Bid Cobra

TARRANT IH 30 (1068-01-216)

Items: 81

County: TARRANT
Length: N/A
Highway: IH 30
District: FORT WORTH
Control Number: 1068-01-216
DBE Goal: N/A
Project: BR 1702(737)
Guaranty: N/A
Time: 128 WORKING DAYS
Engineer's Estimate: $932,365.00
Date: 08/08/2017 (8 years ago)
Contract Number: N/A
Type: GR, BS, DR, PAV
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$932,365.00
$997,337.74
Over/Under Est: 6.97% $64,972.74
Over/Under Est: 10.39% $96,843.45
Amt Left: 3.2% $31,870.71
$1,235,043.32
Over/Under Est: 32.46% $302,678.32
Amt Left: 23.83% $237,705.58
Delta: -20.00% -$205,834.87
$1,362,260.90
Over/Under Est: 46.11% $429,895.90
Amt Left: 36.59% $364,923.16
Delta: -10.30% -$127,217.58
Over/Under Est: 48.62% $453,328.14
Amt Left: 38.94% $388,355.40
Delta: -1.72% -$23,432.24

Bid Items & Bid Tabulations

81 Total 0 of 81
TARRANT  |  IH 30  |  FORT WORTH  |  1068-01-216  |  08/08/2017  |  $932,365.00  |  BR 1702(737)  |  GR, BS, DR, PAV  |  128 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
IOWA BRIDGE & CULVERT, LC
RAGLE CONSTRUCTION, INC.
REBCON, INC.
HAYDON BUILDING CORP.
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 6.000 $3,500.000 $5,000.000 $16,700.000 $1,600.000 $15,600.000 $13,650.000
REMOVING CONC (PAV)
SY 724.000 $15.000 $24.000 $8.000 $15.000 $30.000 $17.850
REMOVING CONC (RIPRAP)
SY 141.000 $20.000 $24.000 $8.000 $22.870 $50.000 $31.500
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 92.000 $15.000 $75.000 $8.000 $27.680 $18.000 $21.000
EXCAVATION (ROADWAY)
CY 169.000 $25.000 $20.000 $60.000 $18.550 $20.000 $42.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 169.000 $25.000 $35.000 $60.000 $26.190 $30.000 $42.000
BLOCK SODDING
SY 780.000 $10.000 $4.120 $8.000 $5.000 $4.750 $4.400
BROADCAST SEED (TEMP) (WARM)
SY 390.000 $2.000 $1.550 $1.500 $1.650 $1.750 $1.650
BROADCAST SEED (TEMP) (COOL)
SY 390.000 $2.000 $1.550 $1.500 $1.650 $1.750 $1.650
VEGETATIVE WATERING
MG 27.000 $25.000 $77.250 $18.000 $175.000 $40.000 $26.400
LIME (HYD, COM, OR QK(SLURRY))
TON 15.000 $200.000 $216.300 $155.000 $162.800 $170.000 $168.000
LIME TRT (SUBGRADE)(8")
SY 898.000 $6.000 $8.760 $4.750 $9.500 $12.000 $7.350
PRIME COAT (MULTI OPTION)
GAL 180.000 $12.000 $9.270 $9.000 $10.000 $10.000 $15.790
D-GR HMA(SQ) TY-B PG64-22
TON 200.000 $80.000 $131.840 $90.500 $180.200 $135.000 $105.600
PLANE ASPH CONC PAV(0" TO 2")
SY 364.000 $5.000 $15.970 $15.000 $10.430 $19.000 $24.200
CONC PVMT (CONT REINF - CRCP) (8")
SY 727.000 $75.000 $112.270 $90.000 $110.000 $110.000 $84.000
CURB (TYPE II)
LF 469.000 $20.000 $5.150 $10.000 $10.000 $3.000 $5.250
TRENCH EXCAVATION PROTECTION
LF 131.000 $10.000 $9.270 $1.000 $5.500 $12.000 $10.500
TEMPORARY SPL SHORING
SF 410.000 $15.000 $1.000 $35.000 $25.000 $100.000 $44.000
CL C CONC (VEH DEFL WALL)(HPC)
CY 66.000 $1,200.000 $1,000.000 $480.000 $800.000 $405.000 $735.000
REINF CONC SLAB (HPC)
SF 3,796.000 $25.000 $22.000 $35.000 $25.000 $40.000 $42.000
APPROACH SLAB (HPC)
CY 73.000 $500.000 $450.000 $450.000 $700.000 $475.000 $525.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 152.000 $25.000 $25.000 $5.000 $22.000 $22.000 $22.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 14.000 $450.000 $500.000 $580.000 $550.000 $700.000 $630.000
RIPRAP (MOW STRIP)(5 IN)
CY 50.000 $550.000 $400.000 $460.000 $600.000 $520.000 $630.000
STR STEEL (SHEAR CONNECTOR)
LB 1,614.000 $10.000 $11.280 $6.000 $20.000 $7.000 $6.300
CLEAN & PAINT EXIST STR (SYSTEM II)
LS 1.000 $80,000.000 $203,500.000 $50,000.000 $210,000.000 $220,000.000 $177,500.000
RAIL (TY T401)(HPC)
LF 346.000 $180.000 $125.000 $130.000 $137.000 $135.000 $157.500
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 84.000 $100.000 $90.000 $85.000 $110.000 $90.000 $46.000
RC PIPE (CL III)(24 IN)
LF 120.000 $75.000 $74.160 $65.000 $143.000 $130.000 $94.500
INLET (COMPL)(PCO)(4FT)(NONE)
EA 1.000 $5,500.000 $3,554.000 $3,700.000 $4,840.000 $7,000.000 $6,300.000
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 1.000 $6,000.000 $4,378.000 $3,600.000 $4,950.000 $7,500.000 $6,300.000
INLET (COMPL)(PSL)(RH)(4FTX4FT)
EA 1.000 $4,200.000 $3,863.000 $3,600.000 $5,500.000 $6,000.000 $6,300.000
REMOV STR (INLET)
EA 1.000 $1,000.000 $1,030.000 $600.000 $1,100.000 $2,000.000 $630.000
REMOV STR (MANHOLE)
EA 1.000 $2,000.000 $1,545.000 $600.000 $1,100.000 $2,500.000 $945.000
REMOV STR (PIPE)
LF 16.000 $50.000 $25.750 $16.000 $44.000 $200.000 $21.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $25,000.000 $25,000.000 $111,000.000 $80,000.000 $80,000.000 $31,500.000
REMOV STR (APPROACH SLAB)
EA 2.000 $7,500.000 $8,000.000 $1,000.000 $5,000.000 $4,000.000 $4,200.000
ADJUST STL SHOES
EA 8.000 $2,000.000 $1,000.000 $1,500.000 $3,200.000 $6,500.000 $1,575.000
MOBILIZATION
LS 1.000 $84,761.000 $99,000.000 $100,000.000 $73,500.000 $135,000.000 $193,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $5,000.000 $15,000.000 $21,000.000 $14,800.000 $31,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 725.000 $5.000 $1.800 $1.750 $1.930 $2.250 $1.930
TEMP SEDMT CONT FENCE (REMOVE)
LF 725.000 $2.000 $0.520 $0.500 $0.550 $0.600 $0.550
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 45.000 $10.000 $6.440 $6.250 $6.880 $7.500 $6.880
BIODEG EROSN CONT LOGS (REMOVE)
LF 45.000 $2.000 $15.450 $15.000 $16.500 $1.750 $16.500
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 510.000 $15.000 $25.000 $13.390 $22.240 $15.000 $21.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 150.000 $7.500 $10.000 $9.850 $18.920 $17.000 $10.500
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 510.000 $11.000 $12.000 $13.190 $19.940 $9.000 $21.000
MTL W-BEAM GD FEN (STEEL POST)
LF 475.000 $30.000 $20.100 $19.500 $21.450 $21.000 $21.450
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $1,495.000 $1,450.000 $1,595.000 $1,900.000 $2,006.890
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,800.000 $953.000 $925.000 $1,017.500 $940.000 $1,017.500
MTL BM GD FEN TRANS (NON - SYM)
EA 1.000 $1,500.000 $515.000 $500.000 $550.000 $470.000 $550.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000 $5.000 $4.120 $4.000 $4.400 $7.000 $4.400
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $350.000 $155.000 $150.000 $165.000 $260.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $2,215.000 $2,150.000 $2,365.000 $2,300.000 $2,365.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $500.000 $309.000 $300.000 $330.000 $260.000 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $3,000.000 $618.000 $1,475.000 $1,622.500 $2,200.000 $1,013.640
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,800.000 $824.000 $775.000 $852.500 $1,600.000 $1,013.650
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $12,500.000 $1,133.000 $8,087.500 $8,896.250 $10,000.000 $9,450.000
REMOVE GROUND BOX
EA 1.000 $500.000 $773.000 $400.000 $500.000 $600.000 $275.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $1,000.000 $773.000 $800.000 $550.000 $600.000 $790.760
REMOVE SM RD SN SUP&AM
EA 1.000 $500.000 $515.000 $300.000 $300.000 $400.000 $104.380
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 4.000 $45.000 $34.000 $33.000 $36.300 $29.000 $36.300
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 3.000 $40.000 $34.000 $33.000 $36.300 $29.000 $36.300
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 2.000 $40.000 $21.650 $21.000 $23.100 $29.000 $23.100
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 2.000 $40.000 $21.650 $21.000 $23.100 $29.000 $23.100
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 825.000 $3.000 $2.600 $0.650 $2.970 $3.150 $2.970
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 923.000 $3.000 $2.600 $0.800 $2.970 $3.150 $2.970
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 318.000 $10.000 $3.350 $6.500 $4.510 $4.850 $4.510
PAVEMENT SEALER 4"
LF 925.000 $0.500 $1.030 $0.450 $0.550 $0.600 $0.550
PAVEMENT SEALER 12"
LF 210.000 $1.500 $1.550 $1.500 $1.100 $1.200 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 783.000 $2.000 $2.600 $0.400 $1.380 $1.350 $1.380
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 962.000 $2.000 $2.600 $0.750 $1.380 $1.350 $1.380
REFL PAV MRKR TY II-C-R
EA 16.000 $10.000 $6.200 $6.000 $11.000 $11.750 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 893.000 $1.500 $1.050 $0.600 $1.870 $1.950 $1.870
PAV SURF PREP FOR MRK (4")
LF 925.000 $0.200 $0.550 $0.250 $1.100 $1.200 $1.100
PAV SURF PREP FOR MRK (12")
LF 210.000 $1.000 $1.050 $1.500 $2.200 $2.300 $2.200
PAV SURF PREP FOR MRK (RPM)
EA 16.000 $10.000 $1.050 $1.000 $1.710 $1.800 $1.710
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 16.000 $100.000 $41.200 $150.000 $150.000 $68.000 $220.820
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $7,985.000 $6,000.000 $14,000.000 $2,500.000 $9,450.000
CURB INLET SEDIMENT PROTECTION
LF 100.000 $15.000 $7.750 $7.500 $10.000 $24.000 $15.000
Totals: $932,365.000 $997,337.740 $1,029,208.450 $1,235,043.320 $1,362,260.900 $1,385,693.140