Bid Cobra

TARRANT FM 718 (1098-02-016)

Items: 50

County: TARRANT
Length: 3.2000 MILES
Highway: FM 718
District: FORT WORTH
Control Number: 1098-02-016
DBE Goal: 6.5%
Project: STP 2025(665)HES
Guaranty: $57,000.00
Time: 88 WORKING DAYS
Engineer's Estimate: $2,846,178.83
Date: 04/03/2025 (1 year ago)
Contract Number: 4253019
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00178897
Contract Type: Federal
Project Description: SAFETY TREAT FIXED OBJECTS, WIDEN PAVED SHOULDER (TO 5 FT. OR LESS), MILLED EDGELINE RUMBLE STRIPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MARIBEL RANGEL
CYNTHIA DELAGARZA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,846,178.83
$2,429,826.66
Over/Under Est: -14.63% -$416,352.17
Over/Under Est: -14% -$398,590.76
Amt Left: 0.73% $17,761.41
Over/Under Est: -12.33% -$350,996.77
Amt Left: 2.69% $65,355.40
Delta: -1.94% -$47,593.99
Over/Under Est: 12.28% $349,376.67
Amt Left: 31.51% $765,728.84
Delta: -28.07% -$700,373.44
Subcontractor Percentage Amount
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 5.72% $138,986.08
TRAFFIC HIGHWAY MAINTENANCE, LLC 3.74% $90,875.52
DALLAS LITE AND BARRICADE, INC. 0.61% $14,821.94
SYNERGY SIGNS & SERVICES LLC 0.10% $2,429.83
Total: 10.17% $247,113.37

Bid Items & Bid Tabulations

50 Total 0 of 50
TARRANT  |  FM 718  |  FORT WORTH  |  1098-02-016  |  04/03/2025  |  $2,846,178.83  |  STP 2025(665)HES  |  HAZARD ELIM & SAFETY  |  88 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAGOE-PUBLIC COMPANY
ED BELL CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 145.000 $4,000.000 $1,750.000 $675.000 $100.000 $2,000.000
RMV (7"-13") TRT/UNTRT BASE & ASPH PAV
SY 2,904.000 $15.000 $12.000 $10.000 $15.000 $20.000
EXCAV (ROADWAY)
CY 2,255.000 $40.000 $40.000 $10.000 $24.000 $20.000
EMBANK (FNL)(DC)(TY B)
CY 899.000 $125.000 $75.000 $120.000 $65.000 $50.000
COMPOST MANUF TOPSOIL (4")
SY 5,682.000 $4.000 $12.000 $10.000 $9.010 $10.000
STRAW OR HAY MULCH
SY 6,243.000 $1.000 $2.000 $1.150 $1.750 $1.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 6,243.000 $3.500 $1.000 $1.000 $1.010 $0.500
BROADCAST SEED (TEMP_WARM)
SY 3,121.500 $1.000 $0.250 $0.750 $0.890 $0.500
BROADCAST SEED (TEMP_COOL)
SY 3,121.500 $1.000 $0.250 $0.750 $0.940 $0.500
FERTILIZER
AC 1.300 $1,090.000 $1,500.000 $700.000 $1,412.000 $5,000.000
VEGETATIVE WATERING
TGL 218.500 $288.750 $140.000 $90.000 $98.630 $20.000
LIME (COM OR QK)(SLURRY)
TON 165.000 $350.000 $325.000 $325.000 $350.000 $500.000
LIME TRT (SUBGRADE) (8")
SY 9,347.000 $10.000 $18.000 $15.000 $15.000 $20.000
PRIME COAT (MULTI OPTION)
GAL 1,877.000 $24.000 $2.000 $11.000 $6.000 $6.000
D-GR HMA TY-B PG64-22
TON 2,381.000 $120.000 $140.000 $150.000 $200.000 $180.000
TACK COAT
GAL 1,448.000 $5.250 $2.000 $3.000 $5.000 $6.000
SP MIXES SP-C SAC-B PG70-28
TON 835.000 $150.000 $210.000 $225.000 $270.000 $200.000
MOBILIZATION
LS 1.000 $258,743.500 $258,000.000 $331,000.000 $245,000.000 $310,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,500.000 $30,000.000 $42,000.000 $55,000.000 $12,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,000.000 $25,000.000 $15,000.000 $12,750.000 $20,000.000
TMA (STATIONARY)
DAY 106.000 $300.000 $225.000 $157.500 $100.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $220.000 $225.000 $1,155.000 $250.000 $550.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $50.000 $25.000 $35.000 $49.990 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $20.000 $10.000 $11.000 $19.500 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,990.000 $6.000 $6.000 $3.750 $5.620 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,990.000 $2.500 $1.000 $1.250 $1.000 $2.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,350.000 $50.000 $95.000 $89.000 $100.000 $100.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 1,020.000 $30.000 $25.000 $21.000 $26.000 $50.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 9,060.000 $15.000 $15.000 $15.750 $16.000 $50.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 2,370.000 $12.000 $15.000 $21.000 $26.000 $30.000
DRIVEWAYS (ACP)
SY 137.000 $100.000 $65.000 $200.000 $250.000 $50.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 32,205.000 $0.750 $0.150 $0.130 $0.250 $0.500
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 16,459.000 $0.800 $0.150 $0.250 $0.250 $0.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 30.000 $2,200.000 $750.000 $1,000.000 $1,500.000 $6,500.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,204.000 $750.000 $750.000 $2,000.000 $3,500.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 8.000 $7,777.500 $1,000.000 $1,250.000 $3,500.000 $15,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $840.000 $1,100.000 $1,365.000 $1,500.000 $1,500.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 48,860.000 $2.500 $0.400 $0.170 $0.150 $0.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 48,216.000 $2.500 $0.400 $0.170 $0.150 $0.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,372.000 $1.000 $2.500 $6.300 $0.500 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,341.000 $1.000 $2.500 $6.300 $0.500 $5.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $1.750 $1.500 $2.000 $1.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $210.000 $280.000 $175.000 $140.000 $500.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $215.000 $330.000 $200.000 $170.000 $500.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 32,205.000 $1.500 $1.000 $1.500 $0.740 $1.500
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 25,478.000 $1.250 $1.000 $1.500 $0.740 $1.500
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 1,460.000 $1.250 $1.000 $1.500 $0.800 $1.500
REFL PAV MRKR TY I-C
EA 20.000 $8.000 $8.000 $12.000 $5.750 $6.000
REFL PAV MRKR TY II-A-A
EA 397.000 $10.000 $8.000 $8.000 $5.750 $6.000
ELIM EXT PM & MRKS (4")
LF 59,236.000 $1.000 $0.900 $0.990 $0.450 $0.500
Totals: $2,846,178.825 $2,429,826.650 $2,447,588.060 $2,495,182.050 $3,195,555.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $25,000.00