Show Job Controls
Bid Cobra

TARRANT IH 30 (1068-01-219)

Items: 31

County: TARRANT
Length: N/A
Highway: IH 30
District: FORT WORTH
Control Number: 1068-01-219
DBE Goal: N/A
Project: NH 1802(381)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $461,482.25
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: LANDSCAPING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$461,482.25
$435,495.90
Over/Under Est: -5.63% -$25,986.35
Over/Under Est: -5.44% -$25,114.70
Amt Left: 0.2% $871.65
Over/Under Est: -3.63% -$16,742.89
Amt Left: 2.12% $9,243.46
Delta: -1.92% -$8,371.81
Over/Under Est: 1.12% $5,186.75
Amt Left: 7.16% $31,173.10
Delta: -4.93% -$21,929.64
Over/Under Est: 9.55% $44,054.75
Amt Left: 16.08% $70,041.10
Delta: -8.33% -$38,868.00

Bid Items & Bid Tabulations

31 Total 0 of 31
TARRANT  |  IH 30  |  FORT WORTH  |  1068-01-219  |  07/11/2018  |  $461,482.25  |  NH 1802(381)  |  LANDSCAPING  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CENTRAL NORTH CONSTRUCTION, LLC
COLE CONSTRUCTION, INC.
C. GREEN SCAPING, L.P.
ENCINO LANDSCAPE, INC.
APEX LANDSCAPE & IRRIGATION, LLC
PREPARING ROW
AC 1.800 $5,000.000 $2,800.000 $7,500.000 $32,000.000 $5,000.000 $15,000.000
REMOVING CONC (RIPRAP)
SY 420.000 $20.000 $35.000 $15.000 $15.000 $30.000 $30.000
BLOCK SODDING
SY 4,739.000 $8.500 $4.100 $3.250 $3.240 $5.000 $8.000
VEGETATIVE WATERING
MG 340.000 $20.000 $18.500 $11.000 $27.000 $20.000 $1.000
IRRIGATION SYSTEM
LS 1.000 $20,000.000 $100,000.000 $35,000.000 $80,000.000 $100,000.000 $125,000.000
PLANT MATERIAL (4" CNTR)
EA 6,458.000 $7.500 $1.000 $1.100 $2.000 $3.000 $4.000
MULCH
CY 693.000 $70.000 $30.000 $20.000 $36.000 $30.000 $30.000
PLANT BED PREPARATION
SY 2,766.000 $5.000 $1.500 $3.000 $10.800 $5.000 $4.000
VEGETATION BARRIER
SY 2,766.000 $2.000 $5.000 $1.000 $2.700 $5.000 $3.000
PLANT MATERIAL (30 GAL) (TREE)
EA 64.000 $475.000 $225.000 $250.000 $160.000 $250.000 $265.000
PLANT MATERIAL (65 GAL) (TREE)
EA 23.000 $925.000 $675.000 $585.000 $240.000 $700.000 $495.000
PLANT MATERIAL (1 GAL) (SHRUB)
EA 596.000 $10.000 $8.000 $8.000 $4.000 $10.000 $8.000
PLANT MATERIAL (3 GAL) (SHRUB)
EA 200.000 $22.500 $11.000 $18.000 $10.000 $30.000 $25.000
LANDSCAPE EDGE (TYPE I)
LF 1,111.000 $20.000 $19.000 $17.000 $19.000 $20.000 $18.000
LANDSCAPE EDGE (TYPE II)
LF 1,226.000 $30.000 $31.000 $28.000 $23.000 $30.000 $18.000
PLANT MAINTENANCE
MO 12.000 $1,800.000 $1,500.000 $2,800.000 $2,400.000 $1,000.000 $2,500.000
IRRIGATION SYSTEM OPER AND MAINT
MO 12.000 $300.000 $900.000 $1,200.000 $1,000.000 $1,000.000 $1,250.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 25.000 $250.000 $50.000 $40.000 $100.000 $50.000 $250.000
FULL - DEPTH REPAIR CRCP (12")
SY 25.000 $500.000 $250.000 $300.000 $140.000 $100.000 $250.000
MOBILIZATION
LS 1.000 $41,134.750 $90,000.000 $60,000.000 $20,000.000 $50,000.000 $50,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $3,000.000 $500.000 $3,800.000 $3,800.000 $3,000.000 $5,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 160.000 $30.000 $4.000 $50.000 $42.000 $30.000 $1.000
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $8.000 $1.000 $8.000 $20.000 $10.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,800.000 $2.500 $0.100 $2.500 $2.700 $5.000 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,800.000 $1.000 $0.100 $0.750 $1.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 180.000 $4.000 $0.100 $3.500 $4.500 $6.000 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 180.000 $1.250 $0.100 $0.750 $2.000 $1.000 $1.000
CONDT (PVC) (SCH 40) (4") (BORE)
LF 369.000 $35.000 $45.000 $35.000 $29.000 $40.000 $28.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 90.000 $100.000 $10.000 $75.000 $115.000 $200.000 $175.000
TMA (STATIONARY)
EA 5.000 $2,000.000 $100.000 $15,000.000 $2,800.000 $1,000.000 $300.000
CURB INLET SEDIMENT PROTECTION
LF 36.000 $6.500 $50.000 $25.000 $18.000 $20.000 $10.000
Totals: $461,482.250 $435,495.900 $436,367.550 $444,739.360 $466,669.000 $505,537.000