TARRANT IH0820 (6340-00-001)

Items: 69

County: TARRANT
Length: N/A
Highway: IH0820
District: FORT WORTH
Control Number: 6340-00-001
DBE Goal: N/A
Project: RMC - 634000001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $2,345,459.50
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR AND INSTALLATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,345,459.50
$2,037,039.00
Over/Under Est: -13.15% -$308,420.50
Over/Under Est: -4.33% -$101,532.27
Amt Left: 10.16% $206,888.23

Bid Items & Bid Tabulations

69 Total 0 of 69
TARRANT  |  IH0820  |  FORT WORTH  |  6340-00-001  |  12/03/2019  |  $2,345,459.50  |  RMC - 634000001  |  GUARDRAIL REPAIR AND INSTL  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VANN/ELLI, INC.
ELITE CASTLE RESOURCES LLC
MOBILIZATION (CALLOUT)
EA 12.000 $800.000 $1.000 $2.000
MOBILIZATION (EMERGENCY)
EA 4.000 $800.000 $500.000 $350.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $28.000 $23.000 $29.210
TERMINAL ANCHOR SECTION
EA 5.000 $500.000 $1.000 $52.440
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 25.000 $2,000.000 $2,500.000 $1,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 250.000 $28.000 $23.000 $14.000
SHORT RADIUS
LF 250.000 $30.000 $25.000 $20.490
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $800.000 $700.000 $400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,350.000 $1,500.000 $2,000.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 25.000 $2,000.000 $1.000 $1,000.000
MTL BM GD FEN TRANS (THRIE-BEAM)(OPT1)
EA 25.000 $2,407.380 $2,800.000 $1,906.210
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $3.000 $1.150
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $100.000 $500.000 $869.050
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $800.000 $300.000 $640.140
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $200.000 $50.000 $100.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 2.000 $2,700.000 $1.000 $1,500.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 5.000 $2,700.000 $2,400.000 $1,500.000
CHAIN LINK FENCE (REMOVE)
LF 100.000 $5.000 $2.000 $5.000
CHAIN LINK FENCE (REPAIR) (4')
LF 600.000 $25.000 $20.000 $15.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 50,000.000 $11.000 $9.500 $11.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $35.000 $2.000 $50.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 30.000 $35.000 $2.000 $50.000
RAISE RAIL ELEMENT
LF 1,000.000 $8.000 $0.500 $3.000
REALIGN EXISTING RAIL
LF 200.000 $8.000 $5.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 2,000.000 $45.000 $40.000 $31.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 75.000 $80.000 $50.000 $98.450
REALIGN POSTS
EA 2,500.000 $10.000 $10.000 $5.000
REMOVE & REPLACE BLOCKOUT
EA 200.000 $25.000 $200.000 $164.150
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 6,000.000 $16.000 $0.500 $5.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 750.000 $60.000 $0.500 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $50.000 $1.000 $45.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 200.000 $3,000.000 $2,650.000 $3,100.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $825.000 $600.000 $900.000
REM & RESET SGT IMPACT HEAD
EA 100.000 $150.000 $20.000 $20.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $50.000 $1.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $200.000 $1.000 $100.000
REPLACE SGT STRUT
EA 10.000 $75.000 $1.000 $100.000
REPLACE SGT OBJECT MARKER
EA 50.000 $45.000 $25.000 $10.000
REPAIR STEEL POST WITH BASE PLATE
EA 200.000 $100.000 $250.000 $250.000
REPLACE POSTS (TL-3)
EA 750.000 $100.000 $140.000 $100.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $125.000 $500.000 $950.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $45.000 $50.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 2.000 $1,000.000 $3,000.000 $4,500.000
REPLACE CABLE (TL-3)
LF 100.000 $5.000 $4.000 $8.000
CHECK / RE-TENSION CABLE
EA 10.000 $1,000.000 $300.000 $100.000
POST AND CABLE FENCE (REMOVAL)
LF 200.000 $10.000 $1.000 $5.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 200.000 $20.000 $8.000 $15.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 50.000 $50.000 $50.000 $50.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 200.000 $10.000 $2.000 $8.000
POST AND CABLE FENCE (REPAIR)
LF 1,000.000 $12.000 $3.000 $5.000
REMOVE AND REPLACE (TRACC)
EA 5.000 $13,500.000 $14,500.000 $13,000.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $18,000.000 $20,000.000 $16,000.000
REPAIR (TRACC)
EA 10.000 $3,000.000 $3,000.000 $3,000.000
REPAIR (REACT)
EA 25.000 $2,000.000 $2,000.000 $1,000.000
REPAIR REACT (N) (MISC HARDWARE)
EA 10.000 $800.000 $1,000.000 $500.000
REPAIR REACT (N) (CYLINDERS)
EA 4.000 $2,000.000 $2,500.000 $500.000
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $18,000.000 $23,000.000 $31,500.000
REPAIR (SMTC) (N)
EA 10.000 $2,000.000 $3,000.000 $5,500.000
REMOVE AND REPLACE (SHORTRACC)
EA 2.000 $10,000.000 $11,000.000 $11,000.000
REPAIR (SHORTRACC)
LF 2.000 $800.000 $300.000 $400.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $15,000.000 $15,500.000 $15,500.000
REPAIR TAU II (N) (MISC HARDWARE)
EA 1.000 $2,500.000 $2,000.000 $2,000.000
REPAIR TAU II (N)
LF 2.000 $400.000 $300.000 $500.000
REPAIR (BEAT - SSCC)
LF 100.000 $250.000 $250.000 $150.000
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 4.000 $2,500.000 $2,500.000 $3,850.000
REACT DECAL
EA 12.000 $200.000 $350.000 $805.000
REACT 350 CABLE HOLDERS
EA 12.000 $50.000 $250.000 $862.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2.000 $200.000 $200.000 $450.000
TMA (STATIONARY)
DAY 276.000 $200.000 $50.000 $40.000
Totals: $2,345,459.500 $2,037,039.000 $2,243,927.230