Bid Cobra

TARRANT IH0820 (6314-53-001)

Items: 64

County: TARRANT
Length: N/A
Highway: IH0820
District: FORT WORTH
Control Number: 6314-53-001
DBE Goal: N/A
Project: RMC - 631453001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $2,131,175.00
Date: 10/03/2017 (8 years ago)
Contract Number: N/A
Type: GUARDRAIL INSTALLATION/REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,131,175.00
$1,852,110.00
Over/Under Est: -13.09% -$279,065.00
$3,431,266.50
Over/Under Est: 61% $1,300,091.50
Amt Left: 85.26% $1,579,156.50

Bid Items & Bid Tabulations

64 Total 0 of 64
TARRANT  |  IH0820  |  FORT WORTH  |  6314-53-001  |  10/03/2017  |  $2,131,175.00  |  RMC - 631453001  |  GUARDRAIL INSTL/REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VANN/ELLI, INC.
DCI CONTRACTING, INC.
MOBILIZATION (CALLOUT)
EA 26.000 $800.000 $100.000 $3,450.000
MOBILIZATION (EMERGENCY)
EA 2.000 $800.000 $500.000 $4,554.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $28.000 $20.200 $41.400
TERMINAL ANCHOR SECTION
EA 3.000 $500.000 $575.000 $5,520.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,000.000 $1,620.000 $3,105.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 500.000 $12.000 $20.200 $34.500
SHORT RADIUS
LF 500.000 $30.000 $26.000 $41.400
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $800.000 $500.000 $2,208.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,350.000 $1,100.000 $2,208.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 3.000 $2,000.000 $1,620.000 $4,140.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $5.000 $3.000 $13.800
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $100.000 $100.000 $483.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 2.000 $800.000 $700.000 $2,070.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $200.000 $100.000 $552.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 2.000 $2,700.000 $2,300.000 $6,900.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 5.000 $2,700.000 $2,675.000 $6,900.000
CHAIN LINK FENCE (REMOVE)
LF 100.000 $5.000 $2.000 $13.800
CHAIN LINK FENCE (REPAIR) (4')
LF 600.000 $25.000 $13.000 $41.400
REPAIR RAIL ELEMENT (W - BEAM)
LF 50,000.000 $11.000 $9.500 $41.400
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $35.000 $25.000 $138.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 30.000 $35.000 $25.000 $138.000
RAISE RAIL ELEMENT
LF 1,000.000 $8.000 $5.000 $34.500
REALIGN EXISTING RAIL
LF 200.000 $8.000 $5.000 $55.200
REM / REPL TIMBER/STL POST W/O CONC FND
EA 2,000.000 $45.000 $45.000 $13.800
REM / REPL TIMBER / STL POST W/CONC FND
EA 75.000 $80.000 $60.000 $20.700
REALIGN POSTS
EA 2,500.000 $10.000 $14.000 $13.800
REMOVE & REPLACE BLOCKOUT
EA 200.000 $25.000 $15.000 $138.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 6,000.000 $16.000 $13.000 $27.600
REPLACE SINGLE GDRAIL TERMINAL POST
EA 750.000 $60.000 $66.000 $20.700
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $50.000 $20.000 $690.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 200.000 $3,000.000 $2,400.000 $483.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $825.000 $800.000 $552.000
REM & RESET SGT IMPACT HEAD
EA 100.000 $150.000 $100.000 $345.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $50.000 $25.000 $414.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $200.000 $25.000 $414.000
REPLACE SGT STRUT
EA 10.000 $75.000 $25.000 $414.000
REPLACE SGT OBJECT MARKER
EA 50.000 $45.000 $30.000 $69.000
REPAIR STEEL POST WITH BASE PLATE
EA 200.000 $100.000 $175.000 $82.800
REPLACE POSTS (TL-3)
EA 750.000 $100.000 $90.000 $55.200
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 2.000 $125.000 $300.000 $690.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $45.000 $50.000 $2,760.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 2.000 $1,000.000 $2,000.000 $2,760.000
REPLACE CABLE (TL-3)
LF 100.000 $5.000 $4.000 $69.000
CHECK / RE-TENSION CABLE
EA 10.000 $1,000.000 $300.000 $345.000
POST AND CABLE FENCE (REMOVAL)
LF 200.000 $10.000 $1.000 $27.600
POST AND CABLE FENCE (NEW INSTALLATION)
LF 200.000 $20.000 $5.000 $82.800
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 50.000 $50.000 $50.000 $276.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 200.000 $10.000 $2.000 $41.400
POST AND CABLE FENCE (REPAIR)
LF 1,000.000 $12.000 $3.000 $41.400
REMOVE AND REPLACE (TRACC)
EA 5.000 $13,500.000 $14,550.000 $20,700.000
REMOVE AND REPLACE (NARROW REACT 350)
EA 5.000 $18,000.000 $18,900.000 $20,700.000
REPAIR (TRACC)
EA 10.000 $3,000.000 $1,000.000 $1,035.000
REPAIR (REACT)
EA 25.000 $2,000.000 $2,000.000 $1,380.000
REPAIR REACT (N) (MISC HARDWARE)
EA 10.000 $800.000 $600.000 $1,380.000
REPAIR REACT (N) (CYLINDERS)
EA 4.000 $2,000.000 $2,500.000 $2,760.000
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $18,000.000 $21,000.000 $1,380.000
REPAIR (SMTC) (N)
EA 10.000 $2,000.000 $2,500.000 $1,380.000
REMOVE AND REPLACE (SHORTRACC)
EA 2.000 $10,000.000 $11,500.000 $12,420.000
REPAIR (SHORTRACC)
LF 2.000 $800.000 $300.000 $4,140.000
REMOVE AND REPLACE (TAU II) (N)
EA 1.000 $15,000.000 $15,500.000 $6,210.000
REPAIR TAU II (N) (MISC HARDWARE)
EA 1.000 $2,500.000 $2,000.000 $2,760.000
REPAIR TAU II (N)
LF 2.000 $400.000 $300.000 $345.000
REPAIR (BEAT - SSCC)
LF 100.000 $250.000 $100.000 $69.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 2.000 $200.000 $200.000 $690.000
Totals: $2,131,175.000 $1,852,110.000 $3,431,266.500