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
32.000
|
$35.000
|
$27.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
30.000
|
$480.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
35.000
|
$875.000
|
$1,015.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$975.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$750.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
74.000
|
$80.000
|
$125.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
2.000
|
$80.000
|
$125.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
17,840.000
|
$0.200
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
5,500.000
|
$0.350
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
2,360.000
|
$8.000
|
$2.850
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
160.000
|
$50.000
|
$48.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)(RR XING)
|
EA
|
12.000
|
$150.000
|
$285.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
36.000
|
$70.000
|
$61.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
12,220.000
|
$0.200
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
73,926.000
|
$0.230
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
1,316.000
|
$2.500
|
$2.850
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
2,844.000
|
$4.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
3,682.000
|
$4.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
826.000
|
$3.250
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
5,545.000
|
$3.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,844.000
|
$0.700
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,682.000
|
$0.700
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,750.000
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
658.000
|
$7.000
|
$6.750
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,446.000
|
$0.500
|
$1.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
667.000
|
$0.500
|
$1.250
|
|
|
PAVEMENT SEALER 24"
|
LF
|
167.000
|
$2.000
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
8,920.000
|
$0.400
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,110.000
|
$0.400
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
36,963.000
|
$0.400
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
1,180.000
|
$10.000
|
$16.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
80.000
|
$250.000
|
$227.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
18.000
|
$270.000
|
$285.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
6.000
|
$750.000
|
$700.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
576.000
|
$3.000
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,072.000
|
$3.000
|
$4.500
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
381.000
|
$3.500
|
$25.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$250.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
24.000
|
$250.000
|
$500.000
|
|
Totals: |
$3,537,436.880
|
$5,300,067.450
|