TARRANT IH0030 (6324-29-001)

Items: 102

County: TARRANT
Length: N/A
Highway: IH0030
District: FORT WORTH
Control Number: 6324-29-001
DBE Goal: N/A
Project: RMC - 632429001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $393,789.97
Date: 02/01/2018 (8 years ago)
Contract Number: N/A
Type: PREVENTIVE SIGNAL MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$393,789.97
Over/Under Est: 40.52% $159,568.61
Over/Under Est: 95.54% $376,210.03
Amt Left: 39.15% $216,641.42

Bid Items & Bid Tabulations

102 Total 0 of 102
TARRANT  |  IH0030  |  FORT WORTH  |  6324-29-001  |  02/01/2018  |  $393,789.97  |  RMC - 632429001  |  PREVENT SIGNAL MAINT  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AMERICAN LIGHTING AND SIGNALIZATION, LLC
DURABLE SPECIALTIES, INC.
MOBILIZATION (CALLOUT)
EA 6.000 $1,533.220 $6,126.700 $1,600.000
MOBILIZATION (EMERGENCY)
EA 6.000 $3,333.330 $1,481.980 $3,200.000
BARR, SIGNS, TRAFFIC HANDLING
EA 12.000 $3,750.000 $905.650 $2,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 10.000 $4.100 $2.790 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 10.000 $1.130 $1.890 $1.000
CONDT (PVC) (SCH 40) (2")
LF 50.000 $7.550 $17.140 $10.000
CONDT (PVC) (SCH 40) (3")
LF 50.000 $8.720 $17.960 $12.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 150.000 $20.240 $25.400 $24.000
CONDT (PVC) (SCH 40) (4")
LF 50.000 $11.420 $19.450 $14.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 150.000 $21.830 $27.930 $28.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 100.000 $11.380 $24.820 $10.000
CONDT (RM) (1 1/2")
LF 50.000 $15.670 $19.140 $25.000
CONDT (RM) (4")
LF 50.000 $19.080 $53.710 $75.000
ELEC CONDR (NO.10) INSULATED
LF 200.000 $0.720 $1.690 $1.000
ELEC CONDR (NO.6) BARE
LF 500.000 $1.110 $1.440 $1.000
ELEC CONDR (NO.6) INSULATED
LF 250.000 $1.860 $3.070 $1.000
ELEC CONDR (NO.4) BARE
LF 100.000 $1.680 $3.300 $2.000
ELEC CONDR (NO.4) INSULATED
LF 200.000 $1.960 $3.410 $2.000
ELEC CONDR (NO.2) BARE
LF 50.000 $2.340 $5.850 $3.000
ELEC CONDR (NO.2) INSULATED
LF 100.000 $2.890 $4.310 $3.000
TRAY CABLE (3 CONDR) (12 AWG)
LF 100.000 $3.180 $5.320 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 100.000 $2.340 $5.620 $3.000
GROUND BOX TY D (162922)W/APRON
EA 5.000 $829.070 $1,292.140 $650.000
GROUND BOX TY E (122317)W/APRON
EA 5.000 $843.550 $1,292.140 $630.000
REMOVAL OF CONDUIT
LF 75.000 $5.240 $13.080 $2.000
REMOVAL OF GROUND BOXES
EA 10.000 $116.850 $355.080 $250.000
REMOVAL OF CABLES
LF 75.000 $0.650 $18.560 $1.000
REPLACE OF CABLES
LF 75.000 $1.250 $23.240 $3.000
INSTALL OF CABLES
LF 75.000 $1.320 $23.240 $2.000
REMOVAL OF CABLES BY MESSENGER CABLE
LF 500.000 $0.820 $2.130 $1.000
REPLACE OF CABLES BY MESSENGER CABLE
LF 500.000 $4.300 $3.610 $3.000
INSTALL OF CABLES BY MESSENGER CABLE
LF 1,000.000 $3.520 $4.050 $2.000
REMOVAL OF SPAN CABLE ASSM
LF 1,000.000 $1.650 $2.430 $1.000
REPLACE OF SPAN CABLE ASSM
LF 1,000.000 $1.830 $5.410 $3.000
INSTALL OF SPAN CABLE ASSM
LF 2,000.000 $2.060 $4.650 $2.000
REMOVAL OF TIMBER POLES
EA 4.000 $250.000 $865.660 $700.000
REPLACE OF TIMBER POLES
EA 4.000 $1,025.730 $1,525.500 $1,800.000
INSTALL OF TIMBER POLES
EA 4.000 $950.420 $1,357.300 $1,000.000
REMOVAL OF SIGNAL HEAD ASSM
EA 5.000 $121.250 $155.840 $150.000
REPLACE OF SIGNAL HEAD ASSM
EA 5.000 $162.830 $444.590 $715.000
INSTALL OF SIGNAL HEAD ASSM
EA 10.000 $110.720 $573.150 $530.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 15.000 $13.960 $95.110 $50.000
REPLACE OF SIGNAL RELATED SIGNS
EA 15.000 $111.410 $368.340 $200.000
INSTALL OF SIGNAL RELATED SIGNS
EA 15.000 $153.900 $308.360 $150.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $35.370 $45.280 $50.000
REPLACE OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $39.100 $145.840 $200.000
INSTALL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $131.620 $145.840 $150.000
REMOVAL OF TRAFFIC SIGNAL POLE FND
LF 5.000 $125.000 $423.280 $425.000
INSTALL OF FND FOR GROUND MNT CABINETS
EA 5.000 $167.590 $2,814.590 $3,500.000
INSTALL OF FND FOR POLE MNT CABINETS
EA 3.000 $970.840 $2,814.590 $2,400.000
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 3.000 $422.500 $1,617.470 $1,500.000
REPLACE OF CONTROL CABINET(GRND MNT)
EA 3.000 $2,737.590 $4,056.240 $8,500.000
INSTALL OF CONTROL CABINET(GRND MNT)
EA 3.000 $2,416.770 $3,456.390 $7,500.000
REMOVAL OF CONTROL CABINET(POLE MNT)
EA 3.000 $175.000 $2,073.360 $1,000.000
REPLACE OF CONTROL CABINET(POLE MNT)
EA 3.000 $626.980 $3,456.390 $8,500.000
INSTALL OF CONTROL CABINET(POLE MNT)
EA 3.000 $825.000 $3,456.390 $7,500.000
REMOVAL OF FLASHER CABINET
EA 3.000 $240.710 $628.070 $1,000.000
REPLACE OF FLASHER CABINET
EA 3.000 $750.730 $2,139.460 $1,400.000
INSTALL OF FLASHER CABINET
EA 3.000 $522.960 $2,139.460 $900.000
REMOVAL OF RDSD FLSH BEACON ASSM
EA 3.000 $432.520 $1,558.190 $1,800.000
REPLACE OF RDSD FLSH BEACON ASSM
EA 3.000 $2,834.000 $6,172.570 $3,600.000
INSTALL OF RDSD FLSH BEACON ASSM
EA 3.000 $2,767.330 $6,172.570 $2,700.000
REMOVAL OF SIGNAL POLE ASSM
EA 5.000 $715.770 $2,233.550 $1,400.000
REPLACE OF SIGNAL POLE ASSM
EA 6.000 $1,581.000 $2,809.090 $2,700.000
INSTALL OF SIGNAL POLE ASSM
EA 6.000 $1,882.900 $2,809.090 $1,800.000
REMOVAL OF LUMINAIRE HEAD
EA 5.000 $115.000 $258.990 $150.000
REPLACE OF LUMINAIRE HEAD
EA 15.000 $181.660 $492.810 $550.000
INSTALL OF LUMINAIRE HEAD
EA 10.000 $159.670 $459.880 $400.000
REMOVAL OF LUMINAIRE MAST ARMS
EA 5.000 $123.330 $305.800 $550.000
REPLACE OF LUMINAIRE MAST ARMS
EA 5.000 $223.430 $398.720 $900.000
INSTALL OF LUMINAIRE MAST ARMS
EA 5.000 $233.350 $305.800 $150.000
INS OF TRF SIG PL FND (24" DRIL SHFT)
LF 80.000 $149.860 $166.660 $245.000
INS OF TRF SIG PL FND (30" DRIL SHFT)
LF 30.000 $197.080 $290.800 $285.000
INS OF TRF SIG PL FND (36" DRIL SHFT)
LF 30.000 $254.140 $321.820 $300.000
INSTL DOWN GUY W/GUARD
EA 4.000 $319.820 $421.070 $200.000
REPLACE DOWN GUY W/GUARD
EA 4.000 $300.000 $421.070 $250.000
INSTL DOWN GUY AND ANCHOR W/GUARD
EA 4.000 $340.930 $413.540 $300.000
REPLACE DOWN GUY AND ANCHOR W/GUARD
EA 4.000 $398.860 $533.510 $200.000
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 6.000 $566.000 $1,335.340 $1,500.000
INSTL PED POLE ASSM
EA 2.000 $1,684.420 $2,725.200 $2,000.000
REPLACE PED POLE ASSM
EA 2.000 $990.190 $2,627.810 $2,400.000
REMOVE PED POLE ASSM
EA 2.000 $259.450 $1,277.320 $400.000
REPLACE LED TRAF SIG LAMP UNIT
EA 100.000 $63.330 $69.690 $150.000
REPLACE PED SIG LED TRAF SIG LAMP UNIT
EA 20.000 $50.000 $251.700 $150.000
INSTALL PED SGN LED TRAF SIG AMP UNIT
EA 10.000 $73.550 $251.700 $100.000
REPLACE SPREAD SPECTRUM ANTENNA
EA 3.000 $1,027.890 $361.870 $200.000
INSTALL SPREAD SPECTRUM ANTENNA
EA 2.000 $1,049.670 $538.680 $175.000
SALVAGE TRAFFIC SIGNAL
EA 4.000 $1,866.780 $5,645.640 $5,500.000
INSTALL SCREW-IN FND
EA 3.000 $657.230 $1,175.230 $1,000.000
REMOVE SCREW-IN FND
EA 8.000 $357.940 $162.310 $1,000.000
REPLACE CONTROLLER BREAKAWAY BASE
EA 4.000 $1,571.600 $1,736.030 $8,000.000
INSTALL BBU SYSTEM
EA 5.000 $908.850 $1,858.170 $575.000
REPLACE BBU SYSTEM
EA 5.000 $901.520 $1,195.700 $705.000
INSTALL RADAR VEHICLE DETECTION SYSTEM
EA 4.000 $2,544.190 $1,881.880 $4,000.000
REPLACE RADAR VEHICLE DETECTION SYSTEM
EA 4.000 $2,459.250 $1,881.880 $5,000.000
REMOVE RADAR VEHICLE DETECTION SYSTEM
EA 4.000 $714.800 $1,529.020 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $132.030 $321.970 $120.000
ITS COM CBL (ETHERNET)
LF 100.000 $4.420 $4.450 $4.000
CONDUIT (PREPARE)
LF 250.000 $2.320 $6.800 $5.000
GROUND BOX (PREPARE)
EA 5.000 $120.070 $389.780 $350.000
COAXIAL CABLE
LF 150.000 $3.420 $3.880 $4.000
PREVENTATIVE MAINT (TRAFFIC SIGNALS)
EA 100.000 $769.300 $367.560 $2,290.000
Totals: $393,789.970 $553,358.580 $770,000.000