MOBILIZATION
|
LS
|
1.000
|
$12,000.000
|
$1.050
|
$1.000
|
$522,700.300
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
4.000
|
$400.000
|
$650.780
|
$500.000
|
$3,778.560
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$28.000
|
$29.050
|
$23.000
|
$23.590
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$1,800.000
|
$1.780
|
$1.000
|
$178.510
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$1,817.000
|
$2,318.050
|
$2,500.000
|
$1,865.420
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
50.000
|
$11.000
|
$17.780
|
$23.000
|
$15.390
|
|
|
SHORT RADIUS
|
LF
|
250.000
|
$20.000
|
$21.050
|
$25.000
|
$51.820
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$600.000
|
$248.780
|
$700.000
|
$738.050
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,150.000
|
$3,859.050
|
$1,500.000
|
$1,582.230
|
|
|
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
|
EA
|
2.000
|
$1,800.000
|
$1.780
|
$1.000
|
$806.090
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
20.000
|
$500.000
|
$378.050
|
$625.000
|
$431.960
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,000.000
|
$4.000
|
$1.780
|
$3.000
|
$3.180
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
15.000
|
$150.000
|
$1.050
|
$100.000
|
$327.830
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,700.000
|
$3,788.780
|
$2,800.000
|
$3,095.590
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
10.000
|
$500.000
|
$100.050
|
$300.000
|
$544.110
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
10.000
|
$200.000
|
$49.780
|
$50.000
|
$500.410
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
250.000
|
$18.000
|
$15.050
|
$20.000
|
$16.220
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
250.000
|
$18.000
|
$20.780
|
$20.000
|
$16.230
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
250.000
|
$5.000
|
$1.050
|
$3.000
|
$9.400
|
|
|
CHAIN LINK FENCE (REPAIR) (4')
|
LF
|
250.000
|
$18.000
|
$19.780
|
$20.000
|
$13.190
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
85,000.000
|
$10.000
|
$5.050
|
$9.500
|
$25.430
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
50.000
|
$40.000
|
$2.580
|
$40.000
|
$32.770
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
25.000
|
$40.000
|
$2.130
|
$40.000
|
$28.890
|
|
|
RAISE RAIL ELEMENT
|
LF
|
500.000
|
$5.000
|
$0.580
|
$0.500
|
$8.850
|
|
|
REALIGN EXISTING RAIL
|
LF
|
250.000
|
$10.000
|
$10.130
|
$15.000
|
$25.190
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
3,500.000
|
$47.000
|
$34.480
|
$45.000
|
$54.680
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
500.000
|
$30.000
|
$60.130
|
$50.000
|
$58.270
|
|
|
REALIGN POSTS
|
EA
|
600.000
|
$5.000
|
$35.580
|
$20.000
|
$12.820
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
600.000
|
$50.000
|
$201.130
|
$40.000
|
$26.560
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
5,000.000
|
$15.000
|
$9.580
|
$3.000
|
$27.690
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
500.000
|
$80.000
|
$1.130
|
$40.000
|
$59.280
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
300.000
|
$1.000
|
$1.580
|
$1.000
|
$41.590
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
300.000
|
$2,800.000
|
$3,023.130
|
$2,800.000
|
$3,724.900
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
25.000
|
$1,000.000
|
$2,458.580
|
$2,700.000
|
$1,354.430
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
100.000
|
$25.000
|
$21.130
|
$25.000
|
$112.120
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
60.000
|
$100.000
|
$50.580
|
$1.000
|
$78.720
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
50.000
|
$100.000
|
$50.130
|
$1.000
|
$82.140
|
|
|
REPLACE SGT STRUT
|
EA
|
50.000
|
$50.000
|
$51.580
|
$1.000
|
$76.160
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
50.000
|
$140.000
|
$11.130
|
$25.000
|
$50.370
|
|
|
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
|
LF
|
500.000
|
$8.000
|
$6.580
|
$3.000
|
$16.090
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
200.000
|
$250.000
|
$249.130
|
$300.000
|
$260.600
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
100.000
|
$420.000
|
$684.580
|
$140.000
|
$162.280
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
50.000
|
$350.000
|
$79.130
|
$140.000
|
$141.800
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
10.000
|
$250.000
|
$148.580
|
$250.000
|
$195.590
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
2.000
|
$380.000
|
$149.130
|
$250.000
|
$202.720
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
10.000
|
$100.000
|
$54.580
|
$50.000
|
$192.760
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
5.000
|
$200.000
|
$53.130
|
$50.000
|
$99.730
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
1.000
|
$1,800.000
|
$4,756.580
|
$2,000.000
|
$1,271.420
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
1.000
|
$3,600.000
|
$256.480
|
$2,000.000
|
$931.080
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
100.000
|
$8.000
|
$5.240
|
$4.000
|
$4.300
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
50.000
|
$10.000
|
$5.480
|
$4.000
|
$1.150
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
3.000
|
$2,750.000
|
$2,750.240
|
$500.000
|
$213.430
|
|
|
REPLACE POST HARDWARE (TL-4)
|
EA
|
100.000
|
$234.000
|
$284.480
|
$50.000
|
$83.190
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
200.000
|
$3.000
|
$1.240
|
$1.000
|
$2.320
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
300.000
|
$8.000
|
$8.480
|
$8.000
|
$6.060
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
50.000
|
$40.000
|
$50.240
|
$50.000
|
$68.230
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
200.000
|
$5.000
|
$2.480
|
$2.000
|
$2.440
|
|
|
POST AND CABLE FENCE (REPAIR)
|
LF
|
50.000
|
$20.000
|
$20.240
|
$10.000
|
$9.000
|
|
|
REMOVE AND REPLACE (TRACC)
|
EA
|
12.000
|
$13,000.000
|
$1,011.480
|
$13,000.000
|
$15,245.450
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
2.000
|
$20,000.000
|
$18,487.240
|
$28,000.000
|
$27,740.560
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
5.000
|
$19,500.000
|
$10,489.480
|
$20,000.000
|
$20,031.140
|
|
|
REPAIR (TRACC)
|
EA
|
10.000
|
$3,800.000
|
$3,008.240
|
$3,000.000
|
$3,533.260
|
|
|
REPAIR (WIDE TRACC)
|
EA
|
2.000
|
$4,000.000
|
$5,019.480
|
$4,000.000
|
$4,216.650
|
|
|
REPAIR (REACT)
|
EA
|
30.000
|
$3,000.000
|
$2,018.240
|
$2,000.000
|
$1,126.840
|
|
|
REPAIR REACT (N) (MISC HARDWARE)
|
EA
|
15.000
|
$1,500.000
|
$503.480
|
$1,000.000
|
$1,630.050
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
10.000
|
$2,500.000
|
$2,426.240
|
$2,500.000
|
$1,941.940
|
|
|
REMOVE AND REPLACE (FASTRACC)
|
EA
|
2.000
|
$17,000.000
|
$5,019.480
|
$17,500.000
|
$14,989.280
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
2.000
|
$23,500.000
|
$29,512.240
|
$23,000.000
|
$15,586.040
|
|
|
REPAIR (SMTC) (N)
|
EA
|
5.000
|
$3,800.000
|
$4,827.480
|
$3,000.000
|
$4,048.560
|
|
|
REMOVE AND REPLACE (SHORTRACC)
|
EA
|
4.000
|
$11,000.000
|
$3,805.240
|
$10,500.000
|
$12,833.830
|
|
|
REMOVE AND REPLACE (FASTRACC) (W)
|
EA
|
1.000
|
$22,500.000
|
$20,154.480
|
$35,000.000
|
$27,507.890
|
|
|
REPAIR (FASTRACC)
|
LF
|
26.000
|
$350.000
|
$100.240
|
$300.000
|
$399.070
|
|
|
REPAIR (SHORTRACC)
|
LF
|
14.000
|
$350.000
|
$803.480
|
$300.000
|
$298.080
|
|
|
REPAIR (FASTRACC) (W)
|
LF
|
26.000
|
$350.000
|
$298.240
|
$300.000
|
$352.670
|
|
|
REMOVE & REPLACE TRACC (TXDOT FURNISHD)
|
EA
|
5.000
|
$3,000.000
|
$1,254.480
|
$3,000.000
|
$3,166.790
|
|
|
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
|
EA
|
2.000
|
$3,000.000
|
$4,423.240
|
$3,000.000
|
$3,031.240
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
2.000
|
$106.000
|
$1,179.560
|
$200.000
|
$144.740
|
|
|
TMA (STATIONARY)
|
DAY
|
260.000
|
$180.000
|
$1.560
|
$50.000
|
$377.860
|
|
Totals: |
$3,120,257.000
|
$2,484,619.570
|
$2,887,218.000
|
$5,325,635.190
|