Show Job Controls
Bid Cobra

TAYLOR IH 20 (0006-06-103)

Items: 82

County: TAYLOR
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0006-06-103
DBE Goal: N/A
Project: BR 1702(237)
Guaranty: N/A
Time: 166 WORKING DAYS
Engineer's Estimate: $2,577,356.45
Date: 06/06/2017 (9 years ago)
Contract Number: N/A
Type: REHAB EXISTING BRIDGE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,577,356.45
$2,981,256.75
Over/Under Est: 15.67% $403,900.30
$3,079,095.01
Over/Under Est: 19.47% $501,738.56
Amt Left: 3.28% $97,838.26
$3,437,514.01
Over/Under Est: 33.37% $860,157.56
Amt Left: 15.3% $456,257.26
Delta: -11.64% -$358,419.00
$3,466,366.50
Over/Under Est: 34.49% $889,010.05
Amt Left: 16.27% $485,109.75
Delta: -0.84% -$28,852.49
Over/Under Est: 51.07% $1,316,354.55
Amt Left: 30.61% $912,454.25
Delta: -12.33% -$427,344.50

Bid Items & Bid Tabulations

82 Total 0 of 82
TAYLOR  |  IH 20  |  ABILENE  |  0006-06-103  |  06/06/2017  |  $2,577,356.45  |  BR 1702(237)  |  REHAB EXIST BRIDGE  |  166 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAY-REESE CONTRACTORS, INC.
GILVIN-TERRILL, LTD.
FNF CONSTRUCTION, INC.
L.C. JORDAN & SON
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
CY 18.000 $1,000.000 $130.000 $680.000 $249.830 $55.000 $665.000
REMOVING CONC (SIDEWALKS)
SY 54.000 $20.000 $25.000 $165.000 $26.700 $25.000 $50.000
REMOVING CONC (CURB AND GUTTER)
LF 80.000 $6.000 $15.000 $54.000 $18.360 $25.000 $50.000
REMOVING CONC (CTB)
LF 510.000 $11.000 $30.000 $12.000 $25.920 $30.000 $60.000
REMOVING CONCRETE(MOW STRIP)
LF 363.000 $10.000 $10.000 $12.000 $9.400 $30.000 $14.000
REMOVING STAB BASE AND ASPH PAV (13")
SY 254.000 $7.000 $20.000 $41.000 $82.450 $40.000 $98.000
ASPH (MULTI OPTION)
GAL 1,012.000 $6.000 $11.000 $78.000 $17.100 $10.000 $11.250
AGGR(TY-B GR-4 SAC-B)
CY 20.000 $250.000 $330.000 $405.000 $248.080 $150.000 $560.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-28
TON 182.000 $400.000 $470.000 $317.000 $233.660 $200.000 $560.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,196.000 $6.000 $6.000 $52.000 $13.700 $10.000 $15.000
PAV JT UNDERSEAL (24")
LF 456.000 $40.000 $20.000 $128.040 $16.220 $70.000 $30.000
STRUCT EXCAV
CY 143.000 $12.000 $40.000 $194.000 $44.020 $50.000 $193.000
CEM STABIL BKFL
CY 123.000 $153.000 $150.000 $322.000 $191.570 $200.000 $290.000
FLOWABLE BACKFILL
CY 22.000 $130.000 $150.000 $389.000 $358.470 $400.000 $645.000
TEMPORARY SPL SHORING
SF 516.000 $40.000 $5.000 $125.000 $88.170 $25.000 $48.250
APPROACH SLAB (HPC)
CY 91.500 $460.000 $900.000 $581.000 $800.000 $950.000 $710.000
CONCRETE PAN GIRDER (EXTEND)(HPC)
CY 110.000 $2,000.000 $2,600.000 $2,395.000 $2,600.000 $1,100.000 $5,570.000
SILICONE RESIN PAINT FINISH
SF 6,457.000 $6.000 $3.000 $2.500 $3.950 $3.000 $1.100
PENETRATING CONCRETE SURFACE TREATMENT
SY 1,911.000 $4.000 $17.000 $15.000 $23.700 $9.000 $6.550
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 184.000 $168.000 $120.000 $139.000 $73.150 $200.000 $65.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 32.000 $400.000 $220.000 $40.000 $199.910 $400.000 $100.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 3,300.000 $160.000 $110.000 $31.000 $135.000 $125.000 $100.000
CONC STR REPR(REMOVE AND REPLACE CAP)
CY 7.200 $7,000.000 $5,500.000 $5,090.000 $7,461.560 $3,000.000 $13,800.000
RIPRAP (CONC)(4 IN)
CY 123.000 $450.000 $900.000 $380.000 $857.670 $500.000 $725.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $500.000 $700.000 $575.000 $694.490 $500.000 $670.000
ELASTOMERIC BEARING (LAMINATED)
EA 160.000 $500.000 $300.000 $370.000 $672.950 $750.000 $1,000.000
CLEANING AND SEALING JOINTS (CL 3)
LF 456.000 $41.000 $30.000 $32.000 $15.480 $45.000 $65.000
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $100,000.000 $250,000.000 $215,000.000 $278,098.570 $500,000.000 $400,000.000
RAIL (TY SSTR)(HPC)
LF 800.000 $55.000 $150.000 $154.000 $187.190 $225.000 $148.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 48.000 $300.000 $180.000 $154.000 $428.660 $400.000 $154.000
RAISING EXIST STRUCT
LS 1.000 $45,000.000 $110,000.000 $94,100.000 $136,988.360 $250,000.000 $75,000.000
REMOVE STR (CONC)
EA 2.000 $20,000.000 $75,000.000 $60,463.000 $30,326.290 $10,000.000 $70,000.000
MOBILIZATION
LS 1.000 $232,819.400 $290,000.000 $315,000.000 $339,386.260 $325,000.000 $389,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $9,500.000 $1,200.000 $21,000.000 $23,311.400 $10,000.000 $8,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,400.000 $5.000 $6.600 $6.000 $4.300 $8.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,400.000 $1.400 $1.000 $1.000 $1.680 $1.000 $1.150
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 720.000 $35.000 $85.000 $86.000 $26.740 $80.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,920.000 $57.000 $75.000 $85.000 $48.910 $65.000 $39.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $60.000 $65.000 $102.000 $62.550 $75.000 $39.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 720.000 $18.000 $20.000 $22.000 $4.400 $35.000 $40.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,830.000 $6.500 $20.000 $22.000 $2.170 $25.000 $32.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 60.000 $7.250 $20.000 $22.000 $25.470 $25.000 $32.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 720.000 $15.000 $20.000 $22.000 $35.280 $35.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,920.000 $15.000 $16.000 $22.000 $20.080 $25.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $16.000 $22.000 $20.040 $25.000 $20.000
PERM CTB (F-SHAPE) (TY 1)
LF 510.000 $60.000 $140.000 $109.000 $195.500 $300.000 $171.000
CONC CURB & GUTTER (TY II)
LF 80.000 $22.000 $50.000 $85.000 $71.020 $125.000 $100.000
CONC SIDEWALKS (4")
SY 54.000 $60.000 $110.000 $82.000 $142.810 $75.000 $120.000
MTL W-BEAM GD FEN (STEEL POST)
LF 275.000 $58.000 $25.000 $22.000 $35.160 $34.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,650.000 $2,300.000 $2,000.000 $3,239.030 $2,500.000 $2,550.000
REMOVE METAL BEAM GUARD FENCE
LF 412.500 $3.500 $3.100 $2.750 $4.740 $5.000 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $350.000 $300.000 $275.000 $474.000 $1,000.000 $400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,600.000 $2,800.000 $2,450.000 $3,950.050 $3,000.000 $2,800.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $16,000.000 $10,700.000 $9,750.000 $5,904.480 $18,000.000 $10,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,900.000 $1,600.000 $1,400.000 $640.280 $4,000.000 $3,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,800.000 $830.000 $725.000 $921.870 $2,500.000 $2,000.000
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
LF 270.000 $10.000 $46.000 $46.500 $61.940 $15.000 $17.000
ELEC CONDR (NO.8) BARE
LF 718.000 $1.250 $2.500 $2.300 $3.480 $20.000 $2.750
ELEC CONDR (NO.8) INSULATED
LF 1,436.000 $2.500 $3.000 $2.500 $3.870 $15.000 $3.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 10.000 $38.000 $20.000 $18.000 $31.600 $100.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 4.000 $30.000 $20.000 $18.000 $31.600 $100.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 9.000 $30.000 $20.000 $18.000 $31.600 $100.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $38.000 $35.000 $30.000 $55.300 $100.000 $40.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 2.000 $33.000 $35.000 $30.000 $55.300 $100.000 $40.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,375.000 $0.900 $1.350 $1.250 $3.000 $2.000 $1.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,095.000 $0.900 $1.350 $1.250 $3.000 $2.000 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 408.000 $1.600 $3.000 $1.000 $2.520 $5.000 $2.250
PAVEMENT SEALER 4"
LF 500.000 $0.200 $0.220 $0.200 $1.550 $1.000 $0.250
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 620.000 $0.650 $2.500 $2.250 $2.480 $3.000 $2.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 520.000 $0.650 $1.400 $1.300 $2.340 $2.000 $1.450
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 520.000 $0.650 $1.400 $1.300 $2.320 $2.000 $1.450
PREFAB PAV MRK TY B (W)(4")(BRK)
LF 740.000 $4.000 $5.000 $4.500 $9.600 $5.000 $5.050
PREFAB PAV MRK TY B (W)(4")(SLD)
LF 2,260.000 $4.000 $4.500 $4.000 $9.290 $5.000 $4.500
PREFAB PAV MRK TY B (Y)(4")(SLD)
LF 2,740.000 $4.000 $4.500 $4.000 $9.290 $5.000 $4.500
REFL PAV MRKR TY II-C-R
EA 67.000 $5.000 $11.500 $10.500 $7.740 $12.000 $12.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,340.000 $0.450 $3.000 $2.600 $2.940 $3.000 $2.900
PAV SURF PREP FOR MRK (4")
LF 6,240.000 $0.200 $1.100 $1.000 $1.860 $2.000 $1.150
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 245.000 $42.000 $15.000 $238.000 $54.590 $125.000 $51.000
REP STL BRIDGE MEMBER (PILING)
EA 1.000 $20,000.000 $5,000.000 $64,150.000 $4,535.900 $25,000.000 $12,500.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 280.000 $340.000 $500.000 $84.000 $329.760 $125.000 $450.000
CARBON FIBER REINF POLYMER PROTECTION
SF 3,450.000 $46.000 $30.000 $30.000 $42.720 $30.000 $38.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $13,000.000 $5,000.000 $6,000.000 $7,742.080 $3,000.000 $13,000.000
Totals: $2,577,356.450 $2,981,256.750 $3,079,095.015 $3,437,514.012 $3,466,366.500 $3,893,711.000