REMOVING CONC (CURB)
|
LF
|
128.000
|
$5.000
|
$9.480
|
$15.000
|
$21.000
|
$15.000
|
|
|
|
REMOVING CONC (MISC)
|
SY
|
15.000
|
$20.000
|
$24.000
|
$25.000
|
$150.000
|
$15.000
|
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
838.000
|
$10.000
|
$5.000
|
$10.000
|
$12.000
|
$15.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
20.000
|
$10.000
|
$80.000
|
$40.000
|
$100.000
|
$15.000
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,530.000
|
$0.560
|
$0.250
|
$0.500
|
$0.750
|
$0.750
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,530.000
|
$0.560
|
$0.150
|
$0.500
|
$0.750
|
$0.750
|
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
2,530.000
|
$1.000
|
$0.250
|
$1.000
|
$1.200
|
$1.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
42.700
|
$75.830
|
$65.000
|
$50.000
|
$30.000
|
$120.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
2,015.000
|
$1.500
|
$1.000
|
$3.000
|
$4.500
|
$3.500
|
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
515.000
|
$2.000
|
$2.000
|
$5.500
|
$6.000
|
$3.000
|
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
135,948.000
|
$2.370
|
$3.850
|
$4.250
|
$3.000
|
$3.500
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,516.000
|
$75.000
|
$86.000
|
$107.500
|
$100.000
|
$110.000
|
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
28.000
|
$90.000
|
$100.000
|
$100.000
|
$200.000
|
$100.000
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-B
|
TON
|
31,164.000
|
$115.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,065.000
|
$55.000
|
$55.000
|
$45.640
|
$70.000
|
$50.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
283,246.000
|
$1.180
|
$0.700
|
$0.870
|
$1.400
|
$2.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
84.000
|
$70.000
|
$125.000
|
$175.000
|
$120.000
|
$300.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
129.000
|
$461.090
|
$695.500
|
$650.000
|
$750.000
|
$600.000
|
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
640.000
|
$14.910
|
$16.500
|
$17.000
|
$19.000
|
$20.000
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
214.000
|
$345.000
|
$425.000
|
$475.000
|
$580.000
|
$250.000
|
|
|
|
JOINT SEALANT
|
LF
|
640.000
|
$15.710
|
$15.000
|
$17.000
|
$19.000
|
$25.000
|
|
|
|
GABION MATTRESSES (GALV)(9 IN)
|
SY
|
231.000
|
$60.000
|
$195.000
|
$55.000
|
$190.000
|
$100.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,783.060
|
$550.000
|
$1,000.000
|
$2,300.000
|
$2,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$550,000.000
|
$175,000.000
|
$335,000.000
|
$455,000.000
|
$750,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$6,787.050
|
$5,000.000
|
$5,200.000
|
$6,000.000
|
$35,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
178.000
|
$35.370
|
$15.000
|
$35.000
|
$38.000
|
$35.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
88.000
|
$13.760
|
$8.000
|
$10.000
|
$10.000
|
$15.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
960.000
|
$58.580
|
$10.000
|
$37.000
|
$39.000
|
$80.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$64.270
|
$10.000
|
$42.000
|
$44.000
|
$100.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
960.000
|
$12.520
|
$10.000
|
$12.000
|
$14.000
|
$10.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$16.780
|
$10.000
|
$12.000
|
$14.000
|
$10.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
100.000
|
$110.990
|
$42.000
|
$175.000
|
$240.000
|
$150.000
|
|
|
|
CONC CURB (TY II)
|
LF
|
94.000
|
$27.770
|
$55.000
|
$25.000
|
$80.000
|
$55.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
19,212.000
|
$5.000
|
$4.320
|
$4.000
|
$4.200
|
$3.500
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,400.000
|
$26.080
|
$22.470
|
$22.550
|
$24.000
|
$20.000
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
800.000
|
$30.000
|
$25.680
|
$25.300
|
$27.000
|
$25.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,039.930
|
$1,107.450
|
$1,125.000
|
$1,200.000
|
$1,000.000
|
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
2.000
|
$1,600.000
|
$1,926.000
|
$1,925.000
|
$2,100.000
|
$1,500.000
|
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
3.000
|
$2,500.000
|
$2,086.500
|
$2,100.000
|
$2,300.000
|
$1,600.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,174.000
|
$2.740
|
$3.210
|
$3.000
|
$3.500
|
$2.500
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$259.390
|
$321.000
|
$330.000
|
$350.000
|
$150.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,263.950
|
$2,835.500
|
$2,900.000
|
$3,000.000
|
$2,100.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$293.960
|
$321.000
|
$300.000
|
$350.000
|
$200.000
|
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
785.000
|
$9.440
|
$42.800
|
$44.000
|
$52.000
|
$40.000
|
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
2,350.000
|
$27.210
|
$46.010
|
$48.000
|
$56.000
|
$43.000
|
|
|
|
GROUND BOX TY D (162922)
|
EA
|
38.000
|
$654.500
|
$1,605.000
|
$1,650.000
|
$2,000.000
|
$1,500.000
|
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
3.000
|
$296.190
|
$856.000
|
$825.000
|
$1,000.000
|
$300.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
1.000
|
$32.170
|
$21.400
|
$25.000
|
$25.000
|
$20.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
25.000
|
$28.220
|
$42.800
|
$45.000
|
$45.000
|
$22.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,035.000
|
$1.300
|
$0.520
|
$1.750
|
$0.750
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
3,105.000
|
$1.530
|
$2.000
|
$1.750
|
$0.750
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
438.000
|
$1.340
|
$5.350
|
$5.500
|
$0.700
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8,981.000
|
$0.610
|
$0.800
|
$0.820
|
$0.700
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,198.000
|
$3.000
|
$4.280
|
$4.400
|
$3.000
|
$2.250
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,215.000
|
$5.960
|
$6.420
|
$6.600
|
$6.000
|
$4.500
|
|
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
347.000
|
$6.030
|
$6.420
|
$6.600
|
$6.000
|
$4.500
|
|
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
438.000
|
$1.000
|
$1.070
|
$1.100
|
$0.250
|
$0.300
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
8,981.000
|
$0.270
|
$0.320
|
$0.330
|
$0.250
|
$0.300
|
|
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
1,198.000
|
$1.270
|
$2.140
|
$2.200
|
$2.000
|
$0.450
|
|
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
2,215.000
|
$2.120
|
$3.210
|
$3.300
|
$3.700
|
$0.900
|
|
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
347.000
|
$2.000
|
$2.140
|
$2.200
|
$3.700
|
$0.900
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
16,496.000
|
$0.320
|
$0.300
|
$0.310
|
$0.330
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
53,079.000
|
$0.360
|
$0.300
|
$0.310
|
$0.330
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,994.000
|
$0.380
|
$0.300
|
$0.310
|
$0.330
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
53,204.000
|
$0.360
|
$0.300
|
$0.310
|
$0.330
|
$0.500
|
|
|
|
RE PM W/RET REQ TY II (W) 4" (BRK)
|
LF
|
16,496.000
|
$0.170
|
$0.210
|
$0.220
|
$0.090
|
$0.150
|
|
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
53,079.000
|
$0.170
|
$0.210
|
$0.220
|
$0.090
|
$0.150
|
|
|
|
RE PM W/RET REQ TY II (Y) 4" (BRK)
|
LF
|
4,994.000
|
$1.000
|
$0.210
|
$0.220
|
$0.090
|
$0.150
|
|
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
53,204.000
|
$0.200
|
$0.210
|
$0.220
|
$0.090
|
$0.150
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
48.000
|
$203.020
|
$267.500
|
$275.000
|
$250.000
|
$425.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
46.000
|
$246.140
|
$267.500
|
$275.000
|
$330.000
|
$605.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
62.000
|
$29.490
|
$21.400
|
$22.000
|
$50.000
|
$52.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
838.000
|
$2.700
|
$3.210
|
$3.300
|
$3.300
|
$3.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
743.000
|
$3.840
|
$3.210
|
$3.300
|
$3.300
|
$3.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
475.000
|
$3.470
|
$3.210
|
$3.300
|
$3.300
|
$3.000
|
|
|
|
TRAFFIC BUTTON TY W
|
EA
|
294.000
|
$3.820
|
$2.570
|
$2.600
|
$4.000
|
$3.000
|
|
|
|
TRAFFIC BUTTON TY Y
|
EA
|
104.000
|
$3.000
|
$2.570
|
$2.600
|
$4.000
|
$3.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,465.000
|
$0.960
|
$0.540
|
$0.010
|
$0.420
|
$2.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,509.000
|
$1.000
|
$0.540
|
$0.010
|
$1.100
|
$1.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
145.000
|
$4.410
|
$3.210
|
$0.010
|
$5.500
|
$1.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
8.000
|
$90.680
|
$53.500
|
$60.000
|
$180.000
|
$25.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
5.000
|
$80.390
|
$53.500
|
$60.000
|
$180.000
|
$25.000
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,465.000
|
$0.260
|
$0.210
|
$0.220
|
$0.140
|
$0.900
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,509.000
|
$0.330
|
$0.210
|
$0.220
|
$0.250
|
$1.750
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
145.000
|
$2.200
|
$0.210
|
$0.220
|
$0.800
|
$5.250
|
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
48.000
|
$30.270
|
$5.350
|
$5.500
|
$58.000
|
$44.300
|
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
46.000
|
$35.790
|
$5.350
|
$5.500
|
$58.000
|
$73.000
|
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
62.000
|
$100.000
|
$2.140
|
$2.200
|
$36.000
|
$7.900
|
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
8,480.000
|
$1.200
|
$1.610
|
$1.650
|
$2.000
|
$1.500
|
|
|
|
BRIDGE JOINT REPAIR (FULL DEPTH)
|
LF
|
640.000
|
$100.000
|
$275.000
|
$55.000
|
$195.000
|
$175.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,032.230
|
$10,000.000
|
$10,000.000
|
$6,100.000
|
$22,500.000
|
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
10.000
|
$5,434.270
|
$10,700.000
|
$11,000.000
|
$13,000.000
|
$10,000.000
|
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
36.000
|
$1,361.580
|
$2,675.000
|
$2,750.000
|
$3,300.000
|
$2,500.000
|
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
10.000
|
$634.810
|
$1,070.000
|
$1,100.000
|
$1,300.000
|
$1,000.000
|
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
8,480.000
|
$3.260
|
$1.610
|
$1.650
|
$2.000
|
$1.500
|
|
|
|
CONDUIT (PREPARE)
|
LF
|
690.000
|
$1.800
|
$21.400
|
$22.000
|
$26.000
|
$20.000
|
|
|
|
GROUND BOX (PREPARE)
|
EA
|
37.000
|
$350.000
|
$1,605.000
|
$1,650.000
|
$2,000.000
|
$1,500.000
|
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$530.000
|
$5,000.000
|
$12,500.000
|
$20,000.000
|
$50,000.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
104.000
|
$15.000
|
$55.000
|
$35.000
|
$85.000
|
$50.000
|
|
1
|
|
STONE-MTRX-ASPH SMA-F SAC-B PG76-22
|
TON
|
31,164.000
|
$115.000
|
$101.770
|
$102.140
|
$117.000
|
$110.000
|
|
Totals: |
$9,768,841.401
|
$5,844,817.840
|
$6,078,788.990
|
$6,973,734.260
|
$7,433,904.750
|