PREPARING ROW
|
STA
|
7.000
|
$2,000.000
|
$2,800.000
|
$11,550.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
171.000
|
$15.000
|
$20.000
|
$31.500
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
65.000
|
$25.000
|
$15.000
|
$73.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,414.000
|
$15.000
|
$26.000
|
$21.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
210.000
|
$15.000
|
$33.000
|
$3.150
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,353.000
|
$15.000
|
$33.000
|
$42.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
50.000
|
$50.000
|
$100.000
|
$31.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
950.000
|
$5.000
|
$7.000
|
$6.750
|
|
|
BLOCK SODDING
|
SY
|
950.000
|
$5.000
|
$6.000
|
$3.680
|
|
|
VEGETATIVE WATERING
|
MG
|
33.250
|
$50.000
|
$106.000
|
$315.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
44.900
|
$200.000
|
$150.000
|
$146.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
1,870.000
|
$8.000
|
$6.000
|
$3.150
|
|
|
PRIME COAT (EC-30)
|
GAL
|
374.000
|
$10.000
|
$5.750
|
$5.500
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
385.440
|
$125.000
|
$95.000
|
$105.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
1,573.000
|
$67.000
|
$80.000
|
$84.000
|
|
|
CEM STABIL BKFL
|
CY
|
14.000
|
$200.000
|
$150.000
|
$150.000
|
|
|
CUT & RESTORING PAV
|
SY
|
31.000
|
$150.000
|
$420.000
|
$315.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
38.000
|
$20.000
|
$10.000
|
$21.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,590.000
|
$30.000
|
$30.000
|
$10.500
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
12.000
|
$300.000
|
$293.000
|
$285.950
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
231.000
|
$425.000
|
$550.000
|
$525.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
10.800
|
$600.000
|
$700.000
|
$735.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
24.000
|
$700.000
|
$600.000
|
$735.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
4.300
|
$1,000.000
|
$500.000
|
$840.000
|
|
|
RAIL (TY SSTR)
|
LF
|
96.000
|
$65.000
|
$124.000
|
$157.500
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
240.000
|
$90.000
|
$220.000
|
$210.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
46.000
|
$80.000
|
$95.000
|
$105.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
58.000
|
$90.000
|
$124.000
|
$126.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
127.000
|
$85.000
|
$95.000
|
$111.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
1.000
|
$4,500.000
|
$3,000.000
|
$3,150.000
|
|
|
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
|
EA
|
1.000
|
$4,000.000
|
$4,000.000
|
$5,250.000
|
|
|
INLET (COMPL)(DROP)(TY 3)
|
EA
|
1.000
|
$4,000.000
|
$6,000.000
|
$3,150.000
|
|
|
INLET (COMPL)(CURB)(TY 1)(10'X3')
|
EA
|
1.000
|
$10,000.000
|
$5,000.000
|
$7,350.000
|
|
|
INLET (COMPL)(CURB)(TY 1)(5'X3')
|
EA
|
2.000
|
$9,700.000
|
$4,700.000
|
$6,300.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$5,000.000
|
$3,500.000
|
$2,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$91,737.000
|
$103,500.000
|
$134,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$7,000.000
|
$18,500.000
|
$21,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
44.000
|
$40.000
|
$50.000
|
$22.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
44.000
|
$20.000
|
$8.000
|
$8.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
275.000
|
$10.000
|
$7.000
|
$7.350
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
275.000
|
$3.500
|
$3.000
|
$1.100
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
600.000
|
$32.000
|
$65.000
|
$31.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$30.000
|
$65.000
|
$63.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$40.000
|
$16.000
|
$11.550
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
540.000
|
$10.000
|
$16.000
|
$6.300
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
600.000
|
$7.000
|
$17.000
|
$6.300
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$8.000
|
$17.000
|
$12.600
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
745.000
|
$10.000
|
$2.000
|
$4.200
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
675.000
|
$40.000
|
$45.000
|
$42.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
395.000
|
$60.000
|
$51.000
|
$63.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$2,000.000
|
$1,800.000
|
$3,150.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
12.500
|
$40.000
|
$26.400
|
$25.800
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$1,100.000
|
$1,485.000
|
$1,451.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,000.000
|
$2,167.000
|
$2,117.750
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$15,000.000
|
$8,332.500
|
$8,143.130
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$825.000
|
$806.250
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
25.000
|
$20.000
|
$60.280
|
$58.910
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
55.000
|
$30.000
|
$68.390
|
$66.830
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,345.000
|
$2.000
|
$1.290
|
$1.260
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
38.000
|
$3.500
|
$6.670
|
$6.510
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
1.000
|
$1,500.000
|
$1,033.290
|
$1,009.800
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
6.000
|
$50.000
|
$50.130
|
$48.990
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$510.000
|
$420.370
|
$410.810
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$550.000
|
$515.010
|
$503.310
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$525.000
|
$711.840
|
$695.660
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
220.000
|
$2.000
|
$2.200
|
$2.150
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
27.000
|
$3.000
|
$2.200
|
$2.150
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
560.000
|
$2.000
|
$2.200
|
$2.150
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
270.000
|
$4.000
|
$2.200
|
$2.150
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
6.000
|
$150.000
|
$165.000
|
$161.250
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
6.000
|
$150.000
|
$275.000
|
$268.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,127.000
|
$3.000
|
$2.200
|
$2.150
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
30.000
|
$1.500
|
$1.100
|
$1.080
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
910.000
|
$2.500
|
$1.100
|
$1.080
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
74.000
|
$3.000
|
$3.850
|
$3.760
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
133.000
|
$8.000
|
$6.600
|
$6.450
|
|
|
PAVEMENT SEALER 4"
|
LF
|
805.000
|
$0.150
|
$0.280
|
$0.270
|
|
|
PAVEMENT SEALER 8"
|
LF
|
732.000
|
$0.500
|
$0.550
|
$0.540
|
|
|
PAVEMENT SEALER 12"
|
LF
|
74.000
|
$1.250
|
$1.650
|
$1.610
|
|
|
PAVEMENT SEALER 24"
|
LF
|
133.000
|
$2.000
|
$2.750
|
$2.690
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
6.000
|
$35.000
|
$55.000
|
$53.750
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$40.000
|
$82.500
|
$80.630
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
4.000
|
$75.000
|
$110.000
|
$107.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
225.000
|
$1.500
|
$2.750
|
$2.690
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
765.000
|
$1.500
|
$2.750
|
$2.690
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
915.000
|
$1.500
|
$2.750
|
$2.690
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$225.000
|
$203.500
|
$198.880
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
4.000
|
$375.000
|
$302.500
|
$295.630
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
1.000
|
$375.000
|
$412.500
|
$403.130
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
7.000
|
$275.000
|
$258.500
|
$252.630
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
59.000
|
$8.000
|
$5.500
|
$5.380
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,120.000
|
$0.500
|
$0.550
|
$0.540
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
500.000
|
$0.800
|
$1.100
|
$1.080
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
72.000
|
$0.800
|
$1.650
|
$1.610
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
130.000
|
$3.000
|
$1.650
|
$1.610
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$45.000
|
$44.000
|
$43.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$50.000
|
$66.000
|
$64.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,097.000
|
$0.100
|
$0.110
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
178.000
|
$0.250
|
$0.220
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
1.000
|
$35.000
|
$60.500
|
$59.130
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$25.000
|
$60.500
|
$59.130
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$4,620.000
|
$4,515.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
3.000
|
$300.000
|
$257.400
|
$251.550
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
3.000
|
$300.000
|
$257.400
|
$251.550
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
3.000
|
$300.000
|
$257.400
|
$251.550
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
2.000
|
$800.000
|
$421.850
|
$412.270
|
|
|
BACK PLATE (12")(3 SEC)ALUM
|
EA
|
3.000
|
$300.000
|
$124.580
|
$121.740
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
828.000
|
$4.000
|
$1.560
|
$1.530
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
321.000
|
$4.000
|
$2.110
|
$2.060
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$8,250.000
|
$8,044.690
|
$7,861.850
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$2,500.000
|
$3,077.800
|
$3,007.850
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
2.000
|
$1,000.000
|
$995.500
|
$972.880
|
|
|
REMOVAL OF GROUND BOXES
|
EA
|
1.000
|
$500.000
|
$693.000
|
$677.250
|
|
|
REMOVE CONDUCTOR
|
LF
|
1,135.000
|
$2.000
|
$1.160
|
$1.130
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$120.000
|
$75.000
|
$189.000
|
|
|
FO CBL (72 SMF)
|
LF
|
10,840.000
|
$2.500
|
$6.380
|
$6.240
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
4.000
|
$2,010.000
|
$1,607.380
|
$1,570.850
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
120.000
|
$68.000
|
$64.410
|
$62.940
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
10,810.000
|
$1.500
|
$1.790
|
$1.750
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
900.000
|
$20.000
|
$35.880
|
$35.070
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
860.000
|
$31.000
|
$28.170
|
$27.530
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
1.000
|
$3,500.000
|
$6,368.780
|
$6,224.040
|
|
Totals: |
$1,010,231.550
|
$1,256,871.320
|
$1,313,393.860
|