|
|
PREPARING ROW
|
STA
|
13.000
|
$3,500.000
|
$1,500.000
|
$7,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
10.000
|
$75.000
|
$33.000
|
$75.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
171.000
|
$25.000
|
$15.000
|
$21.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
516.000
|
$20.000
|
$17.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
397.000
|
$25.000
|
$20.000
|
$12.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
533.000
|
$25.000
|
$20.000
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,188.000
|
$20.000
|
$50.000
|
$45.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
233.000
|
$25.000
|
$130.000
|
$15.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,856.000
|
$2.750
|
$4.000
|
$3.400
|
|
|
BLOCK SODDING
|
SY
|
1,856.000
|
$6.000
|
$7.000
|
$5.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
1,856.000
|
$6.000
|
$0.010
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
387.000
|
$125.000
|
$0.010
|
$5.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
2,322.000
|
$25.000
|
$30.000
|
$50.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
39.000
|
$300.000
|
$400.000
|
$500.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
2,350.000
|
$10.000
|
$25.000
|
$15.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
696.000
|
$5.000
|
$0.010
|
$6.100
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(15")
|
SY
|
704.000
|
$125.000
|
$150.000
|
$175.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
32,105.000
|
$2.000
|
$0.750
|
$3.000
|
|
|
FULL-DEPTH REPAIR CRCP (8"-10")
|
SY
|
250.000
|
$300.000
|
$400.000
|
$435.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
80.000
|
$100.000
|
$355.000
|
$400.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
299.000
|
$5.000
|
$2.000
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$1,250.000
|
$550.000
|
$1,500.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
411.000
|
$400.000
|
$440.000
|
$750.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
150.000
|
$75.000
|
$105.000
|
$150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
40.000
|
$90.000
|
$125.000
|
$300.000
|
|
|
MANH (COMPL) (JUNCT BOX)(SPL W/RISER)
|
EA
|
2.000
|
$16,000.000
|
$27,000.000
|
$30,000.000
|
|
|
MANH (BOX CULV)
|
EA
|
1.000
|
$10,000.000
|
$12,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$15,000.000
|
$10,000.000
|
$25,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$2,200.000
|
$1,750.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$2,500.000
|
$2,500.000
|
$2,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,800.000
|
$3,500.000
|
$2,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$600.000
|
$1,000.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$450.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
436.000
|
$10.000
|
$30.000
|
$25.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
2.000
|
$1,200.000
|
$1,500.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$166,982.000
|
$172,000.000
|
$277,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$8,000.000
|
$14,500.000
|
$29,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
50.000
|
$50.000
|
$10.000
|
$42.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
50.000
|
$15.000
|
$5.000
|
$21.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
769.000
|
$25.000
|
$1.000
|
$13.750
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
769.000
|
$7.500
|
$1.000
|
$7.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
795.000
|
$3.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
795.000
|
$1.000
|
$1.000
|
$0.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
475.000
|
$100.000
|
$79.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
450.000
|
$30.000
|
$20.000
|
$20.480
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,000.000
|
$1,000.000
|
$1,050.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$1,000.000
|
$750.000
|
$787.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$5.000
|
$2.500
|
$2.630
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$2,800.000
|
$2,940.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$500.000
|
$250.000
|
$262.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
20.000
|
$2.250
|
$10.000
|
$52.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$550.000
|
$790.000
|
$624.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$650.000
|
$990.000
|
$729.750
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$200.000
|
$100.000
|
$157.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
8.000
|
$75.000
|
$90.000
|
$52.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$50.000
|
$25.000
|
$26.250
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
3.000
|
$50.000
|
$25.000
|
$26.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
LF
|
328.000
|
$1.000
|
$3.000
|
$3.150
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
605.000
|
$1.250
|
$3.000
|
$3.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
409.000
|
$1.500
|
$0.750
|
$4.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
656.000
|
$1.500
|
$0.750
|
$4.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
190.000
|
$1.500
|
$3.000
|
$3.150
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,108.000
|
$2.000
|
$0.900
|
$1.420
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
192.000
|
$6.250
|
$6.500
|
$6.830
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
21.000
|
$200.000
|
$125.000
|
$131.250
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
18.000
|
$200.000
|
$170.000
|
$178.500
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
764.000
|
$6.250
|
$6.500
|
$6.830
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,530.000
|
$1.000
|
$0.500
|
$0.530
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,347.000
|
$1.000
|
$0.450
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
13,121.000
|
$1.000
|
$0.450
|
$0.470
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
529.000
|
$5.000
|
$4.750
|
$4.990
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
196.000
|
$5.000
|
$4.750
|
$4.990
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
4.000
|
$8,300.000
|
$6,000.000
|
$20,000.000
|
|
|
STRIP MOWING
|
AC
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,156.000
|
$90.000
|
$200.000
|
$155.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
4,023.000
|
$110.000
|
$185.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
6,996.000
|
$5.000
|
$0.010
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
260.000
|
$75.000
|
$1.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
79.000
|
$110.000
|
$1.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
39.000
|
$180.000
|
$1.000
|
$500.000
|
|
Totals: |
$1,853,416.250
|
$2,305,368.400
|
$2,958,060.400
|