TARRANT SS 303 (2208-01-071)

Items: 99

County: TARRANT
Length: 0.0390 MILES
Highway: SS 303
District: FORT WORTH
Control Number: 2208-01-071
DBE Goal: 6.0%
Project: BR 2025(354)
Guaranty: $100,000.00
Time: 278 WORKING DAYS
Engineer's Estimate: $8,152,678.40
Date: 01/08/2025 (1 year ago)
Contract Number: 1253211
Type: BRIDGE MAINTENANCE
Project ID: A00063792
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
MARIBEL RANGEL
JUSTIN THOMEY
RAUL OROZCO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$8,152,678.40
1
Awarded
$7,221,685.35
Over/Under Est: -11.42% -$930,993.05
Over/Under Est: -7.09% -$578,267.93
Amt Left: 4.88% $352,725.12
Over/Under Est: -3.99% -$325,202.10
Amt Left: 8.39% $605,790.95
Delta: -3.34% -$253,065.83
Over/Under Est: -3.25% -$264,678.40
Amt Left: 9.23% $666,314.65
Delta: -0.77% -$60,523.70
Over/Under Est: -2.44% -$198,838.56
Amt Left: 10.14% $732,154.49
Delta: -0.83% -$65,839.84
$8,144,562.64
Over/Under Est: -0.1% -$8,115.76
Amt Left: 12.78% $922,877.29
Delta: -2.40% -$190,722.80
Over/Under Est: 0.53% $43,211.12
Amt Left: 13.49% $974,204.17
Delta: -0.63% -$51,326.88
Subcontractor Percentage Amount
AXIS CONTRACTING, INC. 13.53% $988,497.20
BEAIRD DRILLING SERVICES, INC. 7.77% $567,673.56
PEACHTREE CONSTRUCTION, LTD. 6.75% $493,152.71
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.52% $111,050.68
TRP CONSTRUCTION GROUP, LLC 0.93% $67,945.48
DUSTROL, INC. 0.54% $39,452.22
DALLAS LITE AND BARRICADE, INC. 0.38% $27,762.67
FORTSON CONTRACTING, INC. 0.32% $23,379.09
EMERY SAPP & SON'S INC. 0.16% $11,689.55
PENHALL COMPANY 0.16% $11,689.55
Total: 32.06% $2,342,292.71

Bid Items & Bid Tabulations

99 Total 0 of 99
TARRANT  |  SS 303  |  FORT WORTH  |  2208-01-071  |  01/08/2025  |  $8,152,678.40  |  BR 2025(354)  |  BRIDGE MAINT  |  278 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IBCTX, LLC
INDUS ROAD & BRIDGE, INC.
STERLING DELAWARE HOLDING COMPANY
ED BELL CONSTRUCTION COMPANY
MP HEAVY CONSTRUCTION INC
ALTUS CONSTRUCTION LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 5.800 $7,500.000 $8,000.000 $102,859.460 $67,241.000 $52,137.930 $4,500.000 $139,724.860 $135,000.000
REMOV CONC (PAV)
SY 3,362.000 $20.000 $25.000 $30.000 $19.000 $21.000 $28.000 $20.530 $22.000
REMOV CONC (CURB)
LF 2,776.000 $15.000 $11.000 $6.000 $12.000 $21.000 $12.000 $8.510 $2.200
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 3,925.000 $15.000 $11.000 $16.000 $20.000 $5.250 $20.000 $5.960 $11.000
EXCAV (ROADWAY & CHANNEL)
CY 835.000 $50.000 $58.000 $36.000 $128.000 $50.000 $45.000 $21.270 $90.000
EMBANK (FNL)(DC)(TY B)
CY 364.000 $30.000 $77.000 $25.000 $10.000 $75.000 $65.000 $22.240 $80.000
COMPOST MANUF TOPSOIL (4")
SY 1,332.000 $5.000 $5.000 $2.500 $10.000 $5.250 $2.500 $3.400 $8.500
BLOCK SODDING
SY 8,034.000 $10.000 $5.000 $5.000 $3.950 $5.250 $4.740 $5.670 $6.700
BROADCAST SEED (TEMP_WARM_COOL)
SY 8,034.000 $1.000 $0.600 $0.300 $0.550 $0.550 $0.660 $0.230 $0.550
VEGETATIVE WATERING
TGL 562.000 $26.000 $60.000 $21.000 $31.000 $3.150 $68.340 $1.130 $98.000
IRRIGATION SYSTEM
LS 1.000 $20,000.000 $20,000.000 $15,000.000 $18,775.570 $19,000.000 $22,530.680 $57,853.490 $18,775.570
LIME (COM OR QK)(SLURRY)
TON 45.000 $220.000 $475.000 $350.000 $306.000 $450.000 $367.200 $386.480 $310.000
LIME TRT (EXIST MATL)(8")
SY 2,723.000 $14.000 $19.000 $10.000 $25.000 $10.000 $17.000 $5.100 $7.600
PRIME COAT(MC-30 OR AE-P)
GAL 545.000 $10.000 $11.000 $12.000 $10.000 $10.500 $12.000 $5.530 $8.800
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 626.000 $150.000 $160.000 $175.000 $153.000 $168.000 $183.600 $178.450 $155.000
CONC PVMT (CRCP) (8")
SY 2,492.000 $140.000 $147.000 $80.000 $70.000 $125.000 $125.000 $173.870 $87.000
CEM STABIL BKFL
CY 1,174.000 $260.000 $220.000 $231.000 $130.000 $222.000 $199.200 $201.990 $137.000
TRENCH EXCAVATION PROTECTION
LF 390.000 $22.000 $25.000 $22.000 $1.000 $12.000 $29.990 $8.510 $1.000
TEMPORARY SPL SHORING
SF 769.000 $48.000 $25.000 $47.000 $47.000 $105.000 $42.940 $30.510 $56.000
DRILL SHAFT (18 IN)
LF 272.000 $140.000 $190.000 $200.000 $118.250 $175.000 $153.530 $196.900 $130.000
DRILL SHAFT (36 IN)
LF 3,124.000 $285.000 $300.000 $290.000 $218.900 $300.000 $222.500 $297.270 $229.000
CL C CONC (ABUT)(HPC)
CY 136.800 $1,500.000 $1,300.000 $850.000 $1,800.000 $1,500.000 $1,620.000 $1,145.520 $784.000
CL C CONC (CAP)(HPC)
CY 128.600 $1,800.000 $1,000.000 $1,100.000 $1,800.000 $1,500.000 $1,305.000 $1,241.130 $1,122.000
CL C CONC (COLUMN)(HPC)
CY 32.700 $1,750.000 $2,100.000 $1,500.000 $2,250.000 $3,000.000 $1,530.000 $2,334.630 $1,600.000
REINF CONC SLAB (HPC)
SF 28,160.000 $30.000 $27.000 $23.000 $33.000 $25.000 $28.420 $24.940 $28.000
APPROACH SLAB (HPC)
CY 710.400 $750.000 $520.000 $500.000 $405.000 $400.000 $850.000 $527.080 $586.000
BRIDGE MEDIAN (HPC)
SF 5,720.000 $19.000 $13.000 $15.000 $10.000 $15.000 $25.000 $15.080 $14.100
PRESTR CONC GIRDER (TX28)
LF 4,249.320 $220.000 $195.000 $195.000 $280.000 $225.000 $182.200 $220.450 $189.000
RIPRAP (MOW STRIP)(4 IN)
CY 39.600 $700.000 $900.000 $700.000 $850.000 $900.000 $745.000 $535.570 $691.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 891.000 $160.000 $155.000 $200.000 $250.000 $222.000 $175.380 $156.220 $173.000
RAIL (TY C223)(HPC)
LF 643.200 $400.000 $215.000 $152.000 $282.000 $222.000 $150.000 $96.380 $161.000
RAIL (TY PR11)
LF 496.000 $190.000 $95.000 $125.000 $118.000 $155.000 $144.000 $147.810 $78.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 250.000 $140.000 $130.000 $145.000 $220.000 $175.000 $150.000 $138.050 $123.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $140,000.000 $100,000.000 $105,000.000 $120,000.000 $210,000.000 $150,000.000 $236,545.890 $600,000.000
MOBILIZATION
LS 1.000 $729,300.000 $722,000.000 $750,000.000 $780,000.000 $787,285.970 $1,439,460.000 $806,231.820 $760,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $10,000.000 $4,000.000 $13,250.000 $13,060.000 $31,500.000 $4,000.000 $29,777.530 $35,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $25,000.000 $19,000.000 $12,000.000 $15,750.000 $12,000.000 $19,284.500 $30,000.000
TMA (STATIONARY)
DAY 16.000 $175.000 $150.000 $200.000 $200.000 $315.000 $990.000 $170.160 $500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $33.000 $53.000 $36.000 $50.540 $35.000 $60.650 $66.020 $50.540
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $11.000 $21.500 $10.000 $20.480 $10.000 $24.580 $51.050 $20.480
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,535.000 $3.000 $8.000 $4.000 $6.000 $5.250 $5.410 $5.670 $4.510
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,535.000 $1.000 $4.000 $1.100 $1.470 $1.100 $1.760 $1.130 $1.470
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 65.000 $8.000 $20.000 $8.000 $11.450 $16.000 $13.740 $5.670 $11.450
BIODEG EROSN CONT LOGS (REMOVE)
LF 65.000 $2.000 $10.000 $2.000 $4.290 $4.000 $5.150 $1.130 $4.290
CONSTRUCTING DETOURS
SY 4,944.000 $110.000 $108.000 $100.000 $90.000 $75.000 $100.080 $79.310 $100.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 4,080.000 $80.000 $38.000 $65.000 $60.000 $30.000 $27.130 $53.330 $50.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 7,290.000 $18.000 $16.000 $15.000 $9.000 $10.000 $9.620 $4.050 $6.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 4,080.000 $20.000 $16.000 $9.000 $11.000 $15.000 $12.000 $11.660 $6.000
CONC CURB (MONO) (TY II)
LF 1,189.000 $20.000 $19.000 $12.000 $14.000 $9.000 $35.280 $6.810 $12.000
CONC CURB (DOWELED)
LF 3,938.000 $20.000 $32.000 $35.000 $23.000 $10.000 $32.760 $11.060 $16.000
CONC MEDIAN
SY 282.000 $200.000 $160.000 $220.000 $125.000 $315.000 $132.300 $93.590 $81.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 350.000 $50.000 $24.000 $50.000 $22.000 $23.100 $26.400 $58.700 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,100.000 $1,870.000 $2,100.000 $2,285.130 $2,735.620 $2,130.000 $1,938.090 $2,550.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,600.000 $1,155.000 $1,700.000 $1,100.000 $1,155.000 $1,320.000 $1,276.180 $1,100.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,000.000 $710.000 $1,000.000 $675.000 $708.750 $810.000 $879.710 $675.000
REMOVE METAL BEAM GUARD FENCE
LF 425.000 $6.000 $4.000 $8.000 $3.500 $3.680 $4.200 $2.550 $3.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $330.000 $265.000 $300.000 $250.000 $412.870 $300.000 $212.700 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $3,000.000 $3,000.000 $2,860.000 $3,003.000 $3,432.000 $2,809.300 $2,860.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $370.000 $265.000 $380.000 $250.000 $262.500 $300.000 $253.610 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 9.000 $2,000.000 $2,200.000 $1,500.000 $1,235.000 $1,478.930 $1,482.000 $1,442.080 $800.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,300.000 $1,200.000 $900.000 $825.000 $739.470 $990.000 $850.790 $900.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $10,000.000 $9,000.000 $7,075.000 $10,728.860 $8,490.000 $11,945.040 $8,500.000
ITS GND BOX TY 2 (603636)
EA 1.000 $2,000.000 $4,800.000 $6,500.000 $25,000.000 $3,150.000 $5,800.000 $2,467.280 $4,500.000
REMOVE ITS GROUND BOX
EA 1.000 $1,000.000 $1,600.000 $1,800.000 $5,000.000 $525.000 $1,740.000 $377.010 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $460.000 $1,500.000 $700.000 $650.000 $735.000 $1,074.000 $645.190 $1,100.000
REMOVE SM RD SN SUP&AM
EA 1.000 $152.000 $350.000 $125.000 $25.000 $115.500 $162.000 $97.840 $179.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 9.000 $15.000 $21.000 $35.000 $20.000 $21.000 $24.000 $28.080 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 9.000 $26.000 $26.000 $60.000 $25.000 $26.250 $30.000 $28.080 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $80.000 $55.000 $70.000 $50.000 $52.500 $60.000 $64.220 $50.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 3,010.000 $1.000 $1.050 $1.000 $1.000 $3.150 $3.600 $0.790 $3.000
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 633.000 $2.000 $2.800 $1.000 $2.650 $3.150 $3.600 $0.790 $3.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 6,777.000 $1.000 $1.050 $1.000 $1.000 $1.840 $2.100 $0.790 $1.750
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,562.000 $1.000 $2.450 $1.200 $2.300 $2.100 $2.400 $1.210 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 66.000 $7.000 $8.300 $14.000 $7.900 $15.750 $18.000 $13.030 $15.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 14.000 $120.000 $265.000 $25.000 $250.000 $351.750 $402.000 $21.240 $335.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 6.000 $130.000 $265.000 $25.000 $250.000 $525.000 $600.000 $23.600 $500.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 16,356.000 $1.000 $1.050 $1.000 $1.000 $1.840 $2.100 $0.790 $1.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 45.000 $10.000 $10.000 $1.500 $2.000 $4.580 $1.440 $1.000 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 412.000 $1.000 $1.400 $1.000 $1.300 $5.250 $6.000 $1.020 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 5.000 $200.000 $190.000 $120.000 $178.000 $210.000 $240.000 $121.050 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $200.000 $230.000 $200.000 $215.000 $367.500 $420.000 $181.570 $350.000
PAVEMENT SLER 6"
LF 18,002.000 $1.000 $0.250 $0.300 $0.240 $0.530 $0.600 $0.230 $0.500
PAVEMENT SLER 8"
LF 412.000 $1.000 $0.400 $0.400 $0.350 $1.050 $1.200 $0.290 $1.000
PAVEMENT SLER (ARROW)
EA 5.000 $62.000 $40.000 $35.000 $35.000 $52.500 $60.000 $30.790 $50.000
PAVEMENT SLER (WORD)
EA 5.000 $74.000 $45.000 $38.000 $43.000 $63.000 $72.000 $34.200 $60.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,906.000 $1.000 $1.000 $1.000 $0.870 $2.100 $2.400 $0.840 $2.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 6,633.000 $1.000 $1.000 $1.000 $0.870 $1.580 $1.800 $0.840 $1.500
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 7,463.000 $1.000 $1.000 $1.000 $0.870 $1.580 $1.800 $0.790 $1.500
REFL PAV MRKR TY II-C-R
EA 196.000 $6.000 $6.500 $14.000 $6.000 $10.500 $12.000 $12.820 $10.000
ELIM EXT PM & MRKS (4")
LF 10,034.000 $0.500 $0.550 $0.500 $0.500 $1.370 $1.200 $0.510 $1.000
ELIM EXT PM & MRKS (8")
LF 205.000 $1.200 $1.000 $1.000 $0.930 $5.250 $2.400 $1.020 $2.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $75.000 $55.000 $18.000 $52.000 $210.000 $180.000 $15.520 $150.000
ELIM EXT PM & MRKS (WORD)
EA 2.000 $75.000 $64.000 $20.000 $61.000 $262.500 $240.000 $17.240 $200.000
PAV SURF PREP FOR MRK (6")
LF 44,778.000 $1.000 $0.050 $0.200 $0.020 $0.210 $0.240 $0.180 $0.200
PAV SURF PREP FOR MRK (8")
LF 1,974.000 $1.000 $0.100 $0.300 $0.090 $1.050 $1.200 $0.240 $1.000
PAV SURF PREP FOR MRK (24")
LF 66.000 $1.000 $0.700 $3.000 $0.660 $3.150 $3.600 $2.750 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 19.000 $40.000 $16.000 $30.000 $15.500 $42.000 $48.000 $24.650 $40.000
PAV SURF PREP FOR MRK (WORD)
EA 11.000 $45.000 $19.000 $30.000 $18.500 $52.500 $60.000 $27.400 $50.000
TREE REMOVAL (4" - 12" DIA)
EA 9.000 $300.000 $2,000.000 $5,000.000 $750.000 $787.500 $287.540 $76.570 $750.000
Totals: $8,152,678.400 $7,221,685.350 $7,574,410.468 $7,827,476.300 $7,888,000.004 $7,953,839.844 $8,144,562.637 $8,195,889.520