Show Job Controls
Bid Cobra

TARRANT IH0035W (6325-29-001)

Items: 78

County: TARRANT
Length: N/A
Highway: IH0035W
District: FORT WORTH
Control Number: 6325-29-001
DBE Goal: N/A
Project: RMC - 632529001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $3,120,257.00
Date: 12/04/2019 (6 years ago)
Contract Number: N/A
Type: GUARDRAIL INSTALLATION AND REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$3,120,257.00
$2,484,619.57
Over/Under Est: -20.37% -$635,637.43
$2,887,218.00
Over/Under Est: -7.47% -$233,039.00
Amt Left: 16.2% $402,598.43
$5,325,635.19
Over/Under Est: 70.68% $2,205,378.19
Amt Left: 114.34% $2,841,015.62
Delta: -84.46% -$2,438,417.19

Bid Items & Bid Tabulations

78 Total 0 of 78
TARRANT  |  IH0035W  |  FORT WORTH  |  6325-29-001  |  12/04/2019  |  $3,120,257.00  |  RMC - 632529001  |  GUARDRAIL INSTL AND REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
VANN/ELLI, INC.
ALTUS CONSTRUCTION LLC
MOBILIZATION
LS 1.000 $12,000.000 $1.050 $1.000 $522,700.300
MOBILIZATION (EMERGENCY)
EA 4.000 $400.000 $650.780 $500.000 $3,778.560
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $28.000 $29.050 $23.000 $23.590
TERMINAL ANCHOR SECTION
EA 5.000 $1,800.000 $1.780 $1.000 $178.510
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,817.000 $2,318.050 $2,500.000 $1,865.420
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $11.000 $17.780 $23.000 $15.390
SHORT RADIUS
LF 250.000 $20.000 $21.050 $25.000 $51.820
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $600.000 $248.780 $700.000 $738.050
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,150.000 $3,859.050 $1,500.000 $1,582.230
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 2.000 $1,800.000 $1.780 $1.000 $806.090
MTL BM GD FEN TRANS (31"-28")
EA 20.000 $500.000 $378.050 $625.000 $431.960
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $4.000 $1.780 $3.000 $3.180
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $150.000 $1.050 $100.000 $327.830
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,700.000 $3,788.780 $2,800.000 $3,095.590
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 10.000 $500.000 $100.050 $300.000 $544.110
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $200.000 $49.780 $50.000 $500.410
CHAIN LINK FENCE (INSTALL) (6')
LF 250.000 $18.000 $15.050 $20.000 $16.220
CHAIN LINK FENCE (REPAIR) (6')
LF 250.000 $18.000 $20.780 $20.000 $16.230
CHAIN LINK FENCE (REMOVE)
LF 250.000 $5.000 $1.050 $3.000 $9.400
CHAIN LINK FENCE (REPAIR) (4')
LF 250.000 $18.000 $19.780 $20.000 $13.190
REPAIR RAIL ELEMENT (W - BEAM)
LF 85,000.000 $10.000 $5.050 $9.500 $25.430
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $40.000 $2.580 $40.000 $32.770
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $40.000 $2.130 $40.000 $28.890
RAISE RAIL ELEMENT
LF 500.000 $5.000 $0.580 $0.500 $8.850
REALIGN EXISTING RAIL
LF 250.000 $10.000 $10.130 $15.000 $25.190
REM / REPL TIMBER/STL POST W/O CONC FND
EA 3,500.000 $47.000 $34.480 $45.000 $54.680
REM / REPL TIMBER / STL POST W/CONC FND
EA 500.000 $30.000 $60.130 $50.000 $58.270
REALIGN POSTS
EA 600.000 $5.000 $35.580 $20.000 $12.820
REMOVE & REPLACE BLOCKOUT
EA 600.000 $50.000 $201.130 $40.000 $26.560
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 5,000.000 $15.000 $9.580 $3.000 $27.690
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $80.000 $1.130 $40.000 $59.280
REPLACE TERMINAL ANCHOR POSTS
EA 300.000 $1.000 $1.580 $1.000 $41.590
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 300.000 $2,800.000 $3,023.130 $2,800.000 $3,724.900
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $1,000.000 $2,458.580 $2,700.000 $1,354.430
REM & RESET SGT IMPACT HEAD
EA 100.000 $25.000 $21.130 $25.000 $112.120
REPLACE SGT CABLE ASSEMBLY
EA 60.000 $100.000 $50.580 $1.000 $78.720
REPLACE SGT CABLE ANCHOR
EA 50.000 $100.000 $50.130 $1.000 $82.140
REPLACE SGT STRUT
EA 50.000 $50.000 $51.580 $1.000 $76.160
REPLACE SGT OBJECT MARKER
EA 50.000 $140.000 $11.130 $25.000 $50.370
REPAIR RAIL ELEMENT(W - BEAM FURNISHED)
LF 500.000 $8.000 $6.580 $3.000 $16.090
REPAIR STEEL POST WITH BASE PLATE
EA 200.000 $250.000 $249.130 $300.000 $260.600
REPLACE POSTS (TL-3)
EA 100.000 $420.000 $684.580 $140.000 $162.280
REPLACE POSTS (TL-4)
EA 50.000 $350.000 $79.130 $140.000 $141.800
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $250.000 $148.580 $250.000 $195.590
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $380.000 $149.130 $250.000 $202.720
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $100.000 $54.580 $50.000 $192.760
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $200.000 $53.130 $50.000 $99.730
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 1.000 $1,800.000 $4,756.580 $2,000.000 $1,271.420
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 1.000 $3,600.000 $256.480 $2,000.000 $931.080
REPLACE CABLE (TL-3)
LF 100.000 $8.000 $5.240 $4.000 $4.300
REPLACE CABLE (TL-4)
LF 50.000 $10.000 $5.480 $4.000 $1.150
CHECK / RE-TENSION CABLE
EA 3.000 $2,750.000 $2,750.240 $500.000 $213.430
REPLACE POST HARDWARE (TL-4)
EA 100.000 $234.000 $284.480 $50.000 $83.190
POST AND CABLE FENCE (REMOVAL)
LF 200.000 $3.000 $1.240 $1.000 $2.320
POST AND CABLE FENCE (NEW INSTALLATION)
LF 300.000 $8.000 $8.480 $8.000 $6.060
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 50.000 $40.000 $50.240 $50.000 $68.230
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 200.000 $5.000 $2.480 $2.000 $2.440
POST AND CABLE FENCE (REPAIR)
LF 50.000 $20.000 $20.240 $10.000 $9.000
REMOVE AND REPLACE (TRACC)
EA 12.000 $13,000.000 $1,011.480 $13,000.000 $15,245.450
REMOVE AND REPLACE (WIDE TRACC)
EA 2.000 $20,000.000 $18,487.240 $28,000.000 $27,740.560
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $19,500.000 $10,489.480 $20,000.000 $20,031.140
REPAIR (TRACC)
EA 10.000 $3,800.000 $3,008.240 $3,000.000 $3,533.260
REPAIR (WIDE TRACC)
EA 2.000 $4,000.000 $5,019.480 $4,000.000 $4,216.650
REPAIR (REACT)
EA 30.000 $3,000.000 $2,018.240 $2,000.000 $1,126.840
REPAIR REACT (N) (MISC HARDWARE)
EA 15.000 $1,500.000 $503.480 $1,000.000 $1,630.050
REPAIR REACT (N) (CYLINDERS)
EA 10.000 $2,500.000 $2,426.240 $2,500.000 $1,941.940
REMOVE AND REPLACE (FASTRACC)
EA 2.000 $17,000.000 $5,019.480 $17,500.000 $14,989.280
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $23,500.000 $29,512.240 $23,000.000 $15,586.040
REPAIR (SMTC) (N)
EA 5.000 $3,800.000 $4,827.480 $3,000.000 $4,048.560
REMOVE AND REPLACE (SHORTRACC)
EA 4.000 $11,000.000 $3,805.240 $10,500.000 $12,833.830
REMOVE AND REPLACE (FASTRACC) (W)
EA 1.000 $22,500.000 $20,154.480 $35,000.000 $27,507.890
REPAIR (FASTRACC)
LF 26.000 $350.000 $100.240 $300.000 $399.070
REPAIR (SHORTRACC)
LF 14.000 $350.000 $803.480 $300.000 $298.080
REPAIR (FASTRACC) (W)
LF 26.000 $350.000 $298.240 $300.000 $352.670
REMOVE & REPLACE TRACC (TXDOT FURNISHD)
EA 5.000 $3,000.000 $1,254.480 $3,000.000 $3,166.790
REMOVE & REPLACE REACT 350(TXDOT FRNSH)
EA 2.000 $3,000.000 $4,423.240 $3,000.000 $3,031.240
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2.000 $106.000 $1,179.560 $200.000 $144.740
TMA (STATIONARY)
DAY 260.000 $180.000 $1.560 $50.000 $377.860
Totals: $3,120,257.000 $2,484,619.570 $2,887,218.000 $5,325,635.190